Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-AOC | L1 | Accepted-AOC Qualified in AOC | |
| 2 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Price Bid not complied | |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Price Bid not complied | |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Price Bid not complied | |
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Price Bid not complied |
| Sl No | Description | Qty | Unit | N.Sriramulu L1 |
|---|---|---|---|---|
| 1.00 | Earth work excavation in all types of soil lead And lift ss 20 B etc complete Including All Labour Charges Including Cost and Conveyance etc Complete. . | 46.06 | m3 | 260 ₹11,975.81 Lowest |
| 2.00 | Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. | 4.78 | m3 | 1,711 ₹8,183.23 Lowest |
| 3.00 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering including all labour charges etc.complete. | 6.84 | m3 | 5,265 ₹36,002.49 Lowest |
| 4.00 | Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. | 37.34 | m3 | 5,531 ₹2,06,529.07 Lowest |
| 5.00 | Centering Materials for Concrete works using mild steel sheets with supports including all cost and conveyance of all materials etc.complete | 120.36 | m2 | 540 ₹64,992.46 Lowest |
| 6.00 | Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. | 3.36 | m3 | 6,536 ₹21,960.96 Lowest |
| 7.00 | Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. | 3.31 | m3 | 8,931 ₹29,561.61 Lowest |
| 8.00 | Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor. | 0.36 | Mt | 90,480 ₹32,572.8 Lowest |
| 9.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works.{ GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount | 74,120.12 ₹74,120.12 Lowest |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
24 Dec 2025, 3:00 pmClosed
The Block Development officer BP
Panchayat Union office Building at Pavunjur
1.Construction of Cross Drainage Culvert in Main Road sozhakattu Village at Parameswaramangalam Panchayat in lathur Panchayat Union. Estimate.5.00 Lakhs,15th Finance BP Tied/2025-26
2025_RDTN_634110_1
Tender ref No.1011/2025/A5 ADP Date.09.12.2025
Open Tender
Civil Works
Item Wise
1.Construction of Cross Drainage Culvert in Main R
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹5,000
Yes
20 Jan 2026
18 Dec 2025
24 Dec 2025
18 Dec 2025
24 Dec 2025
18 Dec 2025
Earth work excavation in all types of soil lead And lift ss 20 B etc complete Including All Labour Charges Including Cost and Conveyance etc Complete. .
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering including all labour charges etc.complete.
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Centering Materials for Concrete works using mild steel sheets with supports including all cost and conveyance of all materials etc.complete
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
GST Amount for providing Service to Government Contract Works for the above Construction Works.{ GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.09 MB
Technical.pdf
Tender Documents • 0.30 MB
BOQ_758692.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .