| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 CrAccepted-AOC 3RD FLOOR KRISHNA RICE MILL BUILDING PAGLASTHAN BONGAIGAON 783380 | BONGAIGAON | ASSAM | 783380 | ₹1.9 Cr | L1 | Accepted-AOC Price bid accepted |
| 2 | L2₹1.9 Cr+₹2,144 (0.01%)Rejected-Finance 414 PURBI COMPLEX A T ROAD DIST KAMRUP M GUWAHATI ASSAM | KAMRUP | ASSAM | 781030 | ₹1.9 Cr+₹2,144 (0.01%) | L2 | Rejected-Finance 2nd Lowest bidder |
| 3 | Rejected-Technical | - | - | Rejected-Technical Technically not accepted |
Tender Value
₹1.9 Cr
EMD Value
₹3.8 L
Closing Date
19 Feb 2022, 2:00 pmClosed
Chief Engineer ,DoHUA
O/O the Chief Engineer(Technical Cell), 55 Rajgarh Main Road, Guwahati-03
Construction of pathways near Shiva Mandir at Bagheswari Hill Top under CIDF at Bongaigaon for the year 2021-22
2022_DHUA_24243_1
CE/H and UA/NIT/21-22/38, date 05/02/2022
Open Tender
Civil Works
Item Rate
Guwahati
Please refer Tender documents.
4 documents required · 4 mandatory
₹3,800
Payable To the Chief Engineer, DoHUA
₹3.8 L
Yes
20 Jun 2022
5 Feb 2022
19 Feb 2022
5 Feb 2022
19 Feb 2022
7 Feb 2022
Amount
Pathway
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in charge. Hard rock (requiring blasting)
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 infoundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand)
PLAIN CEMENT CONCRETE WORKS Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources
Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete Concrete of M25 grade with minimum cement content of 330 kg /cum
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete
Lintels, beams, plinth beams, girders, bressumers and cantilevers
Columns, Pillars, Piers, Abutments, Posts and Struts
Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete. On steel work
ACHINTA NARZARY
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .