| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 LAdmitted-Fee/PreQual/Technical/Finance | ₹1.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.4 L+₹2,406.59 (1.78%)Admitted-Fee/PreQual/Technical/Finance | ₹1.4 L+₹2,406.59 (1.78%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | LAKSHMI NARAYANAN L1 | GOKULASREE CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for | 3.41 | cum | 200 ₹682 Lowest | 275.3 ₹938.77 |
| 2.00 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 0.95 | cum | 5,347.2 ₹5,079.84 Lowest | 5,347.2 ₹5,079.84 Lowest |
| 3.00 | Brick work in C.M 1:5 mix using country bricks incuding cost and conveyance and all labour charges etc. | 4.43 | cum | 6,065.68 ₹26,870.96 Lowest | 6,065.68 ₹26,870.96 Lowest |
| 4.00 | RCC 1:1.5:3 mix using 20mm metal including cost and conveyance and all labour charges etc. | 2.15 | cum | 9,072.86 ₹19,506.65 Lowest | 9,072.86 ₹19,506.65 Lowest |
| 5.00 | Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc. Column | 15.93 | sqm | 547.5 ₹8,721.68 Lowest | 547.5 ₹8,721.68 Lowest |
| 6.00 | Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc.roof slab | 3.68 | sqm | 1,095 ₹4,029.6 Lowest | 1,095 ₹4,029.6 Lowest |
| 7.00 | Supply and fabrication of steel including cost and conveyance and alla labour charges etc. complete. | 0.18 | MT | 91,873.22 ₹16,537.18 Lowest | 91,873.22 ₹16,537.18 Lowest |
| 8.00 | Plastering with cement mortar 1:5, 12mm thick including cost and conveyance and all labour charges etc. | 34.15 | sqm | 250 ₹8,537.5 Lowest | 290 ₹9,903.5 |
| 9.00 | Plastering with cement mortar 1:3, 10mm thick including cost and conveyance and all labour charges etc. | 0.59 | sqm | 324.94 ₹191.71 Lowest | 324.94 ₹191.71 Lowest |
| 10.00 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work. | 2.25 | sqm | 308.85 ₹694.91 Lowest | 308.85 ₹694.91 Lowest |
Tender Value
Refer Docs
EMD Value
₹1,400
Closing Date
29 Jul 2026, 3:00 pmClosed
The Panchayat officer,Arugundram panchayat
The Panchayat office,Arugundram panchayat
Construction of Mini CSC at Arungundram Panchayat
2026_RDTN_686160_1
39/01/2026
Open Tender
Civil Works
Works
90 days
The Panchayat office, Arugundram panchayat
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1,400
29 Jul 2026
16 Jul 2026
29 Jul 2026
16 Jul 2026
29 Jul 2026
16 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for | 3.41 | cum | - | - |
| 2 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 0.95 | cum | - | - |
| 3 | Brick work in C.M 1:5 mix using country bricks incuding cost and conveyance and all labour charges etc. | 4.43 | cum | - | - |
| 4 | RCC 1:1.5:3 mix using 20mm metal including cost and conveyance and all labour charges etc. | 2.15 | cum | - | - |
| 5 | Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc. Column | 15.93 | sqm | - | - |
| 6 | Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc.roof slab | 3.68 | sqm | - | - |
| 7 | Supply and fabrication of steel including cost and conveyance and alla labour charges etc. complete. | 0.18 | MT | - | - |
| 8 | Plastering with cement mortar 1:5, 12mm thick including cost and conveyance and all labour charges etc. | 34.15 | sqm | - | - |
| 9 | Plastering with cement mortar 1:3, 10mm thick including cost and conveyance and all labour charges etc. | 0.59 | sqm | - | - |
| 10 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work. | 2.25 | sqm | - | - |
stage.html
html • 0.02 MB
finance_824814.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.08 MB
BOQ_824814.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .