Tender Value
₹22.4 L
EMD Value
₹22,389
Closing Date
10 Jul 2026, 4:00 pmClosed
SE, IC, Khammam
Burhanpuram, Khammam
RAT-Restoration to OORA and CHIKATI CHERUVU, Konijerla (Habitation), Konijerla (V n M), Khammam District
712973
NIT No. 14/2026-27, Date: 30.06.2026
OPEN
Civil Works
KHAMMAM, TELANGANA
12 documents required · 12 mandatory
₹793
₹22,389
3 Jul 2026
3 Jul 2026
3 Jul 2026
Clearing thick jungle growth ( less than 50 percent open space ) including bushes upto 30 cm / parthenium and other weeds including burning or disposing off the same as directed etc., complete.
Removal of Natchu, goobi, thooti etc.,
Silt excavation from Tank Bed complete as directed by the Department
Excavation for foundation in all kinds of soil including boulders upto 0.30 m diameter for dam, spillway,intake structure and other appurtenant works and placing the excavated soil neatly in dump area or disposing off the same as directed etc., complete with initial lead upto 1 km and all lifts.
Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than 10 N /sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 260 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)
Providing and laying insitu vibrated M-15 ( 28days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for sub-structure / super structure works including cost of all materials, machinery, labour, formwork, scaffolding,cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 280 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA-- 50:30:20, FA : 0.40 cum)
Providing and laying insitu M- 20 ( 28 days cube compressive strength not less than 20 N /sqmm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for sub-structure/Super structure works including cost of all materials, machinery, labour formwork cleaning, baching, mixing, placing in position in alternative pannels, levelling compacting, finishing, curing, packing joints with asphalt mortar etc. complete with initial lead upto 50m. and all lifts.(Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)
Providing homogeneous embankment using soil from approved borrow area in layers of 25 to 30 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transportation, spreading soil in layer of specified thickness, breaking clods, sectioning, watering, compacting to density control of not less than 95 percent or as stipulated using Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete with initial lead upto 1 km and all lifts.
Manufacture, supply and delivery of 450 mm NP-3 class RCC Socket and Spigot pipes conforming to BIS 458/2003 exfactory (rate per meter of effective length ) excluding transportation and taxes and duties.
Laying and jointing 450mm dia. NP- 3 class or IRC standard hume pipes in CM 1 : 2 proportion by volume including cost of all materials ( excluding pipes and collars ), machinery, labour, aligning, packing joints with hemp, finishing, curing etc., complete as per specification, drawings or as directed by the Engineer in Charge.
Manufacture, supply and delivery of300 mm NP-3 class RCC Socket and Spigot pipes conforming to BIS 458/2003 exfactory (rate per meter of effective length ) excluding transportation and taxes and duties.
Laying and jointing 300 mm dia. NP- 3 class or IRC standard hume pipes in CM 1 : 2 proportion by volume including cost of all materials ( excluding pipes and collars ), machinery, labour, aligning, packing joints with hemp, finishing, curing etc., complete as per specification, drawings or as directed by the Engineer in Charge.
OT sluice EM Parts:Fabrication, supply, erection, testing and commissioning of sill beam,slide tracks,seal seats,guide plates etc with all accessories including cost of material,machinery,labour etc complte as per specification of drawings and approved drawings(Excluding wastage of steel @ 2.5%)
OT Sluice Gate: Fabrication, supply, erection, testing and commissioning of Skin plate,Horizontal and vertical angles , stiffeners, rubber seals ,clamps with all accessories for sluice shutters including cost of all materials, machinery, labour, seal fixing etc complete as per specification of drawings and approved drawings (Excluding wastage of [email protected]%)
OT Sluice Hoist & Hoist Bridge Gear Hoist Including Platform for Below 5 Tons Capacity(SmallGates): Fabrication, supply, erection, testing and commissioning of Embedded Parts consisting of Supporting Strucure and Platform etc with all accessories for sluice shutters including cost of all material, machinery,labour, cutting, bending, aligning, anchoring,welding, finishing etc complte as per specification of drawings (Excluding wastage of [email protected]%)
EM PARTS:Surface cleaning of metal surface by chemica cleaners and then by hand and power tool cleaners and removing dust. After cleaning, applying primary coat with one coat of protective mastic to a thickness of 70+5 microns, followed by finishing two coats with solventless coal tar epoxy each coat with a DFT of 150+5 and the total DFT of all coats including primary coat should not be less than 350 microns with material, labour and all accessories with all leads and lifts.
GATES:Surface cleaning of metal surface by chemica cleaners and then by hand and power tool cleaners and removing dust. After cleaning, applying primary coat with one coat of protective mastic to a thickness of 70+5 microns, followed by finishing two coats with solventless coal tar epoxy each coat with a DFT of 150+5 and the total DFT of all coats including primary coat should not be less than 350 microns with material, labour and all accessories with all leads and lifts.
GATES:Surface cleaning of metal surface by chemica cleaners and then by hand and power tool cleaners and removing dust. After cleaning, applying primary coat with one coat of protective mastic to a thickness of 70+5 microns, followed by finishing two coats with solventless coal tar epoxy each coat with a DFT of 150+5 and the total DFT of all coats including primary coat should not be less than 350 microns with material, labour and all accessories with all leads and lifts.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1.RAT Oora & Chikati Cheruvu BID DOC.docx
TENDER_DOCUMENT • 0.27 MB
2.BOQ Items Oora& Chikati Cheruvu.xls
TENDER_DOCUMENT • 0.53 MB
3.Milestone Oora & Chikati Cheruvu.xls
TENDER_DOCUMENT • 0.56 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .