Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.1 LAccepted-AOC | ₹9.1 L | L1 | Accepted-AOC Accepted Lowest Bid hence AOC given |
| 2 | L2₹9.6 LRejected-AOC | ₹9.6 L | L2 | Rejected-AOC Rejected due to Amount is higher side |
| Sl No | Description | Qty | Unit | SAKSHI ENTERPRISES L1 | Panchhi Construction L2 |
|---|---|---|---|---|---|
| 1.00Installation of Tubewell in Village- Dabua Nit Faridabad Ward No 9. | |||||
| 1.01 | Material required-Mechanical & Electrical works,Detail given below.Supply and fixing of 2 1/2" Pump Nipple G.I. new making with Flange. | 1 | Nos | 1,500 ₹1,500 | 2,500 ₹2,500 |
| 1.02 | Supply and fixing of 2 1/2" MS Clamp HD | 1 | Each | 1,000 ₹1,000 | 1,500 ₹1,500 |
| 1.03 | Supply and fixing of Panel Box Hut | 1 | Each | 6,500 ₹6,500 | 8,500 ₹8,500 |
| 1.04 | Supply and fixing of 4" Tee (4"x4"x4" C.I. Tee)ISI Mark | 1 | Each | 2,500 ₹2,500 | 2,700 ₹2,700 |
| 1.05 | Supply and fixing of 4" Duck foot Bend C.I. ISI Mark | 1 | Each | 2,500 ₹2,500 | 2,700 ₹2,700 |
| 2.00 | Supply and fixing of 4" C.I. Bend ISI Mark | 1 | Each | 2,500 ₹2,500 | 2,700 ₹2,700 |
| 3.00 | Supply and fixing of 4" Vertical Pipe with Flange | 1 | Each | 2,500 ₹2,500 | 2,600 ₹2,600 |
| 4.00 | Supply and fixing of 4" Horizontal Pipe with Flange | 1 | Each | 2,500 ₹2,500 | 2,800 ₹2,800 |
| 5.00 | Labour charges for making tee connection with existing line excavation, cutting, jointing and making connection with existing line complete in all respects. | 1 | Each | 2,500 ₹2,500 | 5,000 ₹5,000 |
Tender Value
₹9.1 L
EMD Value
₹18,262
Closing Date
6 Jun 2025, 10:00 amClosed
Project Engineer, Nirman Kendra Faridabad
417,4th Floor, mini Secretariat, Sector 12, Faridabad
Installation of Tubewell in Village- Dabua Nit Faridabad Ward No 9.
2025_HBC_449088_1
ADC/NK/FBD/Installation of Tubewell in Village- Dabua/ 2025/Re
Open Tender
Civil Works
30 days
Village- Dabua Nit Faridabad Ward No 9.
As per Tender document
8 documents required · 8 mandatory
₹1,000
₹18,262
9 Mar 2026
26 May 2025
6 Jun 2025
26 May 2025
6 Jun 2025
26 May 2025
Amount
Installation of Tubewell in Village- Dabua Nit Faridabad Ward No 9.
Material required-Mechanical & Electrical works,Detail given below.Supply and fixing of 2 1/2" Pump Nipple G.I. new making with Flange.
Supply and fixing of 2 1/2" MS Clamp HD
Supply and fixing of Panel Box Hut
Supply and fixing of 4" Tee (4"x4"x4" C.I. Tee)ISI Mark
Supply and fixing of 4" Duck foot Bend C.I. ISI Mark
Supply and fixing of 4" C.I. Bend ISI Mark
Supply and fixing of 4" Vertical Pipe with Flange
Supply and fixing of 4" Horizontal Pipe with Flange
Labour charges for making tee connection with existing line excavation, cutting, jointing and making connection with existing line complete in all respects.
Cost of connection charges for 1 nos. Electric connection to be deposit with DHBVN (load 10HP 8 N kw )(Security , Meter Cost , Meter testing 25mm square X 3 core aluminum cable etc. complete).
Bidder Name
Amount
SAKSHI ENTERPRISES (GSTN-NA) BID ID -1273812
Panchhi Construction (GSTN-NA) BID ID -1273791
Panchhi Construction (BID ID -1273791)
Panchhi Construction (BID ID -1273791)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid