Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹28.5 L
EMD Value
₹57,000
Closing Date
28 Oct 2026, 5:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
EXECUTIVE ENGINEER, RMC
RMC, RANCHI
Construction of PCC Road in Sai City Pahan toil from Vishal Verma House to Niranjan Tirkey under Ward No-34
2026_UDD_119987_1
342/ENG 2026
Open Tender
Civil Works
Works
120 days
AS PER NIT
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,800
₹57,000
16 Oct 2026
16 Oct 2026
29 Oct 2026
16 Oct 2026
28 Oct 2026
16 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Labour for cleaning the work site before and after work etc. | |||||
| 1.01 | Earthwork in excavation in foundation trenches in ordinary soil (vide classification of soil item -A) and disposal of excavated earth as obtained to a distance upto 50 m including all lifts. levelling gamming the foundation trenches.removing roots of trees,shrubs all complete as per approved design,building specification and direction of E/I. | 371.91 | M³ | 151.82 | ₹56,463.38 |
| 2 | Providing.supplying & spredjng of stone dust in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150 mm thick with all leads and lifts including cost of materials. labour,royality and taxes all complete as per specification and direction of Ell ( Mode of measurment compacted volume.) | 138.77 | M³ | 347.85 | ₹48,271.14 |
| 3 | Supplying and laying (properly as per design and drawing )rip-rap with good quality of boulders duly packed including the cost of materials,royalty all taxes etc but excluding the cost of carriage, all complete as per
specification and direction of Ell. | 233.14 | M³ | 1,756.4 | ₹4,09,487.1 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:1.5:3 ( I cement: 1.5 course sand (zone- III): 3 graded stone agreegate 20mm nominal size) | 277.54 | M³ | 4,961.73 | ₹13,77,078.54 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of from for Foundations,footings, bases of columns. etc. for mass concrete. | 130.11 | M² | 194.5 | ₹25,306.4 |
| 6 | Sand | 119.34 | M³ | 848.82 | ₹1,01,298.18 |
| 7 | Stone Dust | 138.77 | M³ | 447.06 | ₹62,038.52 |
| 8 | Stone Chips | 238.68 | M³ | 447.06 | ₹1,06,704.28 |
| 9 | Boulder | 233.14 | M³ | 679.66 | ₹1,58,455.93 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
Tendernotice_2.pdf
PDF • 1.73 MB
BOQ_162334.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .