Loading…
Loading…
Tender Value
₹3.4 Cr
EMD Value
₹6.9 L
Closing Date
6 Jul 2026, 3:00 pm7d left
Similar tender results from the same govt authority in the past 3 years.
Hyderabad Division: Provision of stabling lines at Lalaguda halt station - Electrical TRD arrangements
17_2026-27_SrDEE_TRD_HYB
17_2026-27_SrDEE_TRD_HYB
Open
12 Months
Hyderabad, Telangana
₹0
₹6.9 L
13 Jun 2026
13 Jun 2026
22 Jun 2026
31(a) Transfer of Overhead Equipment from one Mast or Support to another, including removal of Cantilever Assembly from old Mast or Support
31(k)(i) Dismantlement of OHE Mast or structure by cutting
31(t)(ix) Re-adjustment of OHE Spans, including droppers
32/3(a) Erection of Traction Masts, Feeder Masts, AT Mast and Main Masts of Switching Stations under power block
32/3(b) Erection of TTCs, Portals and Small Parts Steel (SPS) under power block
32/3(e) Erection of Guy Rod Assembly under power block
32/4(a)(i) Erection of Single Cantilever Assembly for Conventional OHE under power block
32/4(a)(ii) Erection of Two Cantilever Assemblies on same structure or support for Conventional OHE under power block
32/4(a)(iii) Erection of Three Cantilever Assemblies on same structure or support for Conventional OHE under power block Per Track
32/6(a) Erection of Regulated Conventional OHE under power block
32/8(a)(v) Erection of Regulating Equipment With Counter-Weight assembly for Conventional OHE under power block
32/8(b)(ii) Erection of Materials for Termination of Conventional OHE under power block
32/9(a) Erection of Anti-creep with galvanized steel wire for Conventional OHE under power block
32/10(a) Extra on item 6(a) or 6(c) for Erection of additional fittings required at a turnout, cross-over or over-lap under power block
32/11(a)(i) Erection of 25 kV Solid Core Cut-in Insulator under power block.
32/11(b) Erection of 25 kV Post Insulator under power block
32/12(a) Erection of 25 kV Section Insulator Assembly for Conventional OHE under power block
32/13(a) Erection of 25 kV Single Pole Isolator without earth contact assembly under power block
32/13(c) Erection of Earth Contact Assembly for an Isolator under power block
32/15(a) Erection of 50 sq.mm Copper Jumper (C-Jumper, F-Jumper, Anti-Theft Jumper) (excluding copper jumper supply) under power block
32/15(b) Erection of 160 or 105 sq.mm Copper Jumper (Isolator Jumper, G-Jumper) (excluding copper jumper supply) under power block
32/26(a)(ii) Erection of 18 mm Copper Bus Bar under power block
32/26(c)(i) Erection of Solid Copper Busbar Connector - 18 mm Bus Terminal (6310-1) under power block
32/26(c)(ii) Erection of Solid Copper Busbar Connector - 18 mm Bus Splice (6320) under power block
32/31(a) Transfer of Overhead Equipment from one Mast or Support to another, including removal of Cantilever Assembly from old Mast or Support under power block
32/31(b) Provision of additional bracket assembly/assemblies on a mast or support under power block
32/31(k)(i) Dismantlement of OHE Mast or structure by cutting under power block
32/31(t)(ix) Re-adjustment of OHE Spans, including droppers under power block
40(a) Supply and Erection of Number Plate (Enamel Type) Above/
2(a)(i)Concrete for foundations and plinth in Hard Soil
2(a)(ii) Concrete for foundations and plinth in Rocky Soil
2(b)Concrete for foundations and plinth in other than Hard and Rock Soil Above/
Item Breakup - 1-A1 OHE/PSI items
Labour/Erection Total 45045.00 Item- 3 3(b)Erection of TTCs, Portals and Small Parts Steel (SPS) S No. Item Description of Item Unit Qty Rate Amount No
Labour/Erection Total 1389297.00 Item- 4 3(e) Supply and Erection of Guy Rod Assembly S No. Item Description of Item Unit Qty Rate Amount No
Supply/Purchase
Labour/Erection Total 209020.00 Item- 5 4(a)(i) Supply (without Insulators) and Erection of Single Cantilever Assembly for Conventional OHE S No. Item Description of Item Unit Qty Rate Amount No
Supply/Purchase
Labour/Erection Total 2323548.00 Item- 6 4(a)(ii)Erection of Two Cantilever Assemblies on same structure or support for Conventional OHE S No. Item Description of Item Unit Qty Rate Amount No
Labour/Erection Total 48570.00 Item- 7 4(a)(iii)Erection of Three Cantilever Assemblies on same structure or support for Conventional OHE S No. Item Description of Item Unit Qty Rate Amount No
Labour/Erection Total 7436.00 Item- 8 6(a) Supply and Erection of Regulated Conventional OHE S No. Item Description of Item Unit Qty Rate Amount No
Per Supply/Purchase Track KM
Per Labour/Erection Track KM Total 370428.30 8(a)(v) Supply and Erection of Regulating Equipment With Counter-Weight assembly for Item- 9 Conventional OHE S No. Item Description of Item Unit Qty Rate Amount No
Supply/purchase
Labour/Erection Total 894996.00 8(a)(xii) Marking/Painting of temperature and 'Y' - Measurement on OHE Structures at BWA Item- 10 locations. S No. Item Description of Item Unit Qty Rate Amount No ECS-MLY-ELECTRICAL/SOUTH CENTRAL RLY
Erection/Labour Total 2220.00 Item- 11 8(b)(ii) Supply (without Insulator) and Erection of Materials for Termination of Conventional OHE S No. Item Description of Item Unit Qty Rate Amount No
purchase/supply
Labour/Erection Total 111852.00 9(a) Supply (without Insulators) and Erection of Anti-creep with galvanized steel wire for Item- 12 Conventional OHE. S No. Item Description of Item Unit Qty Rate Amount No
Purchase/Supply
Labour/Erection Total 101488.00 10(a) Extra on item 6(a) or 6(c) for Supply and Erection of additional fittings required at a turnout, Item- 13 cross-over or over-lap S No. Item Description of Item Unit Qty Rate Amount No
Supply/Purchase
Labour/ Erection Total 195524.00 Item- 14 11(a)(i) Supply (without Insulator) and Erection of 25 kV Solid Core Cut-in Insulator. S No. Item Description of Item Unit Qty Rate Amount No
Supply/Purchase
Labour/ Erection Total 41120.00 Item- 15 11(b) Supply (without Insulator) and Erection of 25 kV Post Insulator S No. Item Description of Item Unit Qty Rate Amount No
Supply/Purchase
Labour/ Erection Total 28464.00 12(a) Supply (without Insulators) and Erection of 25 kV Section Insulator Assembly for Conventional Item- 16 OHE S No. Item Description of Item Unit Qty Rate Amount No
Supply/Purchase
Labour/ Erection Total 385329.00 13(a) Supply (without Insulators) and Erection of 25 kV Single Pole Isolator without earth contact Item- 17 assembly S No. Item Description of Item Unit Qty Rate Amount No
Supply/Purchase
Labour/ Erection Total 301133.00 Item- 18 13(c) Supply and Erection of Earth Contact Assembly for an Isolator S No. Item Description of Item Unit Qty Rate Amount No
Purchase/Supply
Labour/Erection Total 55076.00 15(a) Supply and Erection of 50 sq.mm Copper Jumper (C-Jumper, F-Jumper, Anti-Theft Jumper) Item- 19 (excluding copper jumper supply) S No. Item Description of Item Unit Qty Rate Amount No
Supply/Purchase ECS-MLY-ELECTRICAL/SOUTH CENTRAL RLY
Labour/ Erection Total 13344.00 15(b) Supply and Erection of 160 or 105 sq.mm Copper Jumper (Isolator Jumper, G-Jumper) Item- 20 (excluding copper jumper supply) S No. Item Description of Item Unit Qty Rate Amount No
Purchase/Supply
Labour/Erection Total 67344.00 Item- 21 16(a) Supply and Erection of Structure Bond S No. Item Description of Item Unit Qty Rate Amount No
Supply/Purchase
Labour/ Erection Total 125070.00 Item- 22 16(b) Supply and Erection of Longitudinal Bond S No. Item Description of Item Unit Qty Rate Amount No
Labour/ Erection Total 56192.00 Item- 23 16(c) Supply and Erection of Transverse & Special Bond S No. Item Description of Item Unit Qty Rate Amount No
Supply/Purchase
Labour/ Erection Total 122592.00 Item- 24 16(aa)Drilling of Holes on Rails S No. Item Description of Item Unit Qty Rate Amount No
Labour/ Erection Total 46010.00 Item- 25 17(a) Supply and Erection of Single Earth Electrode at COP/FOB/PTFE/Steel Girder etc. S No. Item Description of Item Unit Qty Rate Amount No
Supply/Purchase
Labour/ Erection Total 38864.00 Item- 26 26(a)(ii) Supply and Erection of 18 mm Copper Bus Bar S No. Item Description of Item Unit Qty Rate Amount No
Purchase/Supply
Labour/Erection Total 57504.00 Item- 27 27(c)(i) Supply and Erection of Solid Copper Busbar Connector - 18 mm Bus Terminal (6310-1) S No. Item Description of Item Unit Qty Rate Amount No
Purchase/Supply
Labour/Erection Total 33228.00 Item- 28 26(c)(ii) Supply and Erection of Solid Copper Busbar Connector - 18 mm Bus Splice (6320) S No. Item Description of Item Unit Qty Rate Amount No
Purchase/Supply
Labour/Erection Total 40964.00 31(a) Transfer of Overhead Equipment from one Mast or Support to another, including removal of Item- 29 Cantilever Assembly from old Mast or Support ECS-MLY-ELECTRICAL/SOUTH CENTRAL RLY S No. Item Description of Item Unit Qty Rate Amount No
Labour/ Erection Total 7480.00 Item- 31 31(k)(i) Dismantlement of OHE Mast or structure by cutting S No. Item Description of Item Unit Qty Rate Amount No
Labour/ Erection Total 24496.00 Item- 59 40(a) Supply and Erection of Number Plate (Enamel Type) S No. Item Description of Item Unit Qty Rate Amount No
Purchase/Supply
Labour/Erection Total 61600.00
Item Breakup - 3-B1 Steel items
Supply/Purchase Total 1718262.00 Item- 2 3(bs)Supply of Fabricated and Galvanized structures such as TTCs, Portals, other than masts S No. Item Description of Item Unit Qty Rate Amount No
Supply/Purchase Total 9205160.00 3(cs)Supply of Fabricated and Galvanized Small Parts Steel (SPS) other than Masts, TTCs and Item- 3 Portals. S No. Item Description of Item Unit Qty Rate Amount No
Supply/Purchase Total 6332008.00
Item Breakup - 4- B2 - Copper items
Supply/Purchase Total 1016250.00
Item Breakup - 5-B3 - Insulator items
Supply/Purchase Total 1138410.00 8(bx)Supply of Porcelain 9-ton Insulator for item no. 8(b)(ii)/8(b)(iii)/8(b)(vi)/8(b) Item- 2 (ix)/9(a)/9(b)/9(c)/9(d)/11(a)(i)/11(a)(ii) S No. Item Description of Item Unit Qty Rate Amount No
Supply/Purchase Total 149220.00 Item- 3 11(bx)Supply of Post Insulator for Item no. 11(b) S No. Item Description of Item Unit Qty Rate Amount No
Supply/Purchase Total 133392.00 Item- 4 12(ax)Supply of Sectioning and 9-ton Insulators for Item no. 12(a) S No. Item Description of Item Unit Qty Rate Amount No ECS-MLY-ELECTRICAL/SOUTH CENTRAL RLY
Supply/Purchase Total 75026.00 Item- 5 13(ax)Supply of Post and Operating Rod Insulators for Item no. 13(a) S No. Item Description of Item Unit Qty Rate Amount No
Supply/Purchase Total 99652.00
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCC_April-2022.pdf
ATTACHMENT
GCCACS01to10merged.pdf
ATTACHMENT
LatestOHESimilarNatureofWork040925.pdf
ATTACHMENT
GCCACS11.pdf
ATTACHMENT
T17TenderBookletLGDStablingLines.pdf
ATTACHMENT
T17ExplanatoryNotesLGDStablingLines.pdf
ATTACHMENT
Download all tender documents and submit your bid