Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.3 LAccepted-Finance | ₹19.3 L | L1 | Accepted-Finance L1 |
| 2 | L2₹19.5 LRejected-Finance | ₹19.5 L | L2 | Rejected-Finance L2 |
| 3 | L3₹19.9 LRejected-Finance | ₹19.9 L | L3 | Rejected-Finance L3 |
| 4 | L4₹20.0 LRejected-Finance SITAPUR | UTTAR PRADESH | 261001 | ₹20.0 L | L4 | Rejected-Finance L4 |
| 5 | L5₹20.7 LRejected-Finance | ₹20.7 L | L5 | Rejected-Finance L5 |
Tender Value
₹25.9 L
EMD Value
₹1.3 L
Closing Date
27 Mar 2026, 12:00 pmClosed
AMA
Zila Panchayat Barabanki
09-Sohwa Saraiya Road Se Chiyara Damar Road Se Chak Sampark Marg Kharanja Karya.
2026_UPPRD_1126406_1
4441/Z.PBBK/2025-26
Open Tender
Civil Works - Roads
Barabanki
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
AMA
₹1.3 L
30 Mar 2026
17 Mar 2026
27 Mar 2026
17 Mar 2026
27 Mar 2026
17 Mar 2026
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5.
Laying brick soling layer on prepared sub-grade with brick on edging according to lines, graded and cross-section shown on the drawing filling joints with sand and earth, spreading 25 mm thick layer of earth over brick soling, watering and rolliing as per Technical Specification Clause 412.
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5.
Supply & Fixing Of Inauguration Stone
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
BOQ_2100560.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid