| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.3 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹5.4 L+₹13,540.94 (2.56%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | Rejected-Technical | - | Rejected-Technical DISQUALIFIED |
Tender Value
Refer Docs
EMD Value
₹84,650
Closing Date
12 Aug 2026, 5:00 pmClosed
G M
Nagar Nigam Ayodhya
Saket nagar ward ke saketpuri colony me 110MM PBC pipe line badalne kar karya as per Nit 06
2026_DOLBU_1173648_6
494/NNA/2026
Open Tender
Miscellaneous Works
Percentage
60 days
Ayodhya
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
MC
₹84,650
1 Oct 2026
30 Jul 2026
13 Aug 2026
30 Jul 2026
12 Aug 2026
30 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismentling of following type of Road and stacking with old materials including supply of all materials, labour,T&P etc. complete.
Tarkol Road | 227.5 | Sqm | 149.73 | ₹34,063.58 |
| 2 | Excavation of earth for pipe line trenches with lift upto 1.5 and lead upto 50M filling back the earth into trenches includind watering, ramming and disposal of surplus material with in 50M lend etc, complete.
Excavation for ordinary soil @ 70% of 231.00 cum | 159.25 | Cum | 240.05 | ₹38,227.96 |
| 3 | Excavation in mixed soil with bajri, kankar, Mooram @ 30% of 227.50 cum | - | Cum | 279.42 | - |
| 4 | Cartage of pipe from market to the site with Loading, Unloading, Labour etc. all Complete work. | 1 | job | 4,710 | ₹4,710 |
| 5 | Barricading Charge for excavation of pipe line with all labour, materials TTP etc. all Complete work. | 1 | job | 4,710 | ₹4,710 |
| 6 | Supply of 110 mm PVC pipe 6kg/cm2 pressure of ISI mark approved quality Make Supreme/Astral etc. | 350 | mtr | 542 | ₹1,89,700 |
| 7 | Laying of PVC pipe ISI mark approved quality with jointing leveling etc all Complete work. | 350 | Rm | 28.26 | ₹9,891 |
| 8 | S/F of PVC Special for Laying of Pipe Line with Tee, Band etc. @15% of Item no.5 with all Complete. | 1 | job | 28,455 | ₹28,455 |
| 9 | Supply of solvent cement | 4 | ltr | 584.04 | ₹2,336.16 |
| 10 | Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8 km. From the site of work and 9 including wateing, ramming dressing etc. Rate to include cost of all materials, lebour and T&P etc.required for proper completion of the work. | 22.75 | cum | 541.65 | ₹12,322.54 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
BOQ_2204579.xls
BOQ • 0.26 MB
06.pdf
Tender Documents • 1.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .