| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 LAccepted-AOC SFNO 73 UTHUKULI ROAD MANNARAI TIRUPUR | TIRUPPUR | TAMIL NADU | 638051 | ₹1.8 L | L1 | Accepted-AOC L1 Accept |
| 2 | L2₹1.8 LRejected-Finance | ₹1.8 L | L2 | Rejected-Finance L2 Reject |
| Sl No | Description | Qty | Unit | R ANANDARAJ L2 | Saravanan L1 |
|---|---|---|---|---|---|
| 1.001. Extension of pipeline at Karumbirankottai AD Kudieruppu in karumbirankottai panchayat | |||||
| 2.00 | Earth work excavation and depositing on bank with initial lead of 10 m and lift of 2 M in narrow trenches for laying of pipes etc | 63 | Cum | 337 ₹21,231 | 329 ₹20,727 |
| 3.00 | Supply and delivery of following PVC Pipes
63mm OD PVC 4KSC Pipes | 100 | RM | 55 ₹5,500 | 54 ₹5,400 |
| 4.00 | Conveyance of the following rigd PVC Pipes, lowering to trenches and laying to proper grade and alignment
63mm OD PVC 4KSC Pipes | 100 | RM | 25 ₹2,500 | 23 ₹2,300 |
| 5.00 | Refiiling the excaveted soil charges including cost and conveyamce of all materials to all labour charges etc | 63 | Cum | 48 ₹3,024 | 46 ₹2,898 |
| 6.002. Construction of PUMP Room at Mela Karumbirankottai near Pillayar Koil 10000 Lr Cap OHT in Karumbirankottai Panchayat. | |||||
| 7.00 | Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay, stiff black cotton,hard red earth, shales, murrum gravel, stoney earth and eart mixed with small size boulders and hard gravelly soil as per SS20 B for foundation etc complete., | 4.04 | Cum | 265 ₹1,070.60 | 263 ₹1,062.52 |
| 8.00 | Suply and Filling withCoarse Gravel including cost and conveyance of all materials to site and all labour charges etc., | 1.01 | Cum | 285 ₹287.85 | 281 ₹283.81 |
| 9.00 | Filling with M sand including cost and conveyance of all materials to site and all labour charges etc., | 0.94 | Cum | 1,915 ₹1,800.10 | 1,913 ₹1,798.22 |
| 10.00 | Cement concrete 1:4:8 mix using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete | 0.94 | Cum | 5,760 ₹5,414.40 | 5,752 ₹5,406.88 |
Tender Value
₹1.9 L
EMD Value
₹1,940
Closing Date
13 Jan 2026, 3:00 pmClosed
Bdo,Thiruvarankulam
Pt.Union Office,Thiruvarankulam
Package No.7 - Implementation of 3 Works at Karumbirankottai Panchayat
2026_RDTN_639166_1
Tvk/T3/1753/Work-7
Open Tender
Civil Works
Thiruvarankulam
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹1,940
13 Apr 2026
7 Jan 2026
13 Jan 2026
7 Jan 2026
13 Jan 2026
7 Jan 2026
1. Extension of pipeline at Karumbirankottai AD Kudieruppu in karumbirankottai panchayat
Earth work excavation and depositing on bank with initial lead of 10 m and lift of 2 M in narrow trenches for laying of pipes etc
Supply and delivery of following PVC Pipes 63mm OD PVC 4KSC Pipes
Conveyance of the following rigd PVC Pipes, lowering to trenches and laying to proper grade and alignment 63mm OD PVC 4KSC Pipes
Refiiling the excaveted soil charges including cost and conveyamce of all materials to all labour charges etc
2. Construction of PUMP Room at Mela Karumbirankottai near Pillayar Koil 10000 Lr Cap OHT in Karumbirankottai Panchayat.
Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay, stiff black cotton,hard red earth, shales, murrum gravel, stoney earth and eart mixed with small size boulders and hard gravelly soil as per SS20 B for foundation etc complete.,
Suply and Filling withCoarse Gravel including cost and conveyance of all materials to site and all labour charges etc.,
Filling with M sand including cost and conveyance of all materials to site and all labour charges etc.,
Cement concrete 1:4:8 mix using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete
Brick work in cement mortar 1:5 mix using country bricks 83/4"x43/8"x23/4" and conveyance of all materials to site and all labour charges etc complete
R.C.C. 1:1.5:3mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.comple
Supply and FABRICATION of Steel including cost and conveyance of all materials to site and all labour charges etc.
Providing form work centering for soffits of slab of plan surface including shuttering 3m high using MS sheets of size 15 x 25 x 3 mm laid over w.joints of size 10 x 6.50 cm spaced 75mm c/c complying with standard specification
Fabrication and supply of new steel door of Size 1.000x2.00m including cost and conveyance of all labour charges etc., complete.
Providing Granolithic Pattern Floor finish with plain cement concrete 1:2:4 using 10-12 mm ISS HBG metal and top rubbed smooth etc., complete
Ceiling Plastering with cm 1:3 mix( one cement and Three sand ) to 10 mm thick including cost and conveyance of all materials in all floors etc.,as directed by departmental officers etc, complete
Plastering with cm 1:5 mix( one cement and five sand ) to 12 mm thick including cost and conveyance of all materials in all floors etc.,as directed by departmental officers etc, complete
Distempering two coats with shell lime including cost and conveyance of all labour charges etc., complete.
Emulsion Painting two coats with shell lime including cost and conveyance of all labour charges etc., complete.
painting two coats for new iron works including cost and conveyance of all labour charges etc., complete.
3. Providing House hold Tap Connection (07 Nos) and Extension of Pipeline from vandayar theru to keelakarumbirankottai in karumbirankottai Panchayat
Earth work excavation and depositing on bank with initial lead of 10 m and lift of 2 M in narrow trenches for laying of pipes etc
Supply and delivery of following PVC Pipes 63mm OD PVC 4KSC Pips
Conveyance of the following rigd PVC Pipes, lowering to trenches and laying to proper grade and alignment 63mm OD PVC 4KSC Pips
Refiiling the excaveted soil charges including cost and conveyamce of all materials to all labour charges etc
FOR FHTC
Earth work excavation and depositing on bank with initial lead of 10 m and lift of 2 M in narrow trenches for laying of pipes etc
Supply and delivery of following UPVC Pipes (Un Plasticized Polyvinyl Chloride) UPVC used for residential and home application water pressure in residential areas do not normally exceed the maximum tolerance. 20mm UPVC pipe
Conveyance of the following rigd UPVC Pipes, lowering to trenches and laying to proper grade and alignment 20mm UPVC pipe
Refiiling the excaveted soil charges including cost and conveyamce of all materials to all labour charges etc
Supply and fixing of following specials etc complete.,
20mm poly propylene comoression MTA
20mm poly propylene comoression FTA
20mm dia UPVC Elbow
15mm GM Ferrule
63mm x 20mm PVC saddle piece
Brass chromium plated screw down Tap
Provision for RCC Precast Post (0.15 x 0.15x 1.20m)
Provision for RCC Platform
Labour for drilling cutting threading and fixing ferrule in distribution pipe 20mm dia
Flow control value
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 1 & 42 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
technical_765142.pdf
techsummary_765142.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.27 MB
Tvk-Doc--7.pdf
Tender Documents • 0.19 MB
BOQ_765142.xls
BOQ • 0.52 MB
Download all tender documents and submit your bid