| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.0 CrAdmitted-Finance D 11 47 SURAJPUR INDUSTRIAL AREA SITE 5 GREATER NOIDA GAUTAM BUDH NAGAR UTTAR PRADESH GAUTAM BUDDHA NAGAR UTTAR PRADESH 201306 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201306 | -15.56% | ₹2.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.1 CrAdmitted-Finance | -10.61% | ₹2.1 Cr | L2 | Admitted-Finance |
| 3 | L3₹2.2 CrAdmitted-Finance 123 75 SARESH BAGH KANPUR NAGAR U P | KANPUR | KANPUR NAGAR | UTTAR PRADESH | -5.00% | ₹2.2 Cr | L3 | Admitted-Finance |
| 4 | L4₹2.3 CrAdmitted-Finance | -4.51% | ₹2.3 Cr | L4 | Admitted-Finance |
| 5 | L5₹2.3 CrAdmitted-Finance | -3.31% | ₹2.3 Cr | L5 | Admitted-Finance |
Updated dates
Tender Value
₹2.4 Cr
EMD Value
₹4.7 L
Closing Date
3 Apr 2026, 6:00 pmClosed
GM RSRDC LTD JAIPUR
GM RSRDC LTD SETU BHAWAN, JHALANA DOONGARI, JAIPUR
SITC of 200 KLD Sewage Treatment Plant and 20 KLD Effluent Treatment Plant (including 05 Years DLP and O and M) for Medical College at Jhunjhunu
2026_RSRDC_545766_1
RSRDCC NIT 768/2025-26 Dated 12.03.2026 Sl No 2
Open Tender
Civil Works - Buildings
180 days
Medical College at Jhunjhunu
PLEASE REFER TENDER DOCUMENTS
2 documents required · 2 mandatory
₹2,360
PD RSRDC UNIT JHUNJHUNU THROUGH NEFT/RTGS/IMPS
₹4.7 L
13 Apr 2026
13 Mar 2026
6 Apr 2026
13 Mar 2026
3 Apr 2026
18 Mar 2026
Sewage Treatment Plant
STP WORK 200 KLD (SEWAGE TREATMENT PLANT SITC)
SUB HEAD: SEWAGE TREATMENT PLANT
Supply, Fabrication, installation, testing and commisioning of Fully automatic sewage treatment plant based on MBR Process with sewage handling capacity of 200 KLD per day. The entire plant will be constructed in MSEP / JINK ALUMINIUM Febricated. The STP shall be designed as per Raw water, with necessary chemical dosing as required by the manufacturer's design. All the equipment, piping, pumps, air blowers and electrical panel etc. (Defect Liability Period will be 05 Years, All Parts and Machinery maintenance, Replacement included in 05 Year DLP)
Domestic Sewage from domestic Ward and Hospital toilets, kitchens etc. from the Commercial complex and shall be discharged into the STP. Design to take consideration of same.
Daily average flow : 200 M3/Day
BOD5 : 250-300 mg/l
S. Solids : 200 - 450 mg/l
COD : 450-650 mg/l
Oil & Grease : 25-50 mg/L
Sewage discharge standard after treatment as per RPCB :-
BOD5 : Less than 05 mg/l
TSS : Less than 10 mg/l
COD : Less than 50 mg/l
Oil & Grease : Less than 10 mg/l
Electro Machanical
200 KLD Sewage Treatment Plant Based MBR Technologies
Bar Screen :- Providing & fixing of 2 nos. SS-304 wire Bar Screen of size 500mm x 600mm having provision for lifting arrangement etc. complete as required. 2 Nos
EQUALIZED WASTE WATER TRANSFER PUMPS / RAW SEWAGE PUMP : 2 (1W + 1S) Nos.
Providing & fixing fully submersible sewage handling type pump for raw sewage transfer from equalization tank to aeration tank. The pump shall have complete CI construction, TEFC induction motor including pressure gauge, lifting arrangement for the pump. Solid handling shall be 25-40 mm. Make- Kirloskar/ Wilo/ Cromton Greves/ Assurity/Toshio/CNP/Eqv.
Capacity : 10 M3/hr @ Discharge Head 10-15 M head (1 Working + 1 Standby),
Air Blower :- Diffusion system shall include the following: 2 (1W + 1S) Nos.
Tri Lobe type rotary air blowers 2 Nos. (1 W + 1 S) Capable of delivering 200 cum/hr (each) of free air at 0.45 kg/cm2 driven through “V” belt or directly coupled through flexible coupling to a TEFC motor of suitable HP Suitable for 415 ± 10% volts, 3 phase, 50 cycles a/c supply for aeration of EQT, SHT and TWT. Make: Everest/Beta/Akash/Airvac/Eqvt.
Air piping :- shall comprise of pipes droppers/ laterals with MS C Class Header complete with all fittings such as tees, crosses, plugs, sockets, elbows, reducers, supports & clamps, puddle flanges etc cutting chases & making good in Plant Room. Make: Tata/Jindal/Supreme/Astral/Prince/Surya Prakash/Eqv. :- 1 Lot
Diffusers :- Fine /coarse aeration bubble diffusers as required. :- 1 Lot
Air dispersion system shall be provided for Equalisation Tank, Sludge holding Tank and Ariation Tanks. (UPVC/CPVC) :- 1 Lot
MBR Membrane with skid MOC - PVDF/SS-304 :- 1 Lot
Make- Deerfos/ Flosys/ Memtrix Technologies/ Willmer/ Eqv.
TUBE MEDIA :- Supply, installation, testing Tube Settler reactor Media Packeg a) TUBE MEDIA - 1 Lot
Make- MM Aqua/ PP Aqua/ Pharmtech/ Vasu Enviro/ Bharat Industries/Eqv.
SLUDGE TRANSFER PUMP / SLUDGE RECIRCULATION PUMP : 2 (1W + 1S) Nos.
Providing and fixing horizontal, centrifugal sludge transfer pump with 7-10mm solid handling. The pumps shall have CI casing, CI Impeller & CS shaft & sleeve with mechanical seal. MSEP common base frame.
Make- Kirloskar/ Wilo/ Cromton Greves/ Assurity/Toshio/CNP/Eqv.
Capacity 10 m3/hr @ 8-10 m head
MEMBRANE SUCTION PUMP : 2 (1W + 1S) Nos.
Providing and fixing Horizontal centrifugal pumps for filtration. The pumps shall be made of CI casing, CI Impellar, CS shaft & sleeve, Mechanical Seal are connected to a TEFC induction motor. Motor to be suitable for 250/440 V, 3 Phase, 50 cycles AC power supply.
Make- Kirloskar/ Wilo/ Cromton Greves/ Assurity/Toshio/CNP/Eqv.
Capacity 10 M3/Hr.@ 20-25M head
CIP Dosing Tank:- Supplying, installing, testing & commissioning of 1000 Litres capacity HDPE tank with inlet / outlet connection & piping. 1 No.
Make- SYNTAX / eqvt.
CIP DOSING PUMP:-
Capacity 10 m3/hr @ 25-30 M Head.
Make- Kirloskar/ Wilo/ Cromton Greves/ Assurity/Toshio/CNP/Eqv.
CEB Dosing TANK :- Supplying, installing, testing & commissioning of 1000 Litres capacity HDPE tank with inlet / outlet connection & piping. :- 2 Nos.
Make- SYNTAX / eqvt.
CEB DOSING PUMP:- 2 Nos.
Capacity 0 TO 100 LPH
Make- Edose/ Aster/ Eqvt.
All Type Valves :- 1 Lot
Make- Astral/Supreme/Marck/Kartar/Eqv.
MS 'C' class : pumps & Blower interconnecting piping. :- 1 Lot
Make- Tata/Jindal/Surya Prakash/Eqvt.
Screw Press/Filter press:- Supply, erection & commissioning screw press / filter press with sludge feed as suitable :- 1 Nos
Make: Pharmtech / Vasu Enviro / Willmer / SkyLab/Eqv.
Pressure Gauge 0 to 7 KG (SS-304) :- 10 Nos
Make:- Hguru / Forbes Marshel / Eqvt.
Lavel Switch / Float Switch :- 6 Nos
Make:- Jigo / Sibaas / Inflo / Flo / Eqvt.
Membrene Back Wash Pump :- 2 (1W+ 1S) Nos
Capacity 20-23 m3/hr @ 20 M Head.
Make- Kirloskar/ Wilo/ Cromton Greves/ Assurity/Toshio/CNP/Eqv.
Electro magnetic type flow meter :- Providing & fixing on line Electro magnetic type flow meter cum Totaliser for Monitoring the total flow, Flow rate. etc. Including electrical wiring from panel to flow meter. Complete with all type of Plumbing & Electrical connections, accessories, wiring, conduits & supports complete with all respect. :- 2 Nos
Make- Unitech/ UPC/ Eqv.
Flash Mixture With Tank :- 1 No
Make- Kirloskar/ Wilo/ Cromton Greves/ Assurity/Toshio/CNP/Eqv.
Belt Type Oil Skimmer :- 1 Nos
Make- Cutedge/ Eqvt.
Prefabricated MSEP UNIT/TANKS :- 1 SET
Anoxic Tank-1
Areation Tank-1
Tube Settler Tank-1
MBR Tank-1
MCC PANEL for STP :- 1 Nos
Required MCC PANEL capacity of MCCB for DOL/ Star Delta starter and outgoing feeders for all pumps, motors and operating equipment. Each compartment shall contain Auto/ Manual switch, contactor, relay, single phase preventer, sequential controller for auto operation of working and standby equipment complete in all respects for the following, but not limited to:
starters shall be provided with Automatic level controller As Required
Notes:
All MCCBs / MCBs shall be of 18 / 10 KA breaking capacity and suitable for motor duty application.
All motor starters shall be provided with Automatic level controller
DOL starters shall be used for motors below 10 HP and Star-Delta Starters for other motors .
Provision for dry run protection shall be made in the panel.
MCC for STP as described above
All Control system to Make the STP fully automatic. The operation of the pumps shall be controlled by the level controller.
Supplying & Fixing of Cables , Conector, Cable Trays, to make Electrical Installation Complete. Necessary cable alleys, internal / cabling, wiring, cabling from MCC to various pumps / equipment and interlocking.
Total PART A : Supply, Installation, testing & commissioning of 200 KLD capacity Compact type MBR technology based Sewage treatment plant as per above specification
ETP WORK 20 KLD (EFFULENT TREATMENT PLANT SITC)
SUB HEAD: EFFULENT TREATMENT PLANT
Supply, Fabrication, installation, testing and commisioning of Fully automatic effluent treatment plant based on Areation Process (20 KLD ETP ) with effluent handling capacity of 20 KLD per day. The entire plant will be constructed in MSEP / JINK ALUMINIUM Febricated. The ETP shall be designed as per Raw water, with necessary chemical dosing as required by the manufacturer's design. All the equipment, piping, pumps, air blowers and electrical panel etc.All Civil work Cost Excluded Related to STP/ETP. (Defect Liability Period will be 05 Years, All Parts and Machinery maintenance, Replacement included in 05 Year DLP)
Electro Machanical
20 KLD Effluent Treatment Plant Based Areation Technologies
Bar Screen :- Providing & fixing of 2 nos. SS-304 wire Bar Screen of size 500mm x 600mm having provision for lifting arrangement etc. complete as required. (Make:- Willmer/Eco Vibe Solutions Pvt. Ltd./eqv.) :- 2 Nos
EQUALIZED WASTE WATER TRANSFER PUMPS / RAW SEWAGE PUMP : 2 (1W + 1S) Nos.
Providing & fixing fully submersible sewage handling type pump for raw sewage transfer from equalization tank to aeration tank. The pump shall have complete CI construction, TEFC induction motor including pressure gauge, lifting arrangement for the pump. Solid handling shall be 25-40 mm. Make- Kirloskar/ Wilo/ Cromton Greves/ Assurity/Toshio/CNP/Eqv.
Capacity : 1 M3/hr @ Discharge Head 10-15 M head (1 Working + 1 Standby),
Air Blower :- Diffusion system shall include the following: 2 (1W + 1S) Nos
Ring Blower / Twin Lobe type rotary air blowers 2 Nos. (1 W + 1 S) Capable of delivering 20 cum/hr (each) of free air at 0.45 kg/cm2 driven through “V” belt or directly coupled through flexible coupling to a TEFC motor of suitable HP Suitable for 415 ± 10% volts, 3 phase, 50 cycles a/c supply for aeration of EQT and SHT. Make: Everest/Beta/Akash/Airvac/Usha/Eqvt.
Air piping :- shall comprise of pipes droppers/ laterals with MS C Class Header complete with all fittings such as tees, crosses, plugs, sockets, elbows, reducers, supports & clamps, puddle flanges etc cutting chases & making good in Plant Room. Make: Tata/Jindal/Supreme/Astral/Prince/Surya Prakash/Eqv. :- 1 Lot
Diffusers :- Fine /coarse aeration bubble diffusers as required. :- 1 Lot
Air dispersion system shall be provided for Equalisation Tank, Sludge holding Tank and Ariation Tanks. :- 1 Lot
TUBE MEDIA :- Supply, installation, testing Tube Settler reactor Media Package :- 1 Lot a) TUBE MEDIA -
Make- MM Aqua/ PP Aqua/ Pharmtech/ Vasu Enviro/ Eqv.
SLUDGE TRANSFER PUMP / SLUDGE RECIRCULATION PUMP : 2 (1W + 1S) Nos.
Providing and fixing horizontal, centrifugal sludge transfer pump with 7-10mm solid handling. The pumps shall have CI casing, CI Impeller & CS shaft & sleeve with mechanical seal. MSEP common base frame.
Make- Kirloskar/ Wilo/ Cromton Greves/ Assurity/Toshio/CNP/Eqv.
Capacity 1 m3/hr @ 8-10 m head
FLASH MIXTURE:-Supplying, installing, testing & commissioning of 100 Litres capacity PVC tank with inlet / outlet connection & piping.
Make- Kirloskar/ Wilo/ Cromton Greves/ Assurity/Toshio/CNP/Eqv.
Chemical Dosing TANK :- Supplying, installing, testing & commissioning of 100 Litres capacity PVC tank with inlet / outlet connection & piping. :- 3 Nos
DOSING PUMP:- 3 Nos
Capacity 0 TO 10 LPH
Make- Edose/ Aster/ Eqvt.
All Type Valves :- 1 Lot
Make- Astral/Supreme/Marck/Kartar/Eqv.
MS 'C' class : pumps & Filters interconnecting piping. :- 1 Lot
Make- Tata/Jindal/Surya Prakash/Eqvt.
Pressure Gauge 0 to 7 KG (SS-304) :- 1 Nos
Make:- Hguru / Forbes Marshel / Eqvt.
Lavel Switch / Float Switch :- 2 Nos
Make:- Jigo / Sibaas / Inflo / Flo / Eqvt.
Electro magnetic type flow meter :- Providing & fixing on line Electro magnetic type flow meter cum Totaliser for Monitoring the total flow, Flow rate. etc. Including electrical wiring from panel to flow meter. Complete with all type of Plumbing & Electrical connections, accessories, wiring, conduits & supports complete with all respect. : 1 No.
Make- Unitech/ UPC/ Eqv.
Prefabricated MSEP UNIT/TANKS : 1 SET
Anoxic Tank-1
Areation Tank-1
Pre Clarifier Tank-1
MCC PANEL for ETP :- 1 Nos
Required MCC PANEL capacity of MCCB for DOL/ Star Delta starter and outgoing feeders for all pumps, motors and operating equipment. Each compartment shall contain Auto/ Manual switch, contactor, relay, single phase preventer, sequential controller for auto operation of working and standby equipment complete in all respects for the following, but not limited to:
starters shall be provided with Automatic level controller As Required
Notes:
All MCCBs / MCBs shall be of 18 / 10 KA breaking capacity and suitable for motor duty application.
All motor starters shall be provided with Automatic level controller
DOL starters shall be used for motors below 10HP and Star-Delta Starters for other motors .
Provision for dry run protection shall be made in the panel.
MCC for STP as described above
All Control system to Make the STP fully automatic. The operation of the pumps shall be controlled by the level controller.
Supplying & Fixing of Cables , Conector, Cable Trays, to make Electrical Installation Complete. Necessary cable alleys, internal / cabling, wiring, cabling from MCC to various pumps / equipment and interlocking.
Total PART B : Supply, Installation, testing & commissioning of 20 KLD capacity Effluent treatment plant as per above specification
Note :- The scope of work as provided above (in Part A and Part B) is tentative however, any unforseen item involved for completion of the work in all respect upto the commissioning stage shall be part and parcel of the contract & cost for the same shall be borne by the bidder without any additional financial burden to the client.
Online Effluent Quality Monitoring System
* Online Effluent Quality Monitoring System (COD, BOD, TSS, pH ) With 5 Year O&M and Data transfer to RPCB
OPERATION & MAINTENANCE FOR 05 YEAR STP and ETP
The SITC of Both Sewage Treatment Plant and Effluent Treatment Plant includes 05 Years of Defect liability peroid). All Parts and Machinery maintenance, Replacement included in 05 Year DLP. The Operation and maintanance of above STP/ETP will be for 05 Years which includes 24x7 operation of STP and ETP each by skilled operator, regular backwashing/cleaning, all Consumables and any other activity required for un-hindered operation of STP and ETP. The Payment of O&M cost will be done on quarter basis (after every 3 months) after getting report of outlet parameters matching with prevailing RPCB/CPCB norms.
Five Year O & M ( O & M with All Labour/Operator's and All Consumable Chemicals and Part’s Replacement. )
OPERATION & MAINTENANCE COST FOR 1st YEAR
OPERATION & MAINTENANCE COST FOR 2nd YEAR
OPERATION & MAINTENANCE COST FOR 3rd YEAR
OPERATION & MAINTENANCE COST FOR 4th YEAR
OPERATION & MAINTENANCE COST FOR 5th YEAR
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
technical_973288.pdf
techsummary_973288.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.30 MB
spl_tc.pdf
Tender Documents • 0.91 MB
AnnexureABCD_RTPPAct2012_AnnexureC.pdf
Tender Documents • 0.10 MB
Bank_Details.pdf
Tender Documents • 0.06 MB
various_Circulars_Office_Orders.pdf
Tender Documents • 0.32 MB
agrement.pdf
Tender Documents • 0.45 MB
BOQ_973288.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid