Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC CHENNAI CIRCLE CHENNAI 6 | ₹1.5 Cr | L1 | Accepted-AOC Lowest Amount Quoted BY M/s. KVR and CO and called for negotiation amount Rs. 15320953.83 |
| 2 | L2₹1.6 Cr+₹4.8 L (3.15%)Rejected-Finance 3 24 SOUTH STREET ORAKKADU VILLAGE ORAKKADU POST ORAKKADU TAMIL NADU 607103 | ORAKKADU | CUDDALORE | TAMIL NADU | 607103 | ₹1.6 Cr+₹4.8 L (3.15%) | L2 | Rejected-Finance 3.71 percentage above ER not accepted |
| 3 | Not Admitted-Fee/PreQual/Technical 566 PONNIAMMAN KOIL STREET THIRUVENKATAPURAM PONNERI 601204 | PONNERI | TIRUVALLUR | TAMIL NADU | 601204 | - | - | Not Admitted-Fee/PreQual/Technical EMD Not Furnished |
| 4 | Not Admitted-Fee/PreQual/Technical 16 PERUNAL KOIL STREET VEMBEDU VILLAGE AMBUR POST PIN 635701 THENI TAMIL NADU | TIRUPATHUR | TAMIL NADU | 635701 | - | - | Not Admitted-Fee/PreQual/Technical EMD Not Furnished |
Tender Value
₹1.6 Cr
EMD Value
₹1.6 L
Closing Date
19 May 2023, 3:00 pmClosed
Additional Collector(D)/Project Officer
Additional Collector(D)/Project Officer DRDA Tiruvallur
STRENGTHENING THE BT ROAD FROM R.K.PET-PALLIPET ROAD TO PERUMANALLUR AT PERUMANALLUR PANCHAYAT KM 0/0-1/450. PALLIPET BLOCK Pac.83
2023_RDTN_310759_1
DIPR/2142/TENDER/2023
Open Tender
Civil Works
Item Rate
180 days
Pallipet Block
Class I and above
5 documents required · 5 mandatory
₹0
₹1.6 L
Yes
DRDA Tiruvallur
20 Jul 2023
4 May 2023
19 May 2023
4 May 2023
19 May 2023
9 May 2023
9 May 2023
Amount
1.STRENGTHENING THE BT ROAD FROM R.K.PET-PALLIPET ROAD TO PERUMANALLUR ROAD AT PERUMANALLUR PANCHAYAT KM 0/0-1/435 .
Picking the Worn-out BT Surface including incidential charges and cleaning of all labour charges and machinery charges etc,..complet
Clearing the Scrub jungle removing from away site including incidential charges and all labour charges with burning and ashes including all labour charges etc,..complete
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 100mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete
Applying PRIMECOAT over WBM/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Applying TACKCOAT over WBM/ WMM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing and laying 50 MM Compacted thick Bituminous macadam using 26.5 - 11.2 mm graded metal and 0.10 cum of 13.20 - 2.6 mm graded metal and 0.10 cum of 2.36 mm and below with 49.50 kgs of buitumen for premixing per 10 sqm including cost and conveyance of materials to the work site and stacking them to the department metric gauge for premeasurement, heating the bitumen in bitumen boiler, heating the aggregates and mixing them with bitumen in Mini Hot Mix plant for premix carpet only, rolling by 80-100 power roller for premix carpet and seal coat separately including labour charges for spreading the mix of premix carpet, application of bitumen for seal coat over premix carpet etc, including hire charges and fuel charges for Mini Hot Mix Plant, bitumen boiler, Power roller and all other tools and plants employed etc., complete as per clause 504
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for and compaction with power roller etc.complete, for Side berms etc,.complete,.
Provision for KM Stone Charges etc,..
Provision for HM Stone Charges etc,..
Road Marking With Hot Applied Thermoplastic compound with Reflectorising Glass Beads on Bituminous Surface
Provision for Reflectors
Provision for Name Board Charges with Painting
Provision for Sign Board
Construction of 3.00 M RCC Slab culvert @ CH:0/260
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B.
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete.
Supplying and erecting centring for sides and suffits including supports and structing upto 3.29m height for plane surface in all cross bracting using MS sheets of size 90 x 60cm and 10kg stiffened with angle of size 25 x 25 x 3mm for boarding laid over silver oak joists os size 10 x 6.5mm at about 90cm C/C and supported by casuring props of 10cm 13cm dia at C/C etc., complete.
BELOW SILL
ABOVE SILL
Reinforced cement concrete 1:1 1/2:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works.
Providing and Fixing 20mm thick Compressible Fiber Board in expansion joint complete as per Drawing and MORD Technical Specification.
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
Construction of RETAINING WALL Ch:0/025 to 0/085, 0/200 to 0/260, 0/375 to 0/450 and 0/480 to 0/545
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B.
Ch:0/025 to 0/085, 0/200 to 0/260, 0/375 to 0/450 and 0/480 to 0/545
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete.
Ch:0/025 to 0/085, 0/200 to 0/260, 0/375 to 0/450 and 0/480 to 0/545
Supplying and erecting centring for sides and suffits including supports and structing upto 3.29m height for plane surface in all cross bracting using MS sheets of size 90 x 60cm and 10kg stiffened with angle of size 25 x 25 x 3mm for boarding laid over silver oak joists os size 10 x 6.5mm at about 90cm C/C and supported by casuring props of 10cm 13cm dia at C/C etc., complete.
BELOW SILL
ABOVE SILL
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete.
Ch:0/025 to 0/085, 0/200 to 0/260, 0/375 to 0/450 and 0/480 to 0/545
Routine Maintenance after completion of work the road sufrace and shoulder to be maintained in proper condition to make them free from excessive edge drop offs, roughness, scouring and pot holes and cleaning of surface drain including culverts for frre flow of water. Relettering name boards and K.M & H.M stone and other maintenance operation required to keep the road traffic worthly at all the time for the maintenance period for the following years. As per General condition of contract para 32.2.2
For 1st Year
For 2nd Year
For 3rd Year
For 4th Year
For 5th Year
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
M/s. PCN CONSTRUCTIONS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .