Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.6 LAdmitted-Finance HARDOI VAIT GANJ HARDOI HARDOI HARDOI HARDOI UTTAR PRADESH 241001 | HARDOI | UTTAR PRADESH | 241001 | L1 | Admitted-Finance | |
| 2 | L2₹7.3 L+₹64,949.02 (9.82%)Admitted-Finance AZAD NAGAR AZAD NAGAR HARDOI UTTAR PRADESH 241001 UDYAM UP 35 0017189 | HARDOI | UTTAR PRADESH | 241001 | L2 | Admitted-Finance | |
| 3 | L3₹7.4 L+₹80,295.02 (12.1%)Admitted-Finance | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S S.K. CONTRACTOR AND SUPPLIER L2 | Neeraj Electricals L1 | M/S RUDRA CONTRACTOR AND SUPPLIER BAREPUR ANDHARRA HARDOI L3 |
|---|---|---|---|---|---|---|
| 1.00Carriage of Material from E.S.C. Hardoi Dump site Including loading & unloading and proper stacking | ||||||
| 1.01 | P.C.C. /ST Pole 8.5/11 mtr long | 4 | No. | 600 ₹2,400 | 550 ₹2,200 Lowest | 601 ₹2,404 |
| 1.02 | 11 KV Pin Insulator with Pin | 12 | No. | 20 ₹240 | 12 ₹144 Lowest | 21 ₹252 |
| 1.03 | 11 KV Disc Insulator with fitting | 6 | No. | 20 ₹120 | 12 ₹72 Lowest | 21 ₹126 |
| 1.04 | ACSR Weasel Conductor | 60 | Mtr. | 2 ₹120 | 1 ₹60 Lowest | 3 ₹180 |
| 1.05 | Earthing Rod | 4 | No. | 30 ₹120 | 15 ₹60 Lowest | 31 ₹124 |
| 1.06Stay Set | ||||||
| 1.07 | G.I. Wire 6/8/10 SWG | 30 | Kg. | 6 ₹180 | 3 ₹90 Lowest | 7 ₹210 |
| 1.08 | ABC Cable (3×50+1×70+1×16) mm2 | 30 | Mtr. | 6 ₹180 | 5 ₹150 Lowest | 7 ₹210 |
| 1.09LT XLPE Cable Aluminum 3.5×240mm2 | ||||||
Tender Value
Refer Docs
EMD Value
₹7,000
Closing Date
22 Sept 2025, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Asha Nagar hardoi
Electricity Distribution Circle hardoi
46/EDC(H)/2025-26
2025_MVVNL_1070859_1
46/EDC(H)/2025-26
Open Tender
Miscellaneous Works
Item Rate
180 days
EDC Asha Nagar Hardoi
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
A/C No. 066505005389, IFSC Code ICIC0000665
₹7,000
Electricity Distribution Circle hardoi
25 Sept 2025
2 Sept 2025
23 Sept 2025
2 Sept 2025
22 Sept 2025
2 Sept 2025
2 Sept 2025
Amount
Carriage of Material from E.S.C. Hardoi Dump site Including loading & unloading and proper stacking
P.C.C. /ST Pole 8.5/11 mtr long
11 KV Pin Insulator with Pin
11 KV Disc Insulator with fitting
ACSR Weasel Conductor
Earthing Rod
Stay Set
G.I. Wire 6/8/10 SWG
ABC Cable (3×50+1×70+1×16) mm2
LT XLPE Cable Aluminum 3.5×240mm2
LT XLPE Cable Aluminum 3.5×400mm2
LT XLPE Cable Aluminum 1×240mm2
25 KVA T/F
63 KVA T/F
100 KVA T/F
250 KVA T/F
400 KVA T/F
Line Meterial
Distribution Box 3-phase
Erection of PCC/ STP 8.5/11 mtr long single pole with Grouting & with all accessories (Only Pole and Insulator Supplied by department)
Erection of PCC/ STP 8.5/11 mtr long double pole with Grouting & with all accessories (Only Pole and Insulator Supplied by department)
Grouting and Nozzling of 11 KV stay set complete including fixing of necessary clamps. Accessories required including its grouting by civil material (sand, brick blast & cement). All material except stay wire shall be supplied by the contractor.
Ordinary earthing by 11 KV MS earth Rod 2500 mm long as per RESPO schedule. All material except earthing rod shall be supplied by the contractor.
Laying of LT XLPE Cable of different size
Providing Chemical Earthling and connection with transformer
Placement of 11/0.4 KV T/Fs from dump place to newly constructed T/Fs plinth/DP & installation, commissioning of 250/400/630 KVA T/Fs of T/F Plinth/DP and including jumpering with the system ( All the required martial for above job shall be provided by contractor except T/Fs)
Fabrication erection & commissioning of 100 KVA T/F on Double pole with all accessories. All material except 100 KVA T/F shall be supplied by the contractor.
Fabrication erection & commissioning of 63 KVA T/F on Double pole with all accessories. All material except 63 KVA T/F shall be supplied by the contractor.
Fabrication erection and commissioning of 25/16/10 KVA T/F on double/single pole with all accessories. All material except 25/16/10 KVA T/F shall be supplied by the contractor.
Stringing & Sagging of three phase 11 kv line
Stringing & Sagging ABC
Installation & commissioning of Distribution Box for ABC Bunch Conductor
Looping & chopping of tree branches for clearance of HT/LT line after clearance of line throughout pieces of tree branches of site
Supply & Fixing of LT Fuse unit for 100 With Grout (All Material Arrange by Contractor at his own cost)
Supply and Fixing of HT Fuse Set
Concreating of Pole
Construction of toe wall around the 11/0.4 kv S/S, size 0.75 Mt. At Base and 0.23 Mt. At top as per RESSPO Norms by lst class bricks in the ratio 1:6, Base concreting of the wall to be done in ratio 1:6:12 and plaster 12 mm thick in ratio 1:4.& fabrication of fencing with wire mesh 10SWG(37mmx50mm)(all material to be arranged by contractor).
Existing Plinth Repairing
Construction of massonary type fuse unit with provision of 3 no lt distribution circuit tail less unit.
Dismantling of old & used (Existing) Infrastructure and Safe Loading, Unloading From Site To J.E. Store/ Center Store Hardoi
10 KVA T/F
16 KVA T/F
25 KVA T/F
63 KVA T/F
100 KVA T/F
160 KVA T/F
250 KVA T/F
Line Meterial
M/S S.K. CONTRACTOR AND SUPPLIER (BID ID -5545353)
M/S RUDRA CONTRACTOR AND SUPPLIER BAREPUR ANDHARRA HARDOI (BID ID -5548881)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .