| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.3 LAccepted-AOC | L1 | Accepted-AOC AOC | |
| 2 | L2₹10.2 L+₹42,368.28 (4.35%)Rejected-Finance NEAR NEW BUS STAND VPO BAWANI KHERA TEHSIL BAWANI KHERA DISTRICT BHIWANI 127032 | BHIWANI | HARYANA | 127032 | L2 | Rejected-Finance L2 |
Tender Value
₹8.5 L
EMD Value
₹19,998
Closing Date
19 Aug 2026, 6:55 pmClosed
Pankaj Garg
Municipal Committee Bawani Khera
9th time tender for Construction of Room of Daksh Perjapati Dharamshala at MC Bawani Khera
2026_HRY_540163_1
20263F8744D9 E3D3 4747 9352 08F9B3D89CC5343ULB
Open Tender
Civil Works
Works
240 days
Bawani Khera
2 documents required · 2 mandatory
₹1,000
₹19,998
Yes
22 Sept 2026
11 Aug 2026
20 Aug 2026
11 Aug 2026
19 Aug 2026
11 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | HSR Item 7.22.2-Brick work with common burnt clay nonmodular bricks of class designation 10.5 in superstructure
above plinth level up to floor IV level in all shapes and sizes in
: 2. Cement mortar 1:6 (1 cement : 6 coarse sand)
HSR Rate(Rs.) 4488.00 Through Rate | 1 | cum | 4,488 | ₹4,483.51 |
| 2 | HSR Item 7.28.1-Half brick masonry with common burnt clay
non-modular bricks of class designation 10.5 in superstructure
above plinth level up to floor IV level. 1. Cement mortar 1:3 (1
cement :3 coarse sand)
HSR Rate(Rs.) 519.00 Through Rate | 0.8 | Sqm | 519 | ₹414.68 |
| 3 | HSR Item 6.15.1-Reinforced cement concrete work in walls
(any thickness), including attached pilasters, buttresses, plinth
and string courses, fillets, columns, pillars, piers, abutments,
posts and struts etc. above plinth level up to floor four level,
excluding cost of centering, shuttering, finishing and
reinforcement : 1. 1:1.5:3 (1 cement : 1.5 coarse sand(zoneIII) : 3 graded stone aggregate 20 mm nominal size)
HSR Rate(Rs.) 5969.00 Through Rate | - | cum | 5,969 | - |
| 4 | HSR Item 6.30.5-Centering and shuttering including strutting,
propping etc. and removal of form for 5. Lintels, beams, plinth
beams, girders, bressumers and cantilevers
HSR Rate(Rs.) 296.00 Through Rate | 0.2 | Sqm | 296 | ₹59.2 |
| 5 | HSR Item 6.30.3-Centering and shuttering including strutting,
propping etc. and removal of form for 3. Suspended floors,
roofs, landings, balconies and access platform
HSR Rate(Rs.) 208.00 Through Rate | 0.4 | Sqm | 208 | ₹83.2 |
| 6 | HSR Item 6.34.6-Steel reinforcement for R.C.C. work, where
not included in the complete rate of RCC, including
straightening, cutting, bending, placing in position, binding,
wastage, overlaps, welded joints, spacer bars, chairs, stays,
hangers and annealed steel wire etc. complete in all respect above plinth level Note:- Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more.
HSR Rate(Rs.) 68.00 Through Rate | - | Kg | 68 | - |
| 7 | HSR Item 13.21.2-Supply and fixing Windows frames
(Chowkhats) including mullions consisting frame fabricated from sheet roll formed out of 1.2mm thick galvanized sheet as per IS:277 (Base steel as per IS 513) with zinc of 120 gm/sqm and Powder coated with pure Polyester powder up to 50 microns (as per approved colour), 3 Nos. 100mm butt - hinges
2mm thick, 6 Nos. 1.2mm thick CRCA electroplated stiffner, 6 Nos. M.S hold fast with split and tail welded to stiffner plate 200mm long, receiver for aldrop, weld less corner assembly with brackets and screws, M.S tie rod 50mm x 25mm to be fixed at bottom finished with powder coated total thickness of coating 0.6mm of approved shade, fixed in position including the cost of cement concrete for 1:2:4 for fixing lugs complete
in all respects as per drawing, design, specification and entire satisfaction of Engineer-in-charge. 2. Door Frame of size 125mm x 60mm with 37mm wide double rebate for 35mm door shutter
HSR Rate(Rs.) 1240.00 Through Rate | 1 | Metre | 1,240 | ₹1,238.76 |
| 8 | HSR Item 13.29.2-Steel work welded in built up sections/
framed work, including cutting, hoisting, fixing in position and
applying a priming coat of approved steel primer using
structural steel etc. as required. 2. In gratings, frames, guard
bar, ladder, railings, brackets, gates and similar works
HSR Rate(Rs.) 83.00 Through Rate | - | Kg | 83 | - |
| 9 | HSR Item 6.16-Reinforced cement concrete work in beams,
suspended floors, roofs having slope up to 15° landings,
balconies, shelves, chajjas, lintels, bands, plain window sills,
staircases and spiral stair cases above plinth level up to floor
four level, excluding the cost of centering, shuttering, finishing
and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand
(zone-III) : 3 graded stone aggregate 20 mm nominal size).
HSR Rate(Rs.) 6113.00 Through Rate | 1 | cum | 6,113 | ₹6,106.89 |
| 10 | HSR Item 6.30.6-Centering and shuttering including strutting,
propping etc. and removal of form for 6. Columns, Pillars,
Piers, Abutments, Posts and Struts
HSR Rate(Rs.) 262.00 Through Rate | - | Sqm | 262 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
BOQ_619478.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .