Tender Value
₹26.6 L
EMD Value
₹33,300
Closing Date
15 Jun 2026, 4:00 pm
Staff Officer(Civil), WNA
AGM Office Bhallar Township Wani North Area.
Providing Barbed wire fencing to top of working pit of KPOCM under KP-PPG SA of WNA.
2026_WCL_360682_1
wn4650-civ-e019-2026-27 Date 03.06.2026
Open Tender
Civil Works - Others
45 days
KP-PPG SA
Please refer Tender documents.
3 documents required · 3 mandatory
₹33,300
3 Jun 2026
3 Jun 2026
16 Jun 2026
4 Jun 2026
15 Jun 2026
4 Jun 2026
4 Jun 2026 - 8 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Item Description/ Heading (Note:- The Work is to executed as per the STC attached in the Tender document) | ||||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. | 168.86 | Cum | 200.85 | ₹33,915.53 | BI01010001010000000000000515BI0100001113 |
| 1.02 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement: 3 coarse sand (zone-III) derived from natural sources: 6 graded stone aggregate 40 mm nominal size derived from natural sources) | 168.86 | Cum | 6,287.2 | ₹10,61,656.59 | - |
| 1.03 | Supplying at site:
R.C.C. Standards post/ struts/rails/pales of mix 1:1.5:3 (1cement: 1.5 coarsesand : 3 graded stone aggregate 12.5mm nominal size) with wooden plugs or 6mm bar nibs wherever required as per direction of Engineer-in-charge(cost of earth works in oxcavation, concrete works in foundation to be paid separately) | 28.79 | Cum | 27,336.6 | ₹7,87,020.71 | - |
| 1.04 | Fencing with R.C.C. post placed at required distance, embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post one side only, provided with horizontal lines and two diagonals of barbed wire weighing 9.38 kgper 100 metres (minimum), between the two posts fitted and fixed with G.I. staples on wooden plugs or G.I. bindingwire tied to 6 mm bar nibs fixed while casting the post(cost of R.C.C.posts, struts, earth work and concrete to be paid for separately) :-Payment to be made per metre cost of total length of barbed wire used.With G.I. barbed wire | 25,015.5 | mtr | 11.8 | ₹2,95,182.9 | - |
| 1.05 | Clearing jungle including uprooting of rank vegetation, grass,
brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | 5,600 | Sqm | 13.85 | ₹77,560 | - |
| 2 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - | BI01010001010000000000000515BI0100001117 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.80 MB
BOQ_373550.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid