Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAccepted-AOC 1 283 PANIKKOTAI AYINGUDI POST THIRUVADANAI RAMANATHAPURAM DISTRICT | RAMANATHAPURAM | TAMIL NADU | 623115 | ₹1.0 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.0 Cr+₹3,209 (0.03%)Rejected-Finance N A | ₹1.0 Cr+₹3,209 (0.03%) | L2 | Rejected-Finance L2 |
| 3 | Not Admitted-Fee/PreQual/Technical 19B CHIDAMBARANATHAPURAM DEVAKOTTAI SIVAGANGAI DISTRICT | PUDUKKOTTAI | TAMIL NADU | 621308 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | N.MARIMUTHU L1 | KOP & CO L2 |
|---|---|---|---|---|---|
| 1.00Part I :Strengthening to the Road From Karankadu Seashores Road Km 0/0 - 1/096 Road Code R- 218 | |||||
| 2.00 | Clearing the Light Jungle with out uprooting including all labour charges | 150 | sqm | 6.4 ₹960 | 6.35 ₹952.5 Lowest |
| 3.00 | Pick the Existing BT surface includin g all labour Charges etc completed | 1,096 | cum | 23.4 ₹25,646.4 | 23.35 ₹25,591.6 Lowest |
| 4.00 | Earthwork in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation fo bunds, breaking clods, sectioning etc., complete. | 526.08 | cum | 140.4 ₹73,861.63 Lowest | 140.45 ₹73,887.94 |
| 5.00Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete. | |||||
| 6.00 | Km 0/0-1/0 | 90 | cum | 932.8 ₹83,952 Lowest | 933.1 ₹83,979 |
| 7.00 | KM 1/0-1/096 | 8.64 | cum | 932.8 ₹8,059.39 Lowest | 933.1 ₹8,061.98 |
| 8.00Providing and laying 75mm compacted thick WBM Grade II using 1 cum of 75mm to 22.4mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for BOTTOM LAYER | |||||
| 9.00 | Km 0/0-1/0 | 225.75 | cum | 3,586.6 ₹8,09,674.95 Lowest | 3,587.6 ₹8,09,900.7 |
| 10.00 | KM 1/0-1/096 | 21.6 | cum | 3,586.6 ₹77,470.56 Lowest | 3,587.6 ₹77,492.16 |
Tender Value
Refer Docs
EMD Value
₹1.1 L
Closing Date
3 Sept 2025, 3:00 pmClosed
The Additional Collector (Dev.)
DRDA, Ramanathapuram
Ramanathapuram District-Thiruvadanai Block - 05/MGSMT/2025-26(Phase-III)
2025_RDTN_594397_7
DIPR/4437/Tender/2025
Open Tender
Civil Works - Roads
Item Rate
180 days
DRDA
As per Tender Document
5 documents required · 5 mandatory
₹0
₹1.1 L
DRDA, Ramanathapuram
6 Nov 2025
19 Aug 2025
3 Sept 2025
19 Aug 2025
3 Sept 2025
19 Aug 2025
21 Aug 2025
Amount
Part I :Strengthening to the Road From Karankadu Seashores Road Km 0/0 - 1/096 Road Code R- 218
Clearing the Light Jungle with out uprooting including all labour charges
Pick the Existing BT surface includin g all labour Charges etc completed
Earthwork in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation fo bunds, breaking clods, sectioning etc., complete.
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.
Providing and laying 75mm compacted thick WBM Grade II using 1 cum of 75mm to 22.4mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for BOTTOM LAYER
Providing and laying 75mm compacted thick WBM Grade III using 1 cum of 75mm to 22.4mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for BOTTOM LAYER
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Kilo metre Stone
Hecta metre stone
Toe wall 0/230-0/350
Earthwork excavation and depositing on bank with initial lead and list in all classes of soils except hard rock reg. blasting etc., complete as per SS 20B for foundation.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal in layers not more 15cm thick well rammed watered and compacted compacted completed complying to standard specification.
Supply and errecting sheet centering of size 90 cm x 60cm 10 G sheet laid over silver oak joist and supported by casurina post of size 10 cm x 13 cm dia spaced at 75 cm center to center etc. complete
Cement Concrete 1:3:6mix using 40mm gauge hand broken granite stone jelly for foundation including watering whenever necessary and laid in layers not more than 15cm thick. Compacting etc.,
Part - II Strengthening the road from ECR road to Pasipattinam light house road Km 0/0 - 1/355 R-36
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.
Providing and laying 75mm compacted thick WBM Grade III using 1 cum of 63mm to 11.20mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for TOP LAYER
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Hecta metre stone
Km stone
Pipe Culvert at Ch 1357 m
Earth work excavation and deposition of bank in all classes of soils such as hard stiff clay, hard black cotton soil, hard red earth, hard murrum, etc., as per SS 20A including all labour charges etc., for widening side Berms
Collection and filling of sand including cost and conveyance to site and all labour cost
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost of conveyance of all labour cost
supply and errecting sheet centring of size 90cmx60cm10cm sheet laid over all joist and supported bu post of size 10cmx13cm dia spaced at 75cm center to conter ec
Provision for 900mm dia RCC Pipe NP3 Including all Labour Charges etc…
Cement concrete 1:3:6 mix using 40mm ISS HBG metal including cost of conveyance of all labour cost
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
KOP & CO (BID ID -1435704)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .