Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 LAccepted-Finance 159 KAILASH GHOSH ROAD KOLKATA 700008 | KOLKATA | WEST BENGAL | 700008 | ₹4.8 L | L1 | Accepted-Finance L1 |
| 2 | L2₹4.9 LAccepted-Finance 86 PURUSOTTAM ROY STREET KOLKATA 700007 | KOLKATA | WEST BENGAL | 700007 | ₹4.9 L | L2 | Accepted-Finance L2 |
| 3 | L3₹4.9 LRejected-Finance 487 A 1 GOPAL MISHRA ROAD BEHALA KOLKATA 700034 | KOLKATA | WEST BENGAL | 700034 | ₹4.9 L | L3 | Rejected-Finance L3 |
Tender Value
₹4.8 L
EMD Value
₹9,592
Closing Date
25 Feb 2026, 1:00 pmClosed
Executive Engineer, ED-IV, EM, KMDA
Office Of The Executive Engineer, ED-IV, EM, Block-L, 3rd Floor, Unnayan Bhavan, KMDA, Salt Lake-700091
Repairing and refurbishing of Centrifuge machine (Machine No-691. 957.S1.1SS.188, Type-S1, Make-MBE Coal and Mineral Technology India Private Limited) and including supply fitting fixing of solid and Liquid Chutes and liquid discharge PVC pipe line
2026_KMDA_1007849_1
KMDA/EM/EE/ED-IV/e- NIT-10/2025-26, dated 11/02/2026
Open Tender
Electrical Work/ Equipment
30 days
Baidyabati Municipality.
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹9,592
13 Mar 2026
18 Feb 2026
27 Feb 2026
18 Feb 2026
25 Feb 2026
18 Feb 2026
Supply installation, testing and commissioning of Rubber vibrancy insulator
Supply installation, testing and commissioning of Felt Strip (14*11*490)
Supply installation, testing and commissioning of V-Belt
Supply installation, testing and commissioning of Shaft Sealing Ring(L-24)
Supply installation, testing and commissioning of Retaining Ring
Supply installation, testing and commissioning of Main Ball Bearing
Supply installation, testing and commissioning of Needle Bearing with Inner Race
Supply installation, testing and commissioning of O-Ring Viton
Supply installation, testing and commissioning of V-ring, V65A
Supply installation, testing and commissioning of Dowel Pin
Supply installation, testing and commissioning of Had chrome Ring
Supply installation, testing and commissioning of Cover Gasket
Supply installation, testing and commissioning of Circular Tube Connection
Supply installation, testing and commissioning of Solid Chutes
Supply installation, testing and commissioning of Liquid Chutes
Dismantling and Inspection of Rotor Assembly
Supply installation, testing and commissioning of Scroll Assembly Reair and Dynemic Balanceing
Supply installation, testing and commissioning of Bowl with gear box assembly repair Scroll assembly repair and dynamic balancing
Dismantling of centrifuge SI-I Humboldt incluing chutes (Solid and Liquid) and Removing of 3" old damage liquid discharge pipe and supply, fixing of pipe fitting new 6" PVC pipe and pipe fitting, loading and unloading of centrifuge by hydra crane , again installation of refurbished centrifuge along with chute .
Added:- @ 18% as GST
Added:- @ 1% as labour cess
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
Docs10_ED4.pdf
Tender Documents • 0.96 MB
BOQ_2473375.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid