Director, CSIR-CMERI
The Director, CSIR-CMERI, Durgapur 713209, West Bengal
Making wall with MSW bricks and MS steel gate in the open space 1 and 2 beside canteen and auditorium at CSIR-CMERI Institute campus, Durgapur-09
2021_CSIR_82149_1
9/19/2021-22/CI/ESD/Maint
Open Tender
Civil Works
Item Rate
30 days
CSIR-CMERI INSTITUTE, DURGAPUR
PAN, GST, Trade License and Experience Certificate as per NIT requirement
5 documents required · 5 mandatory
₹500
Yes
Director, CSIR-CMERI
₹7,458
Yes
10 Aug 2021
16 Jul 2021
30 Jul 2021
16 Jul 2021
29 Jul 2021
16 Jul 2021
Amount
Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge: All kinds of soil
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size).
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size).
Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.:Thermo-Mechanically Treated bars
Brick work by using the bricks manufactured by MSW, CSIR-CMERI is to be carried from MSW, CMERI colony to the site and brick work with the same brick in 1:6 ratio cement morter in superstructure above plinth level up to floor V level in all shapes and sizes:
Half-Brick work by using the bricks manufactured by MSW, CSIR-CMERI is to be carried from MSW, CMERI colony to the site and brick work with the same brick in 1:4 ratio cement morter in foundation and plinth.
12 mm cement plaster finished with a floating coat of neat cement of mix : 1:4 (1 cement: 4 fine sand)
15mm cement plaster on rough side of mix 1:4 (1cement: 4coarse sand)
Finishing walls with Acrylic Smooth exterior paint of required shade on new work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/ 10 sqm)
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade two or more coat.
Structural steel work in single section fixed with or without connecting plate including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
ASSOCIATED ENTERPRISES
MITU ENTERPRISE
UNIVERSAL ENGINEERING CONSTRUCTION
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .