Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.0 LAccepted-AOC | ₹22.0 L Quoted ₹17.1 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹19.5 L+₹2.4 L (14.2%)Rejected-Finance P W D YANAM | ₹19.5 L+₹2.4 L (14.2%) | L2 | Rejected-Finance Rejected |
| 3 | L3₹19.7 L+₹2.6 L (15.2%)Rejected-Finance | ₹19.7 L+₹2.6 L (15.2%) | L3 | Rejected-Finance Rejected |
Tender Value
₹19.9 L
EMD Value
₹39,896
Closing Date
7 Feb 2024, 3:30 pmClosed
COMMISSIONER, YANAM MUNICIPALITY
YANAM MUNICIPALITY, YANAM
FORMATION OF ROADS AND DRAINS IN 1st CROSS STREET AT BEZAWADA GARDENS, YANAM
2024_DLA_14898_1
02/DB/YM/etender/2023-2024/4
Open Tender
Civil Works
Item Rate
120 days
BEZAWADA GARDENS
Please refer Tender documents.
3 documents required · 3 mandatory
₹525
₹39,896
6 Jan 2025
25 Jan 2024
7 Feb 2024
25 Jan 2024
7 Feb 2024
25 Jan 2024
Amount
4.91B Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth three wheeled steel roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite Crushable type such as moorum / gravel for screening and gravel for binding to fill up the interstices of coarse aggregate, watering and compacting to the required density - by manual means - Water bound macadam Gr-I with Gravel screening. (As per MoRTH specification, 4th Revision)
4.92C Providing, laying, spreading and compacting Cum 1,865.57 stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth 3 wheeld steel roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite Crushable type such as moorum or gravel for screening and gravel for binding to fill up the interstics of course aggregate, watering and compacting to the required density - by manual means - water bound macadam Gr-II with moorum of gravel screening. ( As per Morth specification, $th Revision).
2.6.1 Earth work in excavation by mechanical means (Hydraulic excavation) / manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10sqm on plan) including getting out and disposal of excavated earth, lead upto 50m and lift upto 1.5m - all kinds of soil
2.27: Supplying and filling in plinth with sand under floors including, watering, ramming consolidating and dressing complete.
4.1.10: Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering.- All work upto plinth level -1:5:10 (1 cement:5coarse sand : 10 graded stone aggregate 40mm nominal size)
4.1.3: Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering.- All work upto plinth level -1:2:4 (1 cement:2coarse sand : 4 graded stone aggregate 20mm nominal size)
4.3.1 Centring and shuttering including strutting propping etc. and removal of gorm work for foundations, footings, bases for columns.
5.22.7 Steel reinforcement for R.C.C.work including straightening , cutting , bending , placing in position and binding all complete upto plinth level - Thermo -Mechanically treated bars (ISI BRAND OF APPROVED MAKE) Fe - 415 or more
13.1.1: 12mm cement plaster of mix :Cement mortar 1:4 (1 cement : 4 fine sand)
7.23B.MO Providing and fixing prmoulded bitumen joint filler, for expansion joints including the cost of sealing compound and priming coat - 25 mm wide.
Kondamuri Sathibabu
VBRUSHI
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .