| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.4 LAccepted-Finance 11 17A 4 MADILINE OPPOSITE SALEM CAMP PO METTUR DAM 636 456 | METTUR DAM | SALEM | TAMIL NADU | 636456 | 1 | Accepted-Finance satisfied | |
| 2 | 2₹5.8 L+₹1.4 L (32.0%)Accepted-Finance D NO 4 6 92 PERIYAR NAGAR THANGAMAPURIPATTINAM METTUR DAM 636402 | METTUR DAM | SALEM | TAMIL NADU | 636402 | 2 | Accepted-Finance satisfied | |
| 3 | 3₹6.0 L+₹1.7 L (37.9%)Accepted-Finance 76 58 A1 KAMARAJ NAGAR SALEM CAMP METTUR DAM 636 452 | METTUR DAM | SALEM | TAMIL NADU | 636452 | 3 | Accepted-Finance satisfied |
| Sl No | Description | Qty | Unit | Jose Enterprises L3 | ARR AND CO L2 | LENIN ENGINEERING WORKS L1 |
|---|---|---|---|---|---|---|
| 1.00 | Charges for rectification of the primary air Damper and its flange, hot Primary air duct man hole doors and the eroded portion of the duct area including charges for consumables and T&Ps | 2 | Nos. | 52,840 ₹1,05,680 | 43,000 ₹86,000 | 38,469 ₹76,938 Lowest |
| 2.00 | Charges for cleaning the accumulated ash in side of the Hot primary air ducts Hot secondary Air ducts of “A & B” sides including charges for consumables and T&Ps | 4 | Nos. | 74,230 ₹2,96,920 | 57,000 ₹2,28,000 | 53,775 ₹2,15,100 Lowest |
| 3.00 | Removal of accumulated ash at interconnection and around the secondary air duct in SCAPH area including charges for consumables and T&Ps | 1 | No | 28,950 ₹28,950 | 23,100 ₹23,100 | 21,491 ₹21,491 Lowest |
| 4.00 | Charges for cutting and removal of heavily eroded Hot primary air & Hot Secondary air duct plates, transporting & devoluting scraps to Central Stores/M.T.P.S.-I including charges for consumables and T&Ps | 15 | M2 | 1,200 ₹18,000 | 1,600 ₹24,000 | 957 ₹14,355 Lowest |
| 5.00 | Charges for transporting of 6mm M.S./Chequered plates from Central Stores/ MTPS-I. to Boiler area, cutting into required size, leading, lifting, positioning on the eroded portions above 1.5 metres side wall portions of the Hot primary air & Hot Secondary air ducts and welding the same including charges for consumables and T&Ps | 15 | M2 | 2,200 ₹33,000 | 3,000 ₹45,000 | 1,625 ₹24,375 Lowest |
| 6.00 | Labour charges for welding eroded initial welding joints in the flue gas duct below 2 metre including charges for consumables and T&Ps | 200 | Mtr | 170 ₹34,000 | 410 ₹82,000 | 121 ₹24,200 Lowest |
| 7.00 | Providing sampling points/temperature measuring points at various location of hot air ducts including charges for consumables and T&Ps | 6 | Nos. | 6,190 ₹37,140 | 7,500 ₹45,000 | 4,627 ₹27,762 Lowest |
| 8.00 | Cutting Gas | 3 | Sets | 3,700 ₹11,100 | 3,650 ₹10,950 | 2,500 ₹7,500 Lowest |
| 9.00 | Welding Rod | 85 | Kgs | 450 ₹38,250 | 390 ₹33,150 | 300 ₹25,500 Lowest |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
15 Sept 2026, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I BM Unit III Annual maintenance 2026 27 Hot primary air Ducts and hot Secondary air ducts of A and B sides Cleaning the accumulated ash arresting the air leakage by rectification of the damper and allied works
2026_EB_702184_1
CE / MTPS-I / SE / M-I / BM /OT. 74 / 2026-27
Open Tender
Power/Energy Projects/Products
Works
20 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specification
4 documents required · 4 mandatory
₹0
₹5,000
Yes
16 Sept 2026
9 Sept 2026
16 Sept 2026
9 Sept 2026
15 Sept 2026
9 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Charges for rectification of the primary air Damper and its flange, hot Primary air duct man hole doors and the eroded portion of the duct area including charges for consumables and T&Ps | 2 | Nos. | - | - |
| 2 | Charges for cleaning the accumulated ash in side of the Hot primary air ducts Hot secondary Air ducts of “A & B” sides including charges for consumables and T&Ps | 4 | Nos. | - | - |
| 3 | Removal of accumulated ash at interconnection and around the secondary air duct in SCAPH area including charges for consumables and T&Ps | 1 | No | - | - |
| 4 | Charges for cutting and removal of heavily eroded Hot primary air & Hot Secondary air duct plates, transporting & devoluting scraps to Central Stores/M.T.P.S.-I including charges for consumables and T&Ps | 15 | M2 | - | - |
| 5 | Charges for transporting of 6mm M.S./Chequered plates from Central Stores/ MTPS-I. to Boiler area, cutting into required size, leading, lifting, positioning on the eroded portions above 1.5 metres side wall portions of the Hot primary air & Hot Secondary air ducts and welding the same including charges for consumables and T&Ps | 15 | M2 | - | - |
| 6 | Labour charges for welding eroded initial welding joints in the flue gas duct below 2 metre including charges for consumables and T&Ps | 200 | Mtr | - | - |
| 7 | Providing sampling points/temperature measuring points at various location of hot air ducts including charges for consumables and T&Ps | 6 | Nos. | - | - |
| 8 | Cutting Gas | 3 | Sets | - | - |
| 9 | Welding Rod | 85 | Kgs | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
BOQ_844433.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .