| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.7 CrAccepted-AOC | ₹9.7 Cr | L1 | Accepted-AOC Work Order Issued |
| 2 | L2₹10.0 CrRejected-AOC | ₹10.0 Cr | L2 | Rejected-AOC L2 |
| 3 | L3₹10.2 CrRejected-AOC | ₹10.2 Cr | L3 | Rejected-AOC L3 |
Tender Value
₹10.6 Cr
EMD Value
₹21.2 L
Closing Date
18 Oct 2023, 2:00 pmClosed
Spl CE, PWD(Bldg), H AND E, Assam Chandmari, Ghy-3
O/O The CE PWD NH Works Assam, Chandmari, Ghy-3
Transformation of Sonaram Higher Secondary School as a Centre of Excellence in the Capital Region of Assam at Kamrup (M) District of Assam
2023_PWBNH_32665_1
Tech-II/95/2023/6 Dated Guwahati the 8th Sept 2023
Open Tender
Civil Works - Building
545 days
BHARALUMUKH
Please refer Tender documents.
5 documents required · 5 mandatory
₹20,000
₹21.2 L
Yes
27 Feb 2024
26 Sept 2023
20 Oct 2023
26 Sept 2023
18 Oct 2023
26 Sept 2023
Amount
Credit for Demolition of building structures etc.complete and taking away all fetched material out of campus within 30 days after completing demolition part except the C&D waste kept for recycling and used the recycle product for non structural work such as in foot path, manhole, lean concrete, filling under plinth, re-filling of foundation etc. or as approved by Engineer-in-charge complete in all respect. The serviciable material received from dismantling/demolishing to be kept with executing agency and take away from the site as per direction of engineer-in-charge. Note : This amount to be paid by agency to the department. Quote the lump sum amount (in minus)
Planning, Designing, and Construction on EPC Basis RCC framed structure building HIGHER SECONDARY SCHOOL (G+1) ,with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NBC-2016 norms & IS Codes and guidelines complete in all respect. Note :- Plinth Area shall be measured for the actual constructed.
Planning, Designing, and Construction on EPC Basis RCC framed structure building KITCHEN CUM STORE_MID DAY MEAL (G) ,with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NBC-2016 norms & IS Codes and guidelines complete in all respect. Note :- Plinth Area shall be measured for the actual constructed.
Planning, Designing and construction of Civil External development works Levelling, Cement concrete pavement with vaccum dewatered concrete, Foothpath and pathway, External water supply, Garden irrigation, External Sewerage, External storm water drainage work, Rain water harvesting, Borewell, Water supply pumps, Septic tank , Horticulture & Landscape and Boundary Wall approval of the same by the Engineer- in-Charge
Planning, Designing and Construction on EPC Basis of INFRASTRUCTURE & EXTERNAL DEVELOPMENT – Electrical Works such as Electrical sub station ,DG set , Cables, Cable tray's, Race ways and Earthing system with support services & allied facilities by incorporating stipulated specifications, all services including handing over complete as per scope of work and directions of Engineer In charge.
Supplying, Installation and commissioning of Furniture work including handing over complete as per scope of work and directions of Engineer In charge
Low Side Sanitary Fixtures, Fittings, Electrical Fixtures, Fittings, DB’s, Panel etc and any other Capital Equipments and accessories which requires maintenance ESS, DG SETS, TRANSFORMER and as per CPWD Maintenance Manual 2019: Comprehensive maintenance ESS, DG SETS, Transformer units after three year warranty charges/maintenance. The rates shall be inclusive of all spare, accessories, consumbles, manpower, tools and tackles, replacement of parts, (except fuel , power and water) including routine servicing and maintenance of equipment etc complete in all respect as per direction of Engineer in charge. Maintenance (Limited to New Infrastructre Created) For 1st year (Concurrently with DLP of 12 Months)
For 2nd year (After One Year Of DLP)
For 3rd year (After Two Year Of DLP)
For 4th year (After Two Year Of DLP)
Puberun Real Estate Pvt. Ltd.
Art E Mide Construction Private Limited
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid