Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.3 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹15.0 L+₹70,470.41 (4.92%)Admitted-Finance FLAT NO 3 BRIJDHAM COMPLEX KDA COLONY AZAD NAGAR KANPUR NAGAR UTTAR PRADESH 208002 | KANPUR NAGAR | UTTAR PRADESH | 208002 | L2 | Admitted-Finance | |
| 3 | L3₹15.2 L+₹90,720.86 (6.33%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹15.4 L+₹1.0 L (7.27%)Admitted-Finance JHANWAR DRAIN KE KINSARA 3 500 PER JANPAD KASGANJ ALIGARH KHAND GANGA NAHAR ALIGARH | KASGANJ | UTTAR PRADESH | 207123 | L4 | Admitted-Finance | |
| 5 | L5₹15.5 L+₹1.1 L (8.02%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s T.S. CONTRACTOR AND SUPPLIER L6 | M/S RAJ KUMAR AND SONS L2 | M/S K P CONTRACTOR L5 | M/s Ram Naresh contractor L4 | M/s PARSADI LAL CONTRACTOR L3 | M/S. SUDHIR ENTERPRISES L7 | M/s GAYATRI CONTRACTOR and SUPPLER L1 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling brick work or stone work and cement concrete in cement mortar and including stacking of material with in a distance of 60 m as per direction of Engineer in charge | 16.7 | Cum | 400 ₹6,679.2 Lowest | 400 ₹6,679.2 Lowest | 440 ₹7,347.12 | 490 ₹8,182.02 | 433.31 ₹7,235.36 | 455.84 ₹7,611.62 | 500 ₹8,349 |
| 2.00 | Earth work in Foundation in dry ordinary soil including liftup to 1.50 meter and lead up to 30 meter including back filling, watering and ramming of excavated earth including cost of all materials, labour , dewatering and T&P complete etc . | 214.29 | Cum | 60 ₹12,857.34 | 80 ₹17,143.12 | 75.1 ₹16,093.1 | 95 ₹20,357.46 | 83.65 ₹17,925.28 | 88 ₹18,857.43 | 50 ₹10,714.45 Lowest |
| 3.00 | Cement concrete 1:4:8 in foundation with cement, coarse sand , and stone grit 20-40 mm size including cost of all materials, labour , T&P complete etc . | 42.24 | Cum | 4,200 ₹1,77,403.8 Lowest | 4,600 ₹1,94,299.4 | 4,808.8 ₹2,03,118.9 | 4,650 ₹1,96,411.35 | 4,726.89 ₹1,99,659.28 | 4,972 ₹2,10,012.31 | 4,500 ₹1,90,075.5 |
| 4.00 | Ist class brick work (M 15) in 1:4 C.M. cement and coarse sand including cost of all materials, Labour and T& P etc | 166.98 | Cum | 5,000 ₹8,34,895 | 4,200 ₹7,01,311.8 Lowest | 4,394.7 ₹7,33,822.61 | 4,200 ₹7,01,311.8 Lowest | 4,319.85 ₹7,21,324.73 | 4,544.5 ₹7,58,835.4 | 5,000 ₹8,34,895 |
| 5.00 | Cement Pointing(Struck deep) on Brick Masonry with cement mortar 1:2 including cost of all materials, Labour and T& P etc | 156.38 | Sqm | 80 ₹12,510.72 | 122 ₹19,078.85 | 119.5 ₹18,687.89 | 138 ₹21,580.99 | 117.49 ₹18,372.93 | 123.6 ₹19,328.44 | 60 ₹9,383.04 Lowest |
| 6.00 | Centering and shuttering of C.C. work including rent of shuttering material, labour and T&P required for proper completion of work for slab, lintel,sun shades, columns and wall etc | 65.86 | Sqm | 350 ₹23,052.4 | 475 ₹31,285.4 | 489.32 ₹32,228.57 | 550 ₹36,225.2 | 480.99 ₹31,679.79 | 506 ₹33,327.18 | 300 ₹19,759.2 Lowest |
| 7.00 | Cement concrete 1:2:4 in Floor with cement, coarse sand , and stone grit 10-20 mm size including cost of all materials, labour , T&P complete etc . | 18.31 | Cum | 5,001 ₹91,573.31 Lowest | 5,200 ₹95,217.2 | 5,460.2 ₹99,981.72 | 6,395 ₹1,17,098.85 | 5,367.19 ₹98,278.67 | 5,646.3 ₹1,03,389.4 | 6,500 ₹1,19,021.5 |
| 8.00 | R.C.C in 1:1.5:3 (M 200) with cement, coarse sand , and stone grit 10-20 mm. including cost of all materials labour T&P complete etc . | 6.75 | Cum | 6,000 ₹40,482 | 5,800 ₹39,132.6 Lowest | 6,446.6 ₹43,495.21 | 7,510 ₹50,669.97 | 6,335.86 ₹42,748.05 | 6,665.34 ₹44,971.05 | 6,800 ₹45,879.6 |
| 9.00 | C.C in 1:1.5:3 (M 200) with cement, coarse sand , and stone grit 10-20 mm. including cost of all materials labour T&P complete etc . | 4.05 | Cum | 5,000 ₹20,250 Lowest | 5,200 ₹21,060 | 5,896.79 ₹23,882 | 6,800 ₹27,540 | 5,796.34 ₹23,475.19 | 6,097.74 ₹24,695.85 | 6,500 ₹26,325 |
| 10.00 | Reinforced steel including bending, binding,cutting and placing in position including cost of matarial and labour complete. | 0.64 | MT | 50,000 ₹31,750 | 50,000 ₹31,750 | 55,682.6 ₹35,358.45 | 6,450 ₹4,095.75 Lowest | 54,733.87 ₹34,756.01 | 57,580.16 ₹36,563.4 | 70,000 ₹44,450 |
Tender Value
Refer Docs
EMD Value
₹1.7 L
Closing Date
19 May 2022, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
ICD Firozabad Hq Shikohabad
Reconstruction of Head Regulator at Katora Minor
2022_UPIDC_699205_9
02/EE/2022-23
Open Tender
Civil Works - Canal
Item Rate
180 days
Reconstruction of Head Regulator at Katora Minor
Please refer tender docuemts
2 documents required · 2 mandatory
₹354
Executive Engineer
₹1.7 L
24 May 2022
13 May 2022
20 May 2022
13 May 2022
19 May 2022
13 May 2022
90 days
Amount
Dismantling brick work or stone work and cement concrete in cement mortar and including stacking of material with in a distance of 60 m as per direction of Engineer in charge
Earth work in Foundation in dry ordinary soil including liftup to 1.50 meter and lead up to 30 meter including back filling, watering and ramming of excavated earth including cost of all materials, labour , dewatering and T&P complete etc .
Cement concrete 1:4:8 in foundation with cement, coarse sand , and stone grit 20-40 mm size including cost of all materials, labour , T&P complete etc .
Ist class brick work (M 15) in 1:4 C.M. cement and coarse sand including cost of all materials, Labour and T& P etc
Cement Pointing(Struck deep) on Brick Masonry with cement mortar 1:2 including cost of all materials, Labour and T& P etc
Centering and shuttering of C.C. work including rent of shuttering material, labour and T&P required for proper completion of work for slab, lintel,sun shades, columns and wall etc
Cement concrete 1:2:4 in Floor with cement, coarse sand , and stone grit 10-20 mm size including cost of all materials, labour , T&P complete etc .
R.C.C in 1:1.5:3 (M 200) with cement, coarse sand , and stone grit 10-20 mm. including cost of all materials labour T&P complete etc .
C.C in 1:1.5:3 (M 200) with cement, coarse sand , and stone grit 10-20 mm. including cost of all materials labour T&P complete etc .
Reinforced steel including bending, binding,cutting and placing in position including cost of matarial and labour complete.
Earth Work in repairing bank and internal and outer section during construction in all type of soil including all lead, lift and T&P etc required for proper completion of item of work.
Laying brick on edge soling including cost of all material, labour, T&P etc.
Expansion joint with bitumen & saw dust. including cost of all materials, labour T &P etc or Thermocol.
Supplying and Fixing 90 mm dia drainage pipe.
Supplying and Laying Inverted Graded Filter
Coarse Sand
Stone Grit 10-20 mm
Providing and Laying Stone Boulder size upto 40 kg. in apron in canal with cost of all matarial labour complete.
Finishing walls with exterior emulsion paint (Apex) of approved brand and manufacture and of required shade on undacorated wall surface to give even shade over @ 1.25 Ltr/10sqm including one coat of primer applid @ 0.75Ltr/10sqm coat curing and cost of all material, labour, T&P etc. required for proper completion of work.for two coat.
Hiring of diesel pumps 5 HP including operater POL and maintenance
Supply and filling of old/used Empty cement bages with local earth/RBm/Silt hand sewing with suja and sutli and placing in position with in 60 M royalty etc complete including all taxes .
Supply and fixing of Eucalyptus Ballies including labour and T&P required for proper completion of work (a) upto depth of 6.0 m in dry
M/S RAJ KUMAR AND SONS
M/s PARSADI LAL CONTRACTOR
M/s Ram Naresh contractor
M/S K P CONTRACTOR
M/s T.S. CONTRACTOR AND SUPPLIER
M/S. SUDHIR ENTERPRISES
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .