| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹25.1 LAccepted-AOC | L-1 | Accepted-AOC He is the L-1 bidder | |
| 2 | Rejected-Technical | - | Rejected-Technical He is not the L-1 bidder | |
| 3 | Rejected-Technical HARDI NO 111 GRAM PANCHAYAT HARDI TEHSIL SOHAGPUR DISTT SHAHDOL M P 484110 | SHAHDOL | MADHYA PRADESH | 484110 | - | Rejected-Technical He is not the L-1 bidder | |
| 4 | Rejected-Technical HOUSE NO 231 WARD NO 04 DHANPURI NO 3 DISTT SHAHDOL M P 484114 | SHAHDOL | MADHYA PRADESH | 484114 | - | Rejected-Technical He is not the L-1 bidder | |
| 5 | Rejected-Technical | - | Rejected-Technical He is not the L-1 bidder |
Tender Value
₹45.7 L
EMD Value
₹57,200
Closing Date
8 Mar 2023, 5:00 pmClosed
Staff Officer Civil SECL Sohagpur Area
Office of Staff Officer Civil SECL Sohagpur Area, GM Office, Dhanpuri, Distt. Shahdol , M.P. - 484114 Name and mobile number of contact person Shri Pranay Gour , 7587391029
Repair of wing wall of RCC Bridge on approach road of Khairaha UG mine at Rajendra Sub Area
2023_SECL_272690_1
SECL/SGP/SO(C)/ e-TENDER/2022-23/98 Dt. 24.02.2023
Open Tender
Civil Works - Others
Item Rate
120 days
Sohagpur Area
As per NIT
3 documents required · 3 mandatory
₹57,200
21 Mar 2023
25 Feb 2023
10 Mar 2023
25 Feb 2023
8 Mar 2023
26 Feb 2023
25 Feb 2023 - 4 Mar 2023
Amount
Item Description/ Heading
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kinds of soil
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in charge. Ordinary rock
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size) aggregate 20 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete.
Centering and shuttering including strutting, propping etc. and removal of form for : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Cold twisted bars.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
Supplying and stacking of hard stone (for stone pitching) 22.5 cm thick at site.
Dry stone pitching 22.5 cm thick laid in courses and required profile with hammer dressed stones having no side less than 15 cm, with minimum depth of 20 cm including preparing the bedding surface etc. all complete. (Payment for Stone to be made separately).
Total impact of GST for the purpose of CTC
MAA BHUVNESHWARI CONSTRUCTION
SHREE SAI INFRA
MAA BHAGWATI CONSTRUCTION
shreyash construction
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_282160.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .