Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.3 CrAccepted-AOC 00 00 NAPASAR ROAD NENO KA BASS BIKANER RAJASTHAN BIKANER RAJASTHAN 334022 UDYAM RJ 08 0001676 | BIKANER | RAJASTHAN | 334022 | L1 | Accepted-AOC Lowest and overall reasonable bid | |
| 2 | L2₹22.9 Cr+₹57.3 L (2.57%)Rejected-Finance | L2 | Rejected-Finance Other than L1 | |
| 3 | L3₹24.0 Cr+₹1.7 Cr (7.52%)Rejected-Finance STREET NO 3 BIBI WALA ROAD BATHINDA 151001 | BATHINDA | BATHINDA | PUNJAB | 151001 | L3 | Rejected-Finance Other than L1 | |
| 4 | L4₹24.1 Cr+₹1.7 Cr (7.75%)Rejected-Finance | L4 | Rejected-Finance Other than L1 | |
| 5 | L5₹25.5 Cr+₹3.2 Cr (14.2%)Rejected-Finance 193 1 CIVIL LINES BAREILLY 243001 | BAREILLY | UTTAR PRADESH | 243001 | L5 | Rejected-Finance Other than L1 |
Tender Value
₹22.2 Cr
EMD Value
₹14.3 L
Closing Date
18 Mar 2024, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CHIEF ENGINEER JAIPUR ZONE JAIPUR
HEADQUARTER CHIEF ENGINEER JAIPUR ZONE JAIPUR
PROVN OF MD ACCN FOR OFFICERS, JCOS AND ORS AT BHARATPUR MIL STATION
2024_MES_635549_2
80881/E8
Open Tender
Construction Works
Lump-sum
730 days
GE BHARATPUR
Please refer Tender documents.
7 documents required · 7 mandatory
₹3,000
GE BHARATPUR
₹14.3 L
Yes
24 Jun 2024
20 Feb 2024
20 Mar 2024
20 Feb 2024
18 Mar 2024
5 Mar 2024
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Lump sum price worked out by the contractor for "BUILDING WORKS" as listed in Schedule ‘A’ Part-I representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES | 1 | LUMP SUM | 17,00,59,235 | ₹17,00,59,235 |
| 2 | Lump sum price worked out by the contractor for "INTERNAL WATER SUPPLY " as listed in Schedule ‘A’ Part-II representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES | 1 | LUMP SUM | 13,81,601.84 | ₹13,81,601.84 |
| 3 | Lump sum price worked out by the contractor for "INTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-III representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES | 1 | LUMP SUM | 72,71,725.19 | ₹72,71,725.19 |
| 4 | Lump sum price worked out by the contractor for "ROAD, PATH & CULVERT" as listed in Schedule ‘A’ Part-IV representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES | 1 | LUMP SUM | 1,21,28,727.2 | ₹1,21,28,727.2 |
| 5 | Lump sum price worked out by the contractor for "SEWAGE DISPOSAL " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES | 1 | LUMP SUM | 26,90,342.42 | ₹26,90,342.42 |
| 6 | Lump sum price worked out by the contractor for "AREA DRAINAGE" as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES | 1 | LUMP SUM | 86,55,716.4 | ₹86,55,716.4 |
| 7 | Lump sum price worked out by the contractor for "REFUSE BIN etc." as listed in Schedule ‘A’ Part-VII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES | 1 | LUMP SUM | 8,55,671.75 | ₹8,55,671.75 |
| 8 | Lump sum price worked out by the contractor for "EXTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-VIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES | 1 | LUMP SUM | 8,00,826.1 | ₹8,00,826.1 |
| 9 | Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION " as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES | 1 | LUMP SUM | 50,25,066.85 | ₹50,25,066.85 |
| 10 | Lump sum price worked out by the contractor for "LIGHTENING PROTECTION etc." as listed in Schedule ‘A’ Part-X representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES | 1 | LUMP SUM | 66,292.8 | ₹66,292.8 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ_720172.xls
BOQ Document • 0.32 MB
140017911.pdf
Tender Document • 0.44 MB
Retender80881_merged.pdf
Tender Document • 7.91 MB
Arch_Main_Drg_80881_07_to_31.pdf
Tender Document • 17.41 MB
Arch_Main_Drg_80881_32_to_45.pdf
Tender Document • 8.48 MB
Struct_Main_Drg_80881_46_to_62.pdf
Tender Document • 7.17 MB
TD_Drg_80881_63_to_87.pdf
Tender Document • 28.95 MB
TD_Drg_80881_88_to_107.pdf
Tender Document • 31.47 MB
TD_Drg_80881_108_to_124.pdf
Tender Document • 38.27 MB
140017913.html
Tender Document • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .