| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹50,040Admitted-Finance | ₹50,040 | L1 | Admitted-Finance |
| 2 | L2₹66,595+₹16,555 (33.1%)Admitted-Finance | ₹66,595+₹16,555 (33.1%) | L2 | Admitted-Finance |
| 3 | L3₹68,110+₹18,070 (36.1%)Admitted-Finance | ₹68,110+₹18,070 (36.1%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S EVERGREEN TRADERS L3 | chauhan enterprises L2 | Riya Electricals L1 |
|---|---|---|---|---|---|---|
| 1.00Carriage of following Materials from Elec. store center Unnao to work dump site with loading, unloading and proper stocking. | ||||||
| 1.01 | PCC Pole 8.5 mtr. Long | 6 | Nos | 1,200 ₹7,200 | 1,150 ₹6,900 | 1,000 ₹6,000 Lowest |
| 2.00Other loose line materials with including conductor, Single and double Pole accessories, complete stay & earthing, insulator, diff. channel & Angle, distribution Box, X-arm etc. from Elec. store center Unnao to work dump site with loading, unloading and proper stocking | ||||||
| 2.01 | L.T. A.B. Conductor 3x120+1x95+1x16 Sqmm | 220 | Mtr | 10 ₹2,200 | 12 ₹2,640 | 4 ₹880 Lowest |
| 3.00 | Dismantling of existing old O/H L.T. line including rolling back its conductor/G.I. wire from work site to dump site. | 220 | Ckt Mtr. | 100 ₹22,000 | 90 ₹19,800 | 10 ₹2,200 Lowest |
| 4.00 | Dismantling of existing old pole and X-arm, brackets, insulaors, channels and all hardware fittings. | 4 | Nos | 1,500 ₹6,000 | 1,550 ₹6,200 | 600 ₹2,400 Lowest |
| 5.00 | Erection of PCC Pole (LT Line) including digging of pits, fitting of all accessories along with cartage & dragging from dump site to pits site. | 6 | Nos | 1,500 ₹9,000 Lowest | 1,550 ₹9,300 | 1,500 ₹9,000 Lowest |
| 6.00Supply & Fixing of following materials for above job- | ||||||
| 6.01 | Suspension Clamp for ABC | 4 | Nos | 150 ₹600 | 120 ₹480 | 70 ₹280 Lowest |
| 6.02 | Dead End Clamp for ABC | 2 | Nos | 250 ₹500 | 240 ₹480 | 190 ₹380 Lowest |
Tender Value
₹62,500
Closing Date
18 Mar 2026, 5:00 pmClosed
Superintending Engineer
Superintending Engineer Electricity Distribution Circle-Unnao
Quantum of works involved in shifting of L.T. line with pole at Sangh Bhawan Near Hindustan Tiles, Gadan Khera, Unnao under the full deposit scheme under the area of EDSD-II, Unnao under EDD-P.D. Nagar, Unnao.
2026_MVVNL_1117141_1
137/E.D.C./Unnao/2025-26
Open Tender
Miscellaneous Works
Fixed-rate
180 days
Unnao
as per tender document
2 documents required · 2 mandatory
₹1,180
A/CNo.3355002101008374,IFSCCodePUNB0335500
6 Apr 2026
17 Feb 2026
19 Mar 2026
17 Feb 2026
18 Mar 2026
17 Feb 2026
Carriage of following Materials from Elec. store center Unnao to work dump site with loading, unloading and proper stocking.
PCC Pole 8.5 mtr. Long
Other loose line materials with including conductor, Single and double Pole accessories, complete stay & earthing, insulator, diff. channel & Angle, distribution Box, X-arm etc. from Elec. store center Unnao to work dump site with loading, unloading and proper stocking
L.T. A.B. Conductor 3x120+1x95+1x16 Sqmm
Dismantling of existing old O/H L.T. line including rolling back its conductor/G.I. wire from work site to dump site.
Dismantling of existing old pole and X-arm, brackets, insulaors, channels and all hardware fittings.
Erection of PCC Pole (LT Line) including digging of pits, fitting of all accessories along with cartage & dragging from dump site to pits site.
Supply & Fixing of following materials for above job-
Suspension Clamp for ABC
Dead End Clamp for ABC
L.T. Clamp with Nuts & Bolts
Eye Hook
Piercing Connector
Grouting of PCC/ST Poles as per RESPO norms with grouting material.
Earthing as per RESPO Norms
Digging of pits, fixing nuzzling and grouting of stay rods as per RESPO Norms with grouting materials.
Supply & Fixing of following materials for above job-
Stay Clamp with N&B
Stay Insulator
Stringing and sagging of O/H Three phase L.T. line by ABC of diff. size including all associated work with joint/jumpers and binding of insulators as required.
NOTE:- 1. All the material provided by contractor shall be as per norms of UPPCL/RESPO. 2. One carriage including loading/unloading from dump site to pit site is included in scope of work. 3. During execution of work all risk will be of the contractor. 4. Contractor will provided all T & P, vehicle and man power. 5. All the old and used material should be taken on book. 6. The quantity may be vary ± 20%
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.38 MB
DOC137.pdf
Tender Documents • 1.39 MB
BOQ_2075443.xls
BOQ • 0.28 MB
DateExtension11032026.pdf
PDF • 0.54 MB
date2602.pdf
PDF • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .