| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.9 CrAccepted-AOC TARANGINI VILLA MAIN ROAD BHAGAT PARA PAKUR | L1 | Accepted-AOC L1 | |
| 2 | L2₹38.2 Cr+₹1.3 Cr (3.55%)Rejected-Finance | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | M/s ABC CONSTRUCTION L1 | AMITABH CONSTRUCTION PVT LTD L2 |
|---|---|---|---|---|---|
| 1.00 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth upto 300mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 meters including removal and disposal of top organic soil not exceeding 150mm in thickness. (By mechanical means using dozer in area of light jungle) RCDSOR 2.03 (i) A | 6.44 | Hect. | 92,782.88 ₹5,97,243.4 Lowest | 96,075.06 ₹6,18,435.16 |
| 2.00 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concree, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with allk lifts and lead of 1000 metres Brick work/Tile work in cement mortar RCD SOR 2.04 (ii) B | 1,978.2 | Cum | 300.16 ₹5,93,776.51 Lowest | 310.81 ₹6,14,844.34 |
| 3.00 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concree, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with allk lifts and lead of 1000 metres By manual means Cement Concrete Grade M-15 & M-20 RCD SOR 2.04 (i) I B | 75.41 | Cum | 474.3 ₹35,764.59 Lowest | 491.13 ₹37,033.66 |
| 4.00 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concree, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with allk lifts and lead of 1000 metres By Mechanical means Cement Concrete Grade M-15 & M-20 RCD SOR 2.04 (i) II B | 120.15 | Cum | 684.4 ₹82,230.66 Lowest | 708.68 ₹85,147.9 |
| 5.00 | Dismantling of flexible pavements and disposal of dismantled materials upto a leadof 1000 metres, stacking serviceable and unserviceable materials separately By Mechanical means Bituminous course RCD SOR 2.05 (ii) A | 2,372.63 | Cum | 245.33 ₹5,82,077.32 Lowest | 254.03 ₹6,02,719.2 |
| 6.00 | Dismantling of flexible pavements and disposal of dismantled materials upto a leadof 1000 metres, stacking serviceable and unserviceable materials separately By Mechanical means Granular course RCD SOR 2.05 (ii) B | 4,909.2 | Cum | 40.78 ₹2,00,197.18 Lowest | 42.23 ₹2,07,315.52 |
| 7.00 | Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials up to a alead of 1000 metres, stackiung serviceable and unserviceable materials separately RCD SOR 2.06 | 877.5 | Cum | 464.02 ₹4,07,177.55 Lowest | 480.49 ₹4,21,629.98 |
| 8.00 | Excavation for road work in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and tranporting to the embankment location within all lifts and lead upto 1000 m RCD SOR 3.06 | 3,000.56 | Cum | 65.42 ₹1,96,296.64 Lowest | 67.74 ₹2,03,257.93 |
| 9.00 | Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Table 300-2. RCD SOR 3.17 | 13,136.54 | Cum | 64.46 ₹8,46,781.37 Lowest | 66.74 ₹8,76,732.68 |
| 10.00 | Construction of Embankment with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2. RCD SOR 3.16 | 1,13,822.06 | Cum | 136.19 ₹1,55,01,426.35 Lowest | 141.02 ₹1,60,51,186.9 |
Tender Value
₹35.2 Cr
EMD Value
₹35.2 L
Closing Date
28 Jan 2026, 12:00 pmClosed
Executive Engineer, RCD, Road Division, Sahibganj
Executive Engineer, RCD, Road Division, Sahibganj
Widening and Strengthening/Reconstruction work of Dighi More (NH-80) to Malin Resore More (NH-80) via Ranigram Road (Total Length-8.176 Km) under Road Division, Sahibganj for the year 2025-26
2025_CECOM_108406_1
RCD/SAHIBGANJ/1089/2025-26
Open Tender
Civil Works
Item Rate
365 days
DIGHI MORE TO MALIN RESORE MORE VIA RANIGRAM
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹35.2 L
CE(Comm), RCD, Jharkhand, Ranchi
16 Jun 2026
30 Dec 2025
29 Jan 2026
30 Dec 2025
28 Jan 2026
7 Jan 2026
6 Jan 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth upto 300mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 meters including removal and disposal of top organic soil not exceeding 150mm in thickness. (By mechanical means using dozer in area of light jungle) RCDSOR 2.03 (i) A | 6.44 | Hect. | 88,499.5 | ₹5,69,671.28 |
| 2 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concree, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with allk lifts and lead of 1000 metres Brick work/Tile work in cement mortar RCD SOR 2.04 (ii) B | 1,978.2 | Cum | 286.3 | ₹5,66,358.66 |
| 3 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concree, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with allk lifts and lead of 1000 metres By manual means Cement Concrete Grade M-15 & M-20 RCD SOR 2.04 (i) I B | 75.41 | Cum | 452.4 | ₹34,113.22 |
| 4 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concree, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with allk lifts and lead of 1000 metres By Mechanical means Cement Concrete Grade M-15 & M-20 RCD SOR 2.04 (i) II B | 120.15 | Cum | 652.8 | ₹78,433.92 |
| 5 | Dismantling of flexible pavements and disposal of dismantled materials upto a leadof 1000 metres, stacking serviceable and unserviceable materials separately By Mechanical means Bituminous course RCD SOR 2.05 (ii) A | 2,372.63 | Cum | 234 | ₹5,55,195.42 |
| 6 | Dismantling of flexible pavements and disposal of dismantled materials upto a leadof 1000 metres, stacking serviceable and unserviceable materials separately By Mechanical means Granular course RCD SOR 2.05 (ii) B | 4,909.2 | Cum | 38.9 | ₹1,90,967.88 |
| 7 | Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials up to a alead of 1000 metres, stackiung serviceable and unserviceable materials separately RCD SOR 2.06 | 877.5 | Cum | 442.6 | ₹3,88,381.5 |
| 8 | Excavation for road work in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and tranporting to the embankment location within all lifts and lead upto 1000 m RCD SOR 3.06 | 3,000.56 | Cum | 62.4 | ₹1,87,234.94 |
| 9 | Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Table 300-2. RCD SOR 3.17 | 13,136.54 | Cum | 61.48 | ₹8,07,634.48 |
| 10 | Construction of Embankment with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2. RCD SOR 3.16 | 1,13,822.06 | Cum | 129.9 | ₹1,47,85,485.59 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.65 MB
SBD1089.pdf
Tender Documents • 4.07 MB
BOQ_146354.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .