| Sl No | Description | Qty | Unit | ADHAV BUILDERSS L1 | T T CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation and depositing on bank within initial lead of 10M and initial lift of 2 metre in hard stiff clay stiff black hard red earth shales murums, gravel stoney earth and earth mixed with small size boulders and hard gravelly soil, etc., complete complying with standard specification. (CBE DATA 25-26 P-3) | 10 | m3 | 220 ₹2,200 Lowest | 220 ₹2,200 Lowest |
| 2.00 | Conveyance the excess earth or earth not suitable for refilling, dumping and spreading, levelling of the same at places of dump approved by departmental officers and as directed including lorry hire charges, labour for loading, unloading, spreading, leveling, making approaches for areas of dumps etc., complete.(CBE DATA 25-26 P-3) | 6 | m3 | 100 ₹600 Lowest | 104 ₹624 |
| 3.00 | Cement concrete 1:4:8 (one cement, four sand and eight aggregate ) using 40mm gauge hard broken granite stone jelly for All CC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete. (CBE DATA 25-26 P-4) | 3 | m3 | 5,960 ₹17,880 Lowest | 5,962.42 ₹17,887.26 |
| 4.00 | Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - 10 m 2 (P & D)Data 38 (CBE DATA 25-26 P-5) | 28 | m2 | 350 ₹9,800 Lowest | 356.06 ₹9,969.68 |
| 5.00 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors (CBE DATA 25-26 P-8) | 4 | qtl | 9,540 ₹38,160 Lowest | 9,542.15 ₹38,168.6 |
| 6.00 | Reinforced Cement concrete 1:1.5 :3 (one cement, one and half M.sand & three course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete. (CBE DATA 25-26 P-5) | 4 | m3 | 9,742 ₹38,968 Lowest | 9,744.54 ₹38,978.16 |
| 7.00 | Brick work in cement mortar 1:5 mix using Fly Ash bricks of 230x110x70mm (8 3/4" x 41/4" x 23/4") including cost of materials and labour charges etc., as per standard specification - 1m3 (CBE DATA 25-26 P-9) | 20 | m3 | 7,070 ₹1,41,400 Lowest | 7,077.32 ₹1,41,546.4 |
| 8.00 | Plastering with cement mortar 1:5 (One part of Cement and Five part of Plastering Sand (P- Sand)) 12mm, thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications (CBE DATA 25-26 P-9) | 345 | m2 | 309 ₹1,06,605 Lowest | 309.57 ₹1,06,801.65 |
| 9.00 | Painting two coats for Exterior surface with approved Exterior Plastic Emulsion paint approved quality and colour over a priming coat, including thorough scrapping, clean removal of dirt, etc complete and including necessary plaster of paris, putty, wherever required etc, complete as per standard specification. (Sl.No.404) (CBE DATA 25-26 P-12) | 345 | m2 | 290 ₹1,00,050 Lowest | 290.5 ₹1,00,222.5 |
| 10.00Add :- GST @ 18% | |||||
Tender Value
₹5.5 L
EMD Value
₹5,500
Closing Date
23 Dec 2025, 3:00 pmClosed
The Assistant Commissioner, East Zone
Coimbatore City Municipal Corporation, The Assistant Commissioner, East Zone, Singanallur, Coimbatore - 641005
Reconstruction of Compound wall at Varatharajapuram Burial Ground in ward no 60 East Zone
2025_MAWS_633485_54
E11/East zone/2025
Open Tender
Civil Works - Buildings
Works
90 days
The Assistant Commissioner, East Zone, Singanallur
As Per Tender Conditions
5 documents required · 5 mandatory
₹0
₹5,500
27 Feb 2026
22 Dec 2025
24 Dec 2025
22 Dec 2025
23 Dec 2025
22 Dec 2025
Amount
Earth work excavation and depositing on bank within initial lead of 10M and initial lift of 2 metre in hard stiff clay stiff black hard red earth shales murums, gravel stoney earth and earth mixed with small size boulders and hard gravelly soil, etc., complete complying with standard specification. (CBE DATA 25-26 P-3)
Conveyance the excess earth or earth not suitable for refilling, dumping and spreading, levelling of the same at places of dump approved by departmental officers and as directed including lorry hire charges, labour for loading, unloading, spreading, leveling, making approaches for areas of dumps etc., complete.(CBE DATA 25-26 P-3)
Cement concrete 1:4:8 (one cement, four sand and eight aggregate ) using 40mm gauge hard broken granite stone jelly for All CC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete. (CBE DATA 25-26 P-4)
Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - 10 m 2 (P & D)Data 38 (CBE DATA 25-26 P-5)
Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors (CBE DATA 25-26 P-8)
Reinforced Cement concrete 1:1.5 :3 (one cement, one and half M.sand & three course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete. (CBE DATA 25-26 P-5)
Brick work in cement mortar 1:5 mix using Fly Ash bricks of 230x110x70mm (8 3/4" x 41/4" x 23/4") including cost of materials and labour charges etc., as per standard specification - 1m3 (CBE DATA 25-26 P-9)
Plastering with cement mortar 1:5 (One part of Cement and Five part of Plastering Sand (P- Sand)) 12mm, thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications (CBE DATA 25-26 P-9)
Painting two coats for Exterior surface with approved Exterior Plastic Emulsion paint approved quality and colour over a priming coat, including thorough scrapping, clean removal of dirt, etc complete and including necessary plaster of paris, putty, wherever required etc, complete as per standard specification. (Sl.No.404) (CBE DATA 25-26 P-12)
Add :- GST @ 18%
T T CONSTRUCTION (BID ID -1543434)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
ez-e11-2025-Buildings.pdf
Tender Documents • 0.62 MB
BOQ_759906.xls
BOQ • 0.28 MB
ITB.pdf
Additional Documents • 0.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .