| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAdmitted-Finance | ₹1.7 Cr | L1 | Admitted-Finance |
| 2 | Rejected-Technical | - | - | Rejected-Technical Non Responsive |
| Sl No | Description | Qty | Unit | Thoughts Consultants Jaipur Pvt Ltd L1 |
|---|---|---|---|---|
| 1.10 | Preparation of Land Acquisition proposal including collection of 7/12 and 8/A documents marking alignment on village maps, area calculation, preparation of proposal, printing, binding, etc. complete and submission of 5 sets more ever Liaisoning and coordination with revenue authorities with compliance if any until finalisation of award including Joint measurement of the alignment. For existing alignment till award and project completion. | 60 | Km | 20,000 ₹12,00,000 Lowest |
| 1.20Providing Labour & Vehicles for joint measurements etc. complete. | ||||
| 1.30 | Vehicle rent with fuel and Driver till award and project completion. | 60 | No. | 4,000 ₹2,40,000 Lowest |
| 1.40 | Skilled labour for joint measurements till award and project completion. | 500 | No. | 800 ₹4,00,000 Lowest |
| 1.50 | Supervisor - 1 no. per day till award and project completion. | 90 | No. | 1,200 ₹1,08,000 Lowest |
| 1.60 | Demarcation of Road boundry (ROW) including fixing the boundry stones of standard size and shape including fixing in block of standard size of C.C. of 1:4:8 white washing at 30 M interval on both sides till award and project completion. | 120 | km | 40,000 ₹48,00,000 Lowest |
| 1.70 | Providing actual services for the preparation of record of rights, change of title in the name of MORTHNew Delhi including collection of notification under section 3 D as per NH Act 1956 (48 of 1956) Award copy, joint measurement plan, land schedule as per joint measurement, possession receipt, land revenue reduction order from competent authority for preparation of kami jast patrak fromTILR conducting meeting with TILR staff, site inspection if required, and preparing kami jast patrak, fromTILR and submission to competent authority along with joint measurement sheet, land schedule, according KJP which is prepared by TILRsubmitted to sub divisional magistrate for taking order revenue reduction and preparation of form no. 6 (order of form no. 6 ) submitted to Circle, Talathi to prepare the 7/12 extract in the name of acquiring authority
Rate as per SSR 22-23 Item no 1.58 till award and project completion and ROW in the name of Ro MORTH mutation tobe done. | 60 | km | 1,000 ₹60,000 Lowest |
| 1.80 | Scanning and digitizing the surveyed plane table on AutoCAD 14 & preparing computor disck Thane DSR 2015-16 page no 238 item no 5 till award and project completion. | 60 | km | 1,000 ₹60,000 Lowest |
| 1.90 | Preparing and carrying out video shooting of roads, bridges, buildings, other structures and programmes, including hiring of vehicles, equipment for video shooting, titling, lighting, mixing, lettering, editing, including cost of two colour cassettes (CD) of approved make and quality etc complete till award and project complete.
ii) Beyong 50 km As per Thane DSR 2015-16 page no 245 till award and project completion. | 10 | No | 11,100 ₹1,11,000 Lowest |
| 2.00 | Shooting of still photographs, outdoor and indoor of construction and other works of building, bridges, roads etc complete in District and outside District of any distances. As per Thane DSR 2015-16 page no 245 till award and project completion. | 200 | No | 1,000 ₹2,00,000 Lowest |
Tender Value
₹1.7 Cr
EMD Value
₹1.8 L
Closing Date
11 Nov 2025, 5:30 pmClosed
EE(NH)PWD Thane
EE(NH)PWD Thane
Balance Consultancy Services LA of Survey and Ancillary works for the work of Rehabilitation and upgradation of 2-4LPS from chainage km 148-505 to 208-135 in district palghar in the state of Maharashtra
2025_MoRTH_884245_1
NHD/Tender/1788/2025-26
Open Tender
Civil Works
Works
330 days
Thane
Please refer Tender documents.
7 documents required · 7 mandatory
₹5,000
Yes
Bharatkosh
₹1.8 L
2 Dec 2025
5 Nov 2025
12 Nov 2025
5 Nov 2025
11 Nov 2025
5 Nov 2025
Amount
Preparation of Land Acquisition proposal including collection of 7/12 and 8/A documents marking alignment on village maps, area calculation, preparation of proposal, printing, binding, etc. complete and submission of 5 sets more ever Liaisoning and coordination with revenue authorities with compliance if any until finalisation of award including Joint measurement of the alignment. For existing alignment till award and project completion.
Providing Labour & Vehicles for joint measurements etc. complete.
Vehicle rent with fuel and Driver till award and project completion.
Skilled labour for joint measurements till award and project completion.
Supervisor - 1 no. per day till award and project completion.
Demarcation of Road boundry (ROW) including fixing the boundry stones of standard size and shape including fixing in block of standard size of C.C. of 1:4:8 white washing at 30 M interval on both sides till award and project completion.
Providing actual services for the preparation of record of rights, change of title in the name of MORTHNew Delhi including collection of notification under section 3 D as per NH Act 1956 (48 of 1956) Award copy, joint measurement plan, land schedule as per joint measurement, possession receipt, land revenue reduction order from competent authority for preparation of kami jast patrak fromTILR conducting meeting with TILR staff, site inspection if required, and preparing kami jast patrak, fromTILR and submission to competent authority along with joint measurement sheet, land schedule, according KJP which is prepared by TILRsubmitted to sub divisional magistrate for taking order revenue reduction and preparation of form no. 6 (order of form no. 6 ) submitted to Circle, Talathi to prepare the 7/12 extract in the name of acquiring authority Rate as per SSR 22-23 Item no 1.58 till award and project completion and ROW in the name of Ro MORTH mutation tobe done.
Scanning and digitizing the surveyed plane table on AutoCAD 14 & preparing computor disck Thane DSR 2015-16 page no 238 item no 5 till award and project completion.
Preparing and carrying out video shooting of roads, bridges, buildings, other structures and programmes, including hiring of vehicles, equipment for video shooting, titling, lighting, mixing, lettering, editing, including cost of two colour cassettes (CD) of approved make and quality etc complete till award and project complete. ii) Beyong 50 km As per Thane DSR 2015-16 page no 245 till award and project completion.
Shooting of still photographs, outdoor and indoor of construction and other works of building, bridges, roads etc complete in District and outside District of any distances. As per Thane DSR 2015-16 page no 245 till award and project completion.
Ii) 4 x 6 inch -extra copy till award and project completion..
Providing and erecting 1.5 metre high wire fencing with seven rows of barbed wire supported on wooden post of specified size at 2.5 M C/C including excavating pits for foundation, fixing post
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.14 MB
BOQ_929403.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .