Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 CrAccepted-AOC PERAMBALUR | TAMIL NADU | 621101 | L1 | Accepted-AOC Tender approved by the Commissnorate of Tenders, Chennai | |
| 2 | L2₹3.2 Cr+₹4.4 L (1.40%)Rejected-Finance 17E COLLECTOR OFFICE ROAD VENKATHESAPURAM SUNDAR NAGAR EXTENSION NEAR DIC PERAMBALUR 621 212 | PERAMBALUR | TAMIL NADU | 621212 | L2 | Rejected-Finance Other than Lowest | |
| 3 | L3₹3.3 Cr+₹16.1 L (5.12%)Rejected-Finance 1 367 SIVAN KOVIL STREET THONDAMATHURAI POST 621103 VEPPANTHATTAI TALUK PERAMBALUR DISTRICT | PERAMBALUR | TAMIL NADU | 621103 | L3 | Rejected-Finance Other than Lowest |
Tender Value
Refer Docs
EMD Value
₹1.6 L
Closing Date
14 Sept 2021, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer(H) NABARD and RR Trichy
Office of the Superintending Engineer, Highways Department, NABARD and RR Circle, Plot No.372, Rajaram Salai, KK Nagar, Trichy-620021
Reconstruction of Bridge at Km 2/6 of Kallakudi - Palanganatham Road.
2021_HWAY_208603_5
TN.No.07/2021-2022/SDO/TRY-NRR
Open Tender
Civil Works - Bridges
Percentage
270 days
Ariyalur
As per PQ Document
6 documents required · 6 mandatory
₹0
₹1.6 L
Trichy
30 Apr 2022
30 Aug 2021
16 Sept 2021
30 Aug 2021
14 Sept 2021
2 Sept 2021
31 Aug 2021
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling the existing Brick / Stone Masonry in cement Mortar under 3m height in the existing causeway / bridge ad clearing away from the work site and carefully stacking the usefull materials for reuse on the road side as directed by the departmental officer including all labour and incidental charges etc., complete. as per MORT&H Vth Revision 111, 112, 202 | 56 | Cubic Metre | 193 | ₹10,808 |
| 2 | Dismantaling the Plain Cement Concrete Structure and removal and disposing of resulting materials and back filling the resulting trenches and pits etc. or as directed by the departmental officer including all labour and incidental charges etc., complete. as per MORT&H Vth Revision 111, 112, 202 | 89 | Cubic Metre | 332 | ₹29,548 |
| 3 | Dismantaling the RCC pipes removal and disposing of resulting materials and back filling the resulting trenches and pits etc., complete as per MORT&H Vth Revision 111, 112, 202 | 150 | Running Metre | 100 | ₹15,000 |
| 4 | Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS 20 B including cost of all labour materials, tools equipments and all incidental charges and sheeting, shoring and bracing and their subsequent removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification for DRESSING THE BED UPTO SILL LEVEL AND LAUNCHING APRON as per MORT&H Vth Revision 304. | 579 | Cubic Metre | 84 | ₹48,636 |
| 5 | Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS 20 B including cost of all labour materials, tools equipments and all incidental charges and sheeting, shoring and bracing and their subsequent removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification for FOUNDATION OF RAFT, CUT OFF WALLS AND TOE WALLS as per MORT&H Vth Revision 304. | 1,785 | Cubic Metre | 326 | ₹5,81,910 |
| 6 | Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS 20 B including cost of all labour materials, tools equipments and all incidental charges and sheeting, shoring and bracing and their subsequent removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification for BED PROTECTION AND LAUNCHING APRON as per MORT&H Vth Revision 304. | 315 | Cubic Metre | 221 | ₹69,615 |
| 7 | Plain Cement Concrete M10 (Nominal mix 1:3:6) using HBG graded metal 40mm and below ISS size including cost and conveyance of all materials to work site, but including cost and labour charges for form work and centering labour charges for compacting, curing, including all incidental charges etc., complete for LEVELLING COURSE BELOW RCC RAFT & RCC PROTECTIVE APRON (Below Sill Level). | 96.2 | Cubic Metre | 4,659 | ₹4,48,195.8 |
| 8 | Vibrated Reinforced Cement Concrete M30 (Design Mix) using HBG graded metal 20mm and 12mm ISS size including cost and conveyance of all materials to work site, but excluding cost and conveyance and fabrication of steel but including cost and labour charges for form work and centering labour charges for compacting, curing, including all incidental charges etc., complete for FOUNDATION OF CUT OFF WALL (Below sill level) as per MORT&H Vth Revision 1500, 1600, 1700, 2200 | 117.4 | Cubic Metre | 15,878 | ₹18,64,077.2 |
| 9 | Vibrated cement concrete M20 Grade (Nominal mix 1:1:.5:3) using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges, compacting, curing and all incidental charges etc., complete as per relevant specification for FOUNDATION OF TOE WALL FOR BED PROTECTION (RIGID APRON) AND LAUNCHING APRON (Below Sill level) as per MORT&H Vth Revision 1000, 1500, 1700, 2100 | 230.3 | Cubic Metre | 7,643 | ₹17,60,182.9 |
| 10 | Filling inside the Raft with M.sand (Crushed stone sand) including cost and conveyance of M-sand to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering, with all leads for water and all other incidental charges etc., complete as per MORT&H 304. | 985 | Cubic Metre | 1,538 | ₹15,14,930 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
Tender Document • 0.11 MB
PRICEBIDVOLII_KALLAKUDI.pdf
Tender Document • 0.63 MB
Amendment07.pdf
Tender Document • 0.62 MB
PQVOLI_KALLAKUDI.pdf
Tender Document • 0.31 MB
BOQ_247591.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .