Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAdmitted-Finance | ₹3.0 L | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | GURCHARAN SINGH L1 |
|---|---|---|---|---|
| 1.00 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50m outside the periphery of the area cleared. | 20 | Sqm | 20 ₹400 Lowest |
| 2.00Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | ||||
| 2.10 | 1:2:4 (1 cement : 2 coarse sand(zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.5 | Cum | 8,500 ₹4,250 Lowest |
| 3.00 | 1:5:10 (1 cement : 5 fine sand derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) | 0.5 | Cum | 6,000 ₹3,000 Lowest |
| 3.10Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : | ||||
| 4.00 | 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III)derived from natural sources : 3 graded stone aggregate 20 mm nominal sizederived from natural sources) | 0.5 | Cum | 10,500 ₹5,250 Lowest |
| 4.10Centering and shuttering including strutting, propping etc. and removal of form for : | ||||
| 5.00 | Columns, Pillars, Piers, Abutments, Posts and Struts | 2 | Sqm | 800 ₹1,600 Lowest |
| 5.10Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. | ||||
| 6.00 | Thermo-Mechanically Treated bars of grade Fe-500D or more. | 10 | Kg | 105 ₹1,050 Lowest |
Tender Value
₹2.8 L
EMD Value
₹5,611
Closing Date
4 Jul 2026, 6:00 pmClosed
EE CIVIL BSNL CIVIL DISION CHD
Office of EE Civil BSNL Civil Division, TE bldg Sector-34A Chandigarh
Day to Day maintenance of Staff Quarters in Patiala local area for the year 2026-27
2026_BSNL_282085_1
22/EE/BSNL/BCD/CHD/2026-27
Open Tender
Civil Works - Others
Item Rate
365 days
Patiala Local area
Pls. refer NIT Terms and Conditions
13 documents required · 13 mandatory
₹590
Accounts Officer Cash O/o GMTD BSNL Patiala
₹5,611
10 Jul 2026
25 Jun 2026
10 Jul 2026
25 Jun 2026
4 Jul 2026
25 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50m outside the periphery of the area cleared. | 20 | Sqm | - | - |
| 2Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | |||||
| 2.1 | 1:2:4 (1 cement : 2 coarse sand(zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.5 | Cum | - | - |
| 3 | 1:5:10 (1 cement : 5 fine sand derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) | 0.5 | Cum | - | - |
| 3.1 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : | - | - | - | - |
| 4 | 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III)derived from natural sources : 3 graded stone aggregate 20 mm nominal sizederived from natural sources) | 0.5 | Cum | - | - |
| 4.1 | Centering and shuttering including strutting, propping etc. and removal of form for : | - | - | - | - |
| 5 | Columns, Pillars, Piers, Abutments, Posts and Struts | 2 | Sqm | - | - |
| 5.1 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. | - | - | - | - |
| 6 | Thermo-Mechanically Treated bars of grade Fe-500D or more. | 10 | Kg | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.69 MB
BOQ_329114.xls
BOQ • 0.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .