| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 LAccepted-AOC | L1 | Accepted-AOC Aceepted | |
| 2 | L2₹1.9 L+₹2,793 (1.50%)Rejected-AOC | L2 | Rejected-AOC Rejected |
Tender Value
₹2.5 L
EMD Value
₹2,500
Closing Date
27 Dec 2023, 3:00 pmClosed
The Assistant Commissioner,
North Zone, Coimbatore Corporation, Balasundaram Road,Oppsite Womens Polytechnic
Supply of Monoblock motor pumpset to the existing sump at VKL nagar in ward no 14, North Zone
2023_MAWS_401647_16
E8/NorthZone/2023-24
Open Tender
Civil Works - Water Works
Works
90 days
North Zone, Coimbatore Corporation
As per the tender condition attached
3 documents required · 3 mandatory
₹0
₹2,500
6 Oct 2024
21 Dec 2023
28 Dec 2023
21 Dec 2023
27 Dec 2023
21 Dec 2023
Amount
1.Supply, erection, testing and commissioning of Monoblock Motor Pump set of 900 LPM at 40 meters head to develop 3.5 Kg / sq.cm at the highest and farthest hydrant point to make 30m water jet at the time of fire fighting emergency circumstances, coupled with 11 KW / 15 HP rated three phase 414 volts, 50 Hz, 2880 rpm electrical motor the pump with cast iron body, bronze impeller, rope gland packaging, suction size of 80 mm dia, delivery size of 65 mm dia, including the cost of foundation concrete, anti-vibration mounting, rain safety hood and etc., complete as directed by the Departmental Officers
2.Supply of 50mm dia G.I. pipe 'B' class Bore pipe of appd brand etc complete
3.Supply of 50mm Bore coupling (heavy) of approved brand
4.Supply of 3 Core 4Sq.mm pvc insulated flat Copper Cable etc complete
5.Labour Charges for erection of Horizontal shaft, centrifugal pumpset (Coupled/Monoblock) in Open well including fixing of suction pipe and foot valve upto a maximum depth of 7 metres and delivery pipes to the required length with valves, pressure gauges upto the exterior wall of pump room and erection of panel board consisting of TPIC switches starter, Voltmeter, Ammeter, Capacitor single phasing preventor and laying and jointing the cables and twin earthing as per IE rules including providing bed blocks etc., complete and operating the pumps and trial run for 10 days including signing of completion of reports as required by EB authorities.
Add :- GST @ 18%
S R ENGINEERS AND BUILDERS
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_478596.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .