Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹2.8 L+₹10,722.90 (4.01%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹2.8 L+₹16,720.05 (6.25%)Rejected-Finance VIDYUT BHAWAN HPSEBL SHIMLA 171004 | SHIMLA | HIMACHAL PRADESH | 171004 | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | VINOD KUMAR CONSTRUCTION CONTRACTORS L3 | Sonam Zangpo L1 | ARUN KUMAR THAMAS L2 |
|---|---|---|---|---|---|---|
| 1.00 | Cutting in earth work and disposal of excavated earth up to alead of 20 metres commplete as per direction and to the entire satisfaction of Engineer-in-Charge. | 27.3 | Cum. | 340 ₹9,282 | 310 ₹8,463 Lowest | 320 ₹8,736 |
| 2.00 | Excavation in foundations, trenches etc. in earth work, lift upto 1.50 metres stacking the excavated soil not more than 3 metres clear from the edge of excavation and then returning the stacked soil in 15cm layers, when required in to plinths sides of foundations etc., consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed within a lead of 20m in (100% pick work) | 3.99 | Cum. | 485 ₹1,935.15 | 440 ₹1,755.6 Lowest | 475 ₹1,895.25 |
| 3.00Providing and laying in position reinforced cement concrete 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) excluding the cost of centering and shuttering as per the direction of Engineer-in-charge. | ||||||
| 3.01 | All work up to plinth level. | 3.71 | Cum. | 12,300 ₹45,633 | 12,000 ₹44,520 Lowest | 12,200 ₹45,262 |
| 3.02 | walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level. | 6.83 | Cum. | 14,400 ₹98,352 | 14,000 ₹95,620 Lowest | 14,300 ₹97,669 |
| 4.00 | Steel reinforcement (Tor Steel) for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level as per the direction and to the entire satisfaction of Engineer-in-charge. | 632.4 | Kg | 140 ₹88,536 | 125 ₹79,050 Lowest | 135 ₹85,374 |
| 5.00 | Centering and shuttering including strutting, propping etc. and removal of form for all heights : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. complete as per the direction and to the entire satisfaction of Engineer-in-charge. | 47.81 | Sqmt. | 850 ₹40,638.5 | 800 ₹38,248 Lowest | 825 ₹39,443.25 |
Tender Value
₹2.6 L
EMD Value
₹5,160
Closing Date
11 Sept 2025, 5:00 pmClosed
Executive Engineer
Executive Engineer Jal Shakti Division Keylong
SH Construction of retaining wall to protect the storage tank
2025_HPIPH_113528_1
7217-7267 dated 01.09.2025
Open Tender
Civil Works - Water Works
Item Rate
31 days
Keylong
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
EE Keylong
₹5,160
14 Nov 2025
2 Sept 2025
12 Sept 2025
2 Sept 2025
11 Sept 2025
2 Sept 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .