Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance CFC 3 SHOP NO 202 302 ASMEETA TEXPA ADDITIONAL KALYAN BHIWANDI INDUSTRIAL AREA MIDC VILLAGE KON BHIWANDI THANE | Admitted-Finance |
| 5 | Admitted-Finance 202 HEM OPAL EKTA SOCIETY MUMBAI PUNE OLD HIGHWAY WAKADEWADI PUNE MAHARASHTRA 411005 | PUNE | MAHARASHTRA | 411005 | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
10 Feb 2025, 3:00 pmClosed
Ex.Engineer (ENV) PCMC
PCMC Main Building
Request of quotation for appointment of experienced agency for preparation of environment Status Report for next five years of Pimpri Chinchwad Municipal Corporation
2025_PCMCP_1145930_1
Quotation/07/2024-25
Open Tender
Civil Works - Others
Lump-sum
pcmc area
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
Exempted
14 Feb 2025
4 Feb 2025
11 Feb 2025
4 Feb 2025
10 Feb 2025
4 Feb 2025
Amount
Work Name
1)Review PCMC's ESR of Previous years. Review the implementation of the Action Plans for last three years. The review shall identify the gaps in the past ESR reports and proposed steps to be taken to close the gaps including but not limited to interpretation of results, key inferences, and action points to be taken or proposed by PCMC. Perform a comparative analysis of data from the last three years to identify trends and incorporate these insights into the conclusions of each ESR section. Consultant shall review the environmental, social, and governance (ESG) report of other cities for benchmarking of the best practices including capture National, State average for each data point. -Broad level understanding of the city- to know major driving factors of the city. -Major issues (environmental and social environmental management measures. -Identifying areas of concern -Effectiveness of past and on-going environmental management measures. -Understanding city's of information to know environmental trend. 2)Conduct ESR Review Presentation -Presentation on outcome of Task 1 to Environmental department. -Finalization of ESR framework, structure and steps proposed. 3)Primary Data Collection (Data from PCMC, MPCB, RTO. MSEDCL etc.) -Primary data collection Natural. Environmental baseline data collection & analysis (AAQ, water pollution, Noise, solid waste, biodiversity, transport system etc.) -(Manmade)- NGO's Industrial community, Medical professionals, Chamber of Commerce, Media & political representatives etc. 4)Primary Data collection (Sampling and testing for Air, water, soil, Noise, Solid waste etc.) Laboratory services (NABL/MOEF Accredited lab). Per year minimum sampling and testing (including all three seasons sampling) should be a) Minimum Air sampling (AAQI)=100 Nos b) Minimum water sampling=750 Nos c) Minimum noise sampling=180 Nos d) Minimum solid waste sampling=40 Nos e) Minimum soil sampling=40 Nos Total Sampling number may increase by 20% as instructed by Engineer In Charge. -Secondary data collection and analysis (PCMC Dept, Govt. dept. like Health dept., forest dept., legal & administration, factor inspectorate, BSNL, MPCB, MSEDCL, Police Meteorological, IITM, RTO, MIDC, tourism) MNGL, PMPML, AAI, BP/HP etc) 5)Carry out an exhaustive situational analysis with sampling and laboratory testing. The ESR report must highlight the key inferences from the analysis including the causes, action plan, and recommendations, and outline the proposed mitigation measures. 6)Present on outcome of Task 1-3 after applying indicator framework to Environment Department for their feedback. 7)Present the Draft ESR Report including EPI to Environment Department to prepare a draft ESR (covering Executive (Non-Technical) summary, Abbreviations, Acknowledgements, Preamble, Objectives of ESR, Process and Methodology Followed, City introduction, Situation analysis, Gap Assessment, Key Environmental issues, Objectives & Targets, Implementation Arrangements Monitoring & Evaluation, Next steps. Annexes, Glossary) and present before environment dept. / committee and seek comments. 8)Propose immediate and long-term action plans through enabling policy measures for Pimpri Chinchwad City, focusing on the reduction of adverse environmental impacts due to various activities, including but not limited to solid waste, sewage, air, and transport. The ESR should highlight the PCMC's initiatives towards creating a sustainable city. 9)Revising draft ESR and giving shape to final ESR. Many internal meetings & discussions with our experts and government authorities for finalizing the ESR as per comments received on draft ESR by the committee. All quantitative information and data included in the ESR must be maintained in an Excel database. This database should be submitted alongside the final report to facilitate data access and analysis. 10)Final ESR Report with EPI Environmental Quality Index (EQI) Urban Infrastructure Index (UII) Quality of Life Index (QOLI) and action plan should be submitted to PCMC before 31 st May every year. The consultant shall also provide. Printing of the report must be on 100% recycled paper. A a)Hard copies of ESR in Marathi (minimum 200 Nos) B b)Hard Copies of ESR in English (minimum 50 Nos) C c)Pen Drives of English & Marathi ESR PDF (minimum 50 Nos)
Manusrushti (BID ID -6475748)
Mantras Innovation & Solution Pvt Ltd (BID ID -6479536)
SKY LAB ANALYTICAL LABORATORY (BID ID -6472566)
ABHIJIT BHANAP CONSULTANTS AND CONTRACTORS PRIVATE (BID ID -6477503)
TECHKNOWGREEN SOLUTIONS LIMITED (BID ID -6475025)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .