Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.1 LAdmitted-Fee/PreQual/Technical/Finance | -32.35% | ₹3.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹3.2 L+₹2,587.10 (0.83%)Admitted-Fee/PreQual/Technical/Finance | -31.79% | ₹3.2 L+₹2,587.10 (0.83%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹3.4 L+₹24,716.02 (7.91%)Admitted-Fee/PreQual/Technical/Finance | -27.00% | ₹3.4 L+₹24,716.02 (7.91%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹3.4 L+₹28,827.66 (9.22%)Admitted-Fee/PreQual/Technical/Finance | -26.11% | ₹3.4 L+₹28,827.66 (9.22%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹3.5 L+₹33,955.66 (10.9%)Admitted-Fee/PreQual/Technical/Finance | -25.00% | ₹3.5 L+₹33,955.66 (10.9%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4.6 L
EMD Value
₹9,500
Closing Date
6 May 2026, 3:00 pmClosed
Executive Engineer IFC Handwara
Executive Engineer IFC Handwara
Construction of Steel flume on Kukroosa Khul at Kenyal.
2026_IFC_308695_1
05.IFCDHND.2026.27
Open Tender
Civil Works
Percentage
Executive Engineer IFCD Handwara
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer IFC Handwara
₹9,500
18 May 2026
25 Apr 2026
7 May 2026
25 Apr 2026
6 May 2026
25 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 56.4 | Cum | 187.3 | ₹10,563.72 |
| 2 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Welded | 2,342.37 | kg | 138.2 | ₹3,23,715.53 |
| 3 | Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer’s specifications including appropriate priming coat, preparation of surface, etc complete. (On steel work) | 31.2 | sqm | 197.8 | ₹6,171.36 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:1½:3 (1 cement :1½ coarse sand: 3 graded stone aggregate 20 mm nominal size) Crushed. | 11.14 | Cum | 7,275.25 | ₹81,046.29 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for : Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs and steps etc | 38.92 | sqm | 628.95 | ₹24,478.73 |
| 6 | Providing and fixing of steel sign board 450mm X 450mm including painting and letters, complete job. | 1 | No. | 2,500 | ₹2,500 |
| 7Carriage of materials by M/T incld. Loading, unloading and stacking. | |||||
| 7.1 | Stone agg. 20mm by an avg lead of 12kms | 9.35 | Cum | 305.22 | ₹2,853.81 |
| 7.2 | Sand by avg lead of 20kms | 4.67 | Cum | 409.94 | ₹1,914.42 |
| 7.3 | Cement by an avg lead of 10kms | 4.47 | MT | 248.03 | ₹1,108.69 |
stage.html
html • 0.04 MB
finance_1000101.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.16 MB
BOQ_1000101.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .