Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 LAccepted-AOC BELPAHAR PIPLIMAL JHARSUGUDA ODISHA 768217 | BELPAHAR | JHARSUGUDA | ODISHA | 768217 | ₹1.4 L Quoted ₹1.2 L | L1 | Accepted-AOC On being L1 |
| 2 | L2₹1.3 LRejected-Finance | ₹1.3 L | L2 | Rejected-Finance On being L2 |
| 3 | L3₹1.4 LRejected-Finance | ₹1.4 L | L3 | Rejected-Finance On being L3 |
| Sl No | Description | Qty | Unit | Rajkishore Deb L2 | M/s M.A. ENGINEERING WORKS L1 | Sumanta Charan & Co L3 |
|---|---|---|---|---|---|---|
| 1.00Clutch System and Propeller Shaft Work | ||||||
| 1.01 | Replacement of Clutch plate | 1 | No. | 14,000 ₹14,000 | 12,600 ₹12,600 | 14,938.5 ₹14,938.50 |
| 1.02 | Replacement of Pressure plate | 1 | No. | 17,200 ₹17,200 | 16,057 ₹16,057 | 18,465 ₹18,465 |
| 1.03 | Replacement of release bearing | 1 | No. | 3,000 ₹3,000 | 2,785 ₹2,785 | 3,202 ₹3,202 |
| 1.04 | Replacement of Water Pump Assembly | 1 | No. | 4,900 ₹4,900 | 4,500 ₹4,500 | 5,175 ₹5,175 |
| 1.05 | Replacement of Propeller Shaft with Yoke Teeth | 1 | Set | 8,600 ₹8,600 | 7,850 ₹7,850 | 9,027 ₹9,027 |
| 1.06 | Replacement of Tie Rod end | 2 | Nos. | 1,100 ₹2,200 | 1,000 ₹2,000 | 1,150 ₹2,300 |
| 1.07 | Replacement of U/J Cross | 2 | Nos. | 2,300 ₹4,600 | 2,100 ₹4,200 | 2,415 ₹4,830 |
| 1.08 | Replacement of Cross Holder | 1 | No. | 3,500 ₹3,500 | 3,200 ₹3,200 | 3,680 ₹3,680 |
| 1.09 | Replacement of Center Bearing | 1 | No. | 3,300 ₹3,300 | 3,000 ₹3,000 | 3,450 ₹3,450 |
Tender Value
₹1.4 L
EMD Value
₹1,800
Closing Date
9 Mar 2026, 5:00 pmClosed
Pramod Swarnkar, Sr. Manager (EnM)
Office of the Project Engineer (EnM), ILBL OCP, Lakhanpur Area, MCL
Repairing of vehicle No. OD-23J/1123 (TATA Truck LPT1613 CRI6 BS-IV) of ILBL OCP, Lakhanpur Area, MCL
2026_MCL_354561_1
MCL/LKPA/ILBL/ePC-EM/25-26/58
Open Tender
Miscellaneous Works
10 days
EnM Dept., ILBL OCP, Lakhanpur Area, MCL
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,800
21 May 2026
26 Feb 2026
11 Mar 2026
26 Feb 2026
9 Mar 2026
26 Feb 2026
26 Feb 2026 - 2 Mar 2026
Clutch System and Propeller Shaft Work
Replacement of Clutch plate
Replacement of Pressure plate
Replacement of release bearing
Replacement of Water Pump Assembly
Replacement of Propeller Shaft with Yoke Teeth
Replacement of Tie Rod end
Replacement of U/J Cross
Replacement of Cross Holder
Replacement of Center Bearing
Replacement of Shaft bolt
Wheel and Brake Work
Rear Wheel Stud with Nut
Hub bearing (R) Inner
Hub bearing (R) Outer
Distance Piece
Brake drum Rear
Oil Seal Rear (Inner & Outer)
Replacement of Front Wheel bearing (Inner)
Replacement of Brake lining front with rivet
Replacement of Brake lining rear with rivet
Repacement of Oil seal front & rear
Grease
Brake Rachet Rear
Spring leaf work
Replacement of Rear Spring main
Replacement of Rear Spring main 2nd
Replacement of Rear Spring main 3rd
Replacement of Rear Spring main 2nd (Aux)
Replacement of Pin & Bush
Replacement of U Bolt (Rear)
Replacement of Center bolt
Alternator
Alternator Repairing
Wiring checking
General Maintenance work
Replacement of set of Air filter element
Replacement of fuel filter
Labour charges
Labour charges for Clutch Work
Labour charges for Wheel & Brake Work
Labour charges for Spring leaf Work
Total impact of Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.57 MB
Tendernotice_2.pdf
PDF • 1.03 MB
BOQ_367380.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid