Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.1 LAccepted-AOC | L1 | Accepted-AOC Lowest Rates | |
| 2 | L2₹22.4 L+₹36,153 (1.64%)Rejected-AOC RADAUR | KARNAL | HARYANA | 132001 | L2 | Rejected-AOC Higher Rates | |
| 3 | L3₹22.5 L+₹37,189 (1.68%)Rejected-AOC | L3 | Rejected-AOC Higher Rates |
Tender Value
₹22.9 L
EMD Value
₹22,850
Closing Date
12 Dec 2023, 5:00 pmClosed
President
Municipal Committee Shahabad
Const. of Drain / Nala Ward No. 05 under MC Shahabad
2023_HRY_328863_1
2023605F7B6B E302 43CD 80B0 29E8B7DBAC42303ULB
Open Tender
Civil Works
Works
150 days
Shahbad
2 documents required · 2 mandatory
₹5,000
Yes
₹22,850
Yes
24 Dec 2023
15 Nov 2023
13 Dec 2023
15 Nov 2023
12 Dec 2023
15 Nov 2023
Amount
[3.1.2]By Mechanical Transport including loading, unloading and stacking 2. Earth
[5.23.2]Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 2. Nominal concrete 1:2:4 or leaner mix (i/c equivalent design mix)
[6.1.2]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
[6.14.1]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size)
[6.15.1]Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor four level, excluding cost of centering, shuttering, finishing and reinforcement : 1. 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size)
[6.29.1]Centering and shuttering including strutting, propping etc. and removal of form work for : 1. Foundations, footings, bases for columns
[6.30.16.1]Centering and shuttering including strutting, propping etc. and removal of form for 16.1. Edges of slabs and breaks in floors and walls Under 20 cm wide
[6.30.3]Centering and shuttering including strutting, propping etc. and removal of form for 3. Suspended floors, roofs, landings, balconies and access platform
[6.33.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level 6. Thermo-Mechanically Treated bars of grade Fe-500D or more.
Providing and Fixing PVC Pipe 10` dia
The Shivay Coop Labour And Construction Society Limited Radaur
The Lord Krishna Coop. Society Ltd
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .