Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.3 CrAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | Rejected-Technical 22 KAILASH BUILDING KUTCHERY ROAD RANCHI GPO NEAR SHAHEED CHOWK RANCHI JHARKHAND 834001 | RANCHI | JHARKHAND | 834001 | - | Rejected-Technical Non Responsive |
| Sl No | Description | Qty | Unit | M/S BHANWER LAL CONTRACTOR L1 |
|---|---|---|---|---|
| 1.00 | Jungle clearance, including Cutting bushes, Shrubs and plants etc for original earthwork. | 2,39,118.5 | per sqm | 1 ₹2,39,118.5 Lowest |
| 2.00 | Uprooting Juli Flora/ sarkanda, pahari kikar or arrows upto 0.50m depth below ground level | 2,39,118.5 | per sqm | 2.63 ₹6,28,881.66 Lowest |
| 3.00 | Silt clearance/ Removal of blown sand/ berm unloading undressed with combined lead up to 50m for lined canal section for FSD more than 2m | 3,80,463.29 | per cum | 40 ₹1,52,18,531.6 Lowest |
| 4.00 | Extra for slush or daldal that which will support man's weight 1/3 qty. of silt clearance. | 1,26,821.1 | per cum | 5 ₹6,34,105.5 Lowest |
| 5.00 | Earth work excavation in ordinary soil for main canal and branches having discharge 10 cumecs & above: Earthwork undressed with combined lead upto 50m. | 1,33,093.35 | per cum | 62.14 ₹82,70,420.77 Lowest |
| 6.00 | Earth work excavation in ordinary soil for main canal and branches having discharge 10 cumecs & above: kassi work undressed | 62,720.78 | per cum | 50.85 ₹31,89,351.66 Lowest |
| 7.00 | Extra on earthwork for laying in 15 to 25 cm layears including dressing and watering as per specifications (Water to be made available by the department at one place of work site) | 90,893.72 | per cum | 15.93 ₹14,47,936.96 Lowest |
| 8.00 | Ramming of earth work in layers by wooden or irom rammer as per specifications to attain a density 90% of maximum dry density. | 90,893.72 | per cum | 22.6 ₹20,54,198.07 Lowest |
| 9.00 | Dressing of earthwork | 42,199.63 | per cum | 1.47 ₹62,033.46 Lowest |
| 10.00 | Carriage of earth for lead 1 /2 km katcha | 62,720.78 | per cum | 63.7 ₹39,95,313.69 Lowest |
Tender Value
₹19.7 Cr
EMD Value
₹39.4 L
Closing Date
22 Dec 2022, 6:00 pmClosed
Project Director PMU(RWSRPD) and Chief Engineer
Office of the Project Director PMU(RWSRPD) and Chief Engineer Water Resources(North) Hanumangarh
Renovation and Modernization of Pugal Branch RD 17.900 to 96.400 (Package 328)
2022_WRDAS_306101_29
PMU_NIB_01_2022-23
Open Tender
Civil Works
Item Rate
450 days
Bikaner district
As per bid documents
3 documents required · 3 mandatory
₹10,000
Executive Engineer, Water Resources, Division
₹39.4 L
Yes
Hanumangarh
25 Jan 2023
23 Nov 2022
23 Dec 2022
23 Nov 2022
22 Dec 2022
23 Nov 2022
23 Nov 2022 - 10 Dec 2022
6 Dec 2022
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Jungle clearance, including Cutting bushes, Shrubs and plants etc for original earthwork. | 2,39,118.5 | per sqm | 2 | ₹4,78,237 |
| 2 | Uprooting Juli Flora/ sarkanda, pahari kikar or arrows upto 0.50m depth below ground level | 2,39,118.5 | per sqm | 6.75 | ₹16,14,049.88 |
| 3 | Silt clearance/ Removal of blown sand/ berm unloading undressed with combined lead up to 50m for lined canal section for FSD more than 2m | 3,80,463.29 | per cum | 61.5 | ₹2,33,98,492.33 |
| 4 | Extra for slush or daldal that which will support man's weight 1/3 qty. of silt clearance. | 1,26,821.1 | per cum | 9 | ₹11,41,389.9 |
| 5 | Earth work excavation in ordinary soil for main canal and branches having discharge 10 cumecs & above: Earthwork undressed with combined lead upto 50m. | 1,33,093.35 | per cum | 55 | ₹73,20,134.25 |
| 6 | Earth work excavation in ordinary soil for main canal and branches having discharge 10 cumecs & above: kassi work undressed | 62,720.78 | per cum | 45 | ₹28,22,435.1 |
| 7 | Extra on earthwork for laying in 15 to 25 cm layears including dressing and watering as per specifications (Water to be made available by the department at one place of work site) | 90,893.72 | per cum | 14.1 | ₹12,81,601.45 |
| 8 | Ramming of earth work in layers by wooden or irom rammer as per specifications to attain a density 90% of maximum dry density. | 90,893.72 | per cum | 20 | ₹18,17,874.4 |
| 9 | Dressing of earthwork | 42,199.63 | per cum | 1.3 | ₹54,859.52 |
| 10 | Carriage of earth for lead 1 /2 km katcha | 62,720.78 | per cum | 56.38 | ₹35,35,883.97 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
FinalbidP-328.pdf
Tender Documents • 6.17 MB
BOQ_542741.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .