Tender Value
₹50 L
EMD Value
₹4.5 L
Closing Date
16 Oct 2026, 12:00 pm6d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
OFFICE OF S.E. AYODHYA/AMBEDKAR NAGAR CIRCLE, PWD,
OFFICE OF S.E. AYODHYA/AMBEDKAR NAGAR CIRCLE, PWD,
Haripur Minor se Haripur sampark marg ka punar nirman Karya
2026_CEUFZ_1191740_1
5955/02kam Ayo-Ambe-Circle/26 Dt. 18-09-2026
Open Tender
Civil Works - Roads
Percentage
60 days
OFFICE OF S.E. AYODHYA/AMBEDKAR NAGAR CIRCLE, PWD
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹4.5 L
Yes
OFFICE OF S.E. AYODHYA/AMBEDKAR NAGAR CIRCLE, PWD,
1 Oct 2026
1 Oct 2026
16 Oct 2026
1 Oct 2026
16 Oct 2026
1 Oct 2026
6 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of granular sub-base by providing Well graded material Grading-1, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with Smooth wheel roller to achieve the desired density, complete as per technical clause 401 | 130 | cum | 3,200 | ₹4,16,000 |
| 2 | Providing, laying, spreading and compacting stone aggregates of 22.4-53 mm sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with Smooth wheel roller 80-100 kn in stages to proper grade and camber, applying and brooming stone dust to fill up the interstices of coarse aggregate, watering and compacting to the required density grading 3 as per Technical Specification Clause 405. | 450 | cum | 4,200 | ₹18,90,000 |
| 3 | Providing and applying primer coat with bitumen emulsion (SS) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per Technical Specification Clause 502 | 6,187.5 | Sqm | 55 | ₹3,40,312.5 |
| 4 | Providing and applying tack coat with Bitumen using distributor at the rate of 0.25 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. | 6,187.5 | Sqm | 15 | ₹92,812.5 |
| 5 | Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 KN static roller capacity, finished to required level and grades to be followed by seal coat Type C as per Technical Specification Clause 508. | 6,187.5 | Sqm | 230 | ₹14,23,125 |
| 6 | Providing and laying seal coat by manual means with VG-10 bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 | 6,187.5 | Sqm | 70 | ₹4,33,125 |
| 7 | Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. | 700 | cum | 78 | ₹54,600 |
| 8 | The routine maintenance of above road work including earthen shoulder and bituminous pavement etc to the required standards and in the manner as defined in CB condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years. (Including cost of material, T&P, labour but excluding GST) for 1st year maintenance cost @ 0.00%. | 1 | Job | - | - |
| 9 | The routine maintenance of above road work including earthen shoulder and bituminous pavement etc to the required standards and in the manner as defined in CB condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years. (Including cost of material, T&P, labour but excluding GST) for 2nd year maintenance cost @ 0.75%. | 1 | Job | - | - |
| 10 | The routine maintenance of above road work including earthen shoulder and bituminous pavement etc to the required standards and in the manner as defined in CB condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years. (Including cost of material, T&P, labour but excluding GST) for 3rd year maintenance cost @ 1.5%. | 1 | Job | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.08 MB
BOQ_2248515.xls
BOQ • 0.28 MB
t2.pdf
Tender Documents • 1.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .