Loading…
Loading…
Tender Value
₹9.1 L
EMD Value
₹18,260
Closing Date
14 Jul 2026, 3:00 pm6d left
DFO Marwah
Forest Complex Sarkoot Kishtwar
BOQ
2026_FD_314230_1
06 of 2026-27
Open Tender
Agricultural or Forestry
60 days
Sewa Udil Range
SBD
2 documents required · 2 mandatory
₹600
DFO Marwah
₹18,260
8 Jul 2026
8 Jul 2026
15 Jul 2026
8 Jul 2026
14 Jul 2026
9 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed by Engineer in Charge | 6.34 | cum | 479.3 | ₹3,038.76 |
| 2 | Providing wood work in trusses, purlins, rafter, post plates or like components of First class Budloo/Fir wood | 5.8 | cum | 1,26,976 | ₹7,36,460.8 |
| 3 | Providing and laying in position cement concrete (1:2:4) mix excluding the cost of centring and shuttering. Plumb | 9.52 | cum | 6,591.25 | ₹62,748.7 |
| 4 | Dry random rubble masonry with hard stone in foundation and plinth: Without bond stone | 17.67 | cum | 3,262.1 | ₹57,641.31 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for: Columns, piers, abutments, pillars, posts and struts | 6.27 | sqm | 723.2 | ₹4,534.46 |
| 6 | Dry stone pitching, 225mm thick, including cost of stones and preparation of surface.using Nallah stone | 0.9 | sqm | 335.6 | ₹302.04 |
| 7 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 | 0.9 | cum | 5,733.6 | ₹5,160.24 |
| 8 | Carriage of sand at an average 20 Km by MT / 500 Mtrs by animal Transport. | 4.88 | cum | 1,003.82 | ₹4,898.64 |
| 9 | Carriage of bajri at an average 5 Km by MT / 500 Mtrs by animal Transport. | 20.99 | cum | 794.62 | ₹16,679.07 |
| 10 | Carriage of stone at an average 8 Km by MT / 500 Mtrs by animal Transport. | 17.87 | cum | 985.93 | ₹17,618.57 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.39 MB
BOQ_1021329.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid