| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹4.5 LAccepted-Finance V P O NALPUR P O KHARKHODA DISTT MEERUTH UP | MEERUT | UTTAR PRADESH | 245206 | ₹4.5 L | L-1 | Accepted-Finance Found L-1 |
| 2 | L-2₹5.0 L+₹51,900 (11.6%)Rejected-Finance DISTT KANGRA HP | KANGRA | HIMACHAL PRADESH | 176001 | ₹5.0 L+₹51,900 (11.6%) | L-2 | Rejected-Finance Not found L-1 |
| 3 | L-3₹5.0 L+₹55,000 (12.3%)Rejected-Finance | ₹5.0 L+₹55,000 (12.3%) | L-3 | Rejected-Finance Not found L-1 |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Sanjay Kumar L2 | Thakur Narender Co Pvt Ltd L3 | Sh. Dinesh Kumar L1 |
|---|---|---|---|---|---|---|
| 1.00Preparation of Detail Project Report for retrofit and up-gradation of existing sewerage scheme Una Town in Distt. Una (H.P.), including assessment of existing sewage treatment plant, estimation of quantities and cost, carrying out confirmatory field digital survey and KML file, all the studies related to establishment of system, process, hydraulic & structural design of all the components involved in the unit operations & other contingent costs related to preparation of DPR including cost of supplying of 4 (four) sets hard copies of DPR & getting the same approved from the competent authority complete to the satisfaction of Engineer-in-Charge. The technology adopted in the DPR should conform to the CPHEEO manual parameter and should be capable to treat the desired latest effluent standards of pollution board authorities, like CPCB and HPPCB. | ||||||
| 2.00 | Survey and investigation for retrofit as well as upgradation of existing 0.65 MLD Sewage Treatment Plant to Una Town in Distt. Una (H.P.), with using advanced survey technology including Differential Global Positioning System (DGPS)/ Total Station with precession limit of 0.5 cm for preparation of Site Plan, unit dimensions of existing sewage treatment plants, Geotagging of Households, Marking of Proposal, Preparation of L-section and X-section as required, for site condition in complete form. Reconnaissance survey should be conducted for preparation of contour plan in digital form with contouring interval of 1.00 meter showing features such as houses, HT lines, roads and any other required major benchmarks. Contour plan for sewerage systems at different locations latest norms along with engineering drawings and details. drawings shall be prepared with AUTOCADD and nicely binded 04 (Four) copies of set of drawings shall be in hard & in soft format; complete in all respect as per directions of Engineer in Charge. | 1 | Hect | 1,83,500 ₹1,83,500 | 1,99,000 ₹1,99,000 | 1,38,000 ₹1,38,000 Lowest |
| 3.00 | Preparation of Detailed Project Report (DPR) for retrofit as well as upgradation of 0.65 MLD Sewage Treatment Plant to Una Town in Distt. Una (H.P.) with using advanced technology, Marking of Proposal, technology upgradation of existing sewage treatment plant, design for upgradation of sewage treatment plant based for the upgraded technology aimed to achieve desired latest effluent disposal parameters prescribed by CPCB New Delhi/ HPPCP, Preparation of L-section and X-section as required, for site condition in complete form. The detailed project report should contain complete proposal with detailed design of upgraded System along with all components and latest authentic references. DPR should contain the drawing, details of measurements and abstract of cost of all STP components included for retrofit and upgradation, including, Distribution Box, secondary treatment reactor, Sludge dewatering and drying systems, Constructed Wetland (Rootzone System), Multi Media Filter, Chlorine Contact Tank, manhole chamber, inspection chamber, etc. Drawing shall be prepared with AUTOCADD and nicely winded 04 (Four) copies of set of drawings shall be in hard & in soft format; complete in all respect as per directions of Engineer in Charge. The technology adopted in the DPR should conform to the CPHEEO manual parameter and should be capable to treat the desired effluent standards as per pollution control agencies. | 1 | Hect | 3,16,400 ₹3,16,400 | 3,04,000 ₹3,04,000 Lowest | 3,10,000 ₹3,10,000 |
Tender Value
₹4.6 L
EMD Value
₹9,170
Closing Date
16 Oct 2025, 10:00 amClosed
Executive Engineer Jal Shakti Divn No.1 Una
Executive Engineer Jal Shakti Divn No.1 Una
Preparation of Detailed Project Report (DPR) for up-gradation of existing 0.65 MLD Sewage Treatment Plant to Una Town in Distt. Una (H.P)
2025_HPIPH_117360_1
No. JSV/ IDU-I/TA/E-tender/25-8686-8711 dt 09-10-25
Open Tender
Civil Works
Item Rate
90 days
Una Town
as per NIT
6 documents required · 6 mandatory
₹500
Yes
Executive Engineer Jal Shakti Divn No.1 Una
₹9,170
27 Nov 2025
9 Oct 2025
16 Oct 2025
9 Oct 2025
16 Oct 2025
9 Oct 2025
9 Oct 2025 - 16 Oct 2025
Amount
Preparation of Detail Project Report for retrofit and up-gradation of existing sewerage scheme Una Town in Distt. Una (H.P.), including assessment of existing sewage treatment plant, estimation of quantities and cost, carrying out confirmatory field digital survey and KML file, all the studies related to establishment of system, process, hydraulic & structural design of all the components involved in the unit operations & other contingent costs related to preparation of DPR including cost of supplying of 4 (four) sets hard copies of DPR & getting the same approved from the competent authority complete to the satisfaction of Engineer-in-Charge. The technology adopted in the DPR should conform to the CPHEEO manual parameter and should be capable to treat the desired latest effluent standards of pollution board authorities, like CPCB and HPPCB.
Survey and investigation for retrofit as well as upgradation of existing 0.65 MLD Sewage Treatment Plant to Una Town in Distt. Una (H.P.), with using advanced survey technology including Differential Global Positioning System (DGPS)/ Total Station with precession limit of 0.5 cm for preparation of Site Plan, unit dimensions of existing sewage treatment plants, Geotagging of Households, Marking of Proposal, Preparation of L-section and X-section as required, for site condition in complete form. Reconnaissance survey should be conducted for preparation of contour plan in digital form with contouring interval of 1.00 meter showing features such as houses, HT lines, roads and any other required major benchmarks. Contour plan for sewerage systems at different locations latest norms along with engineering drawings and details. drawings shall be prepared with AUTOCADD and nicely binded 04 (Four) copies of set of drawings shall be in hard & in soft format; complete in all respect as per directions of Engineer in Charge.
Preparation of Detailed Project Report (DPR) for retrofit as well as upgradation of 0.65 MLD Sewage Treatment Plant to Una Town in Distt. Una (H.P.) with using advanced technology, Marking of Proposal, technology upgradation of existing sewage treatment plant, design for upgradation of sewage treatment plant based for the upgraded technology aimed to achieve desired latest effluent disposal parameters prescribed by CPCB New Delhi/ HPPCP, Preparation of L-section and X-section as required, for site condition in complete form. The detailed project report should contain complete proposal with detailed design of upgraded System along with all components and latest authentic references. DPR should contain the drawing, details of measurements and abstract of cost of all STP components included for retrofit and upgradation, including, Distribution Box, secondary treatment reactor, Sludge dewatering and drying systems, Constructed Wetland (Rootzone System), Multi Media Filter, Chlorine Contact Tank, manhole chamber, inspection chamber, etc. Drawing shall be prepared with AUTOCADD and nicely winded 04 (Four) copies of set of drawings shall be in hard & in soft format; complete in all respect as per directions of Engineer in Charge. The technology adopted in the DPR should conform to the CPHEEO manual parameter and should be capable to treat the desired effluent standards as per pollution control agencies.
Sanjay Kumar (BID ID -571152)
Thakur Narender Co Pvt Ltd (BID ID -571156)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .