Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.5 LAccepted-AOC | L1 | Accepted-AOC ACCEPTED BEING L1 | |
| 2 | L2₹7.4 L+₹87,841 (13.5%)Rejected-AOC 03 PATEL STREET GANDHI NAGAR AVADI TIRUVALLUR TAMIL NADU 600054 | THIRUVALLUR | TAMIL NADU | 600054 | L2 | Rejected-AOC REJECTED DUE TO NOT BEING L1 |
Tender Value
₹8 L
EMD Value
₹16,000
Closing Date
26 Dec 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Garrison Engineer M NAS Arakkonam
Garrison Engineer M NAS Arakkonam 631006
EMERGENCY REPAIRS AND OVERHAULING SERVICING MAINTENACE OF MES B VEHICLES UNDER GE M ARAKKONAM
2023_MES_629399_1
8332E8
Open Tender
Machineries/ Mechanical Engg Items
Item Rate
330 days
Garrison Engineer M NAS Arakkonam
AS PER NIT
7 documents required · 7 mandatory
₹500
Garrison Engineer M NAS Arakkonam
₹16,000
Yes
9 Jan 2024
23 Nov 2023
28 Dec 2023
23 Nov 2023
26 Dec 2023
7 Dec 2023
Amount
Periodical maintenance (weekly) of following vehicles as per manufacturer recommendation complete all as specified and as directed by Engr-in-charge.
Eicher (07D-174121P)
Eicher (07D-174120X)
Eicher (05D-165174X)
TATA Mobile (05C-076366P)
TATA Mobile (07C-081148K)
TATA Mobile (15C-103444W)
TATA Mobile (15C-103443Y)
Maruti Suzuki dzire LXI (20B-136245K)
Enfield bullet (05A-057455L)
Enfield bullet (05A-057760Y)
Enfield bullet (11A-061952K)
Enfield bullet (07A-052279Y)
Enfield bullet (11A-061953E)
Hero Honda Splender Plus (14A-068391L)
Hero Honda Splender Plus 22A-075996E
Note for ser item No 1 to 1.15: periodical maintenance includes the following activities (i) Checking the fuel and oil filter ascertaining its condition. (ii) Checking the fan, fan belt and adjusting tension. (iii) Checking the Air filter and cleaning the Air filter. (iv) Checking of oil level and ascertain its condition. (v) Checking the fuel pump timing and adjusting if required. (vi)Checking of fuel tank, fuel pump, injector/carburettor. (vii) Tightening all bolt and nuts and mounting bolts and nuts. (viii) Checking the adjustment of the self starter and dynamo. (ix) Checking the battery distilled water level and topping up to the required level. (x) Checking the radiator and radiator hose and arresting leak if any. (xi) Checking the air pressure in the wheels and arresting leak if any. (xii) Greasing and oiling all bearings/moving parts of suspention, transmission, steering etc (xiii) cleaning engine and check for engine mounting/ any leakages (xiv) Checking tightess of radiator mounting, hoses
(xv) checking self starter and its mountings (xvi) Checking for wiring system and ignition for wear/damage of insulation and rectify the damage if any (xvii) checking of chases, wheels and break systems. (xviii). service report from authorised service center shall be submitted for every month. (xix). Cost for Highly skilled labours and T&P necessary for maintenance/ checks repairs/ replacement is deemed to be included in the rate quoated by the contractor (xiv). Distilled water,Electrolite, Grease etc for maintenance of vehicle is deemed to be included in the rate quoated by the contractor. (xv). Replacement/top up of any type Oil shall be measured and paid under relevant items as supply only and labour cost is deemed to be included in the above quoted rate. (xvi) Replacement of fuel /Oil/Air filter shall be measured and paid as supply only under relevant items and labour cost is deemed to be included in the above quoted rate. (xvii). Spares required for replacement during above maintenance shall be measured and paid under relevant item as supply only and labour cost is deemed to be included in the above quoted rate.
Supply only new Suspension bolt suitable for TATA Mobile complete all as specified and as directed by Engr-in-charge.
Supply only new Junction Rod end for TATA Mobile complete all as specified and as directed by Engr-in-charge.
Supply only new Dry unit with assy for TATA Mobile complete all as specified and as directed by Engr-in-charge.
Supply only Upper ball joint for Tata Mobile complete all as specified and as directed by Engr-in-charge.
Supply only Low ball joint for Tata Mobile complete all as specified and as directed by Engr-in-charge.
Supply only Centre pin bracket for Tata Mobile complete all as specified and as directed by Engr-in-charge.
Supply only Centre pin bush for Tata Mobile complete all as specified and as directed by Engr-in-charge.
Supply only Brake pad for Tata Mobile complete all as specified and as directed by Engr-in-charge.
Supply only Cliper hanger for Tata Mobile complete all as specified and as directed by Engr-in-charge.
Supply only Cliper accessories for Tata Mobile complete all as specified and as directed by Engr-in-charge.
Supply only Rear brake shoe for Tata Mobile complete all as specified and as directed by Engr-in-charge.
Supply only Brake pipe for Tata Mobile complete all as specified and as directed by Engr-in-charge.
Supply only Rear brake disc for Tata Mobile complete all as specified and as directed by Engr-in-charge.
Supply only Rear brake bracing for Tata Mobile complete all as specified and as directed by Engr-in-charge.
Supply only Front Hub bracing for Tata Mobile and supply and fixing new front Hub bracing and testing complete all as specified and as directed by Engr-in-charge.
Supply only Rear axcle coil seal for Tata Mobile complete all as specified and as directed by Engr-in-charge.
Supply only Front coil spring of Tata Mobile complete all as specified and as directed by Engr-in-charge.
Supply only Rear main spring for Tata Mobile complete all as specified and as directed by Engr-in-charge.
Supply only Rear spring bush for Tata Mobile complete all as specified and as directed by Engr-in-charge.
Supply only Rear Shocker assy for Tata Mobile complete all as specified and as directed by Engr-in-charge.
Supply only water pump accessories complete for Tata Mobile complete all as specified and as directed by Engr-in-charge.
Supply only Oil pump accessories complete for Tata Mobile complete all as specified and as directed by Engr-in-charge.
Supply only Gear box mounting complete for Tata Mobile complete all as specified and as directed by Engr-in-charge.
Supply only Gear shifter shaft complete for Tata Mobile complete all as specified and as directed by Engr-in-charge.
Supply only Clutch plate complete for Tata Mobile complete all as specified and as directed by Engr-in-charge.
Supply only Door lock complete for Tata Mobile complete all as specified and as directed by Engr-in-charge.
Supply only Release bearing for Tata Mobile complete all as specified and as directed by Engr-in-charge.
Supply only Silencer accessories complete for Tata Mobile complete all as specified and as directed by Engr-in-charge.
Supply only Shocker absorber complete for Tata Mobile complete all as specified and as directed by Engr-in-charge.
Supply only Air cleaner filter complete for Tata Mobile complete all as specified and as directed by Engr-in-charge.
Supply only Side mirror for Tata Mobile complete all as specified and as directed by Engr-in-charge.
Supply only Diesel filter for Tata Mobile complete all as specified and as directed by Engr-in-charge.
Supply only Oil filter for Tata Mobile complete all as specified and as directed by Engr-in-charge.
Supply only Brake oil for TATA mobile complete all as specified and as directed by Engr-in-charge. Note for Item 2 to 35: labour cost for replacement is deemed to be included in the rate quoted for item No. 1.04 to 1.07 here-in-before.
Supply only Turn signal lamp assy (turn indicator) of vehicle Eicher complete all as specified and as directed by Engr-in-charge.
Supply only Hub greasing unit kit of vehicle Eicher complete all as specified and as directed by Engr-in-charge.
Supply only diesel filter set of vehicle Eicher complete all as specified and as directed by Engr-in-charge.
Supply only Hose flexible for vehicle Eicher complete all as specified and as directed by Engr-in-charge.
Supply only return hose of oil vaccum pump of vehicle Eicher complete all as specified and as directed by Engr-in-charge.
Supply only new Bearing set (Centre bearing) complete all as specified and as directed by Engr-in-charge.
Supply only new V-Belt suitable for cooling fan of vehicle Eicher complete all as specified and as directed by Engr-in-charge.
Supply only Kit brake lining (320x110) (STD) ALHC of Eicher complete all as specified and as directed by Engr-in-charge.
Supply only Spring shoe return, F&R-Swan of Eicher complete all as specified and as directed by Engr-in-charge.
Supply only Air filter set E483TC complete all as specified and as directed by Engr-in-charge.
Supply only head light Lamp Combination of Eicher complete all as specified and as directed by Engr-in-charge.
Supply only King Pin Kit of Eicher complete all as specified and as directed by Engr-in-charge.
Supply only Brake Oil Dot-4 of Eicher complete all as specified and as directed by Engr-in-charge.
Supply only new Clutch Kit of existing specification/ capacity suitable for Eicher complete all as specified and as directed by Engr-in-charge.
Supply only new WC KIT FR LH / FR RH as per existing specification complete all as specified and as directed by Engr-in-charge.
Supply only new Rear Minor Kit(LCV) Dia 31.75 complete all as specified and as directed by Engr-in-charge.
Supply only new Mirror Assy Room Canter-90 suitable for Eicher complete all as specified and as directed by Engr-in-charge.
Supply only new Gear Box Bushing Kit complete all as specified and as directed by Engr-in-charge.
Supply only Oil filter for Eicher complete all as specified and as directed by Engr-in-charge. Note for Item 21 to 54: labour cost for replacement is deemed to be included in the rate quoted for item No. 1.01 to 1.07 here-in-before.
Supply only Battery Lead for all vehicles complete all as specified and as directed by Engr-in-charge.
Supply only Battery terminal for all vehicles complete all as specified and as directed by Engr-in-charge.
Supply only Coolant for Eicher/ TATA Mobile complete all as specified and as directed by Engr-in-charge.
Supply only Horn kit complete suitable fo Tata mobile/ Eicher complete all as specified and as directed by Engr-in-charge.
Supply only Transmission oil for Eicher/ TATA Mobile complete all as specified and as directed by Engr-in-charge.
Supply only rear view mirror complete suitable for Tata Mobile /Eicher complete all as specified and as directed by Engr-in-charge.
Supply only Engine oil for Eicher/ TATA Mobile complete all as specified and as directed by Engr-in-charge.
Supply only Turning lamp for TATA Mobile complete all as specified and as directed by Engr-in-charge.
Supply only Gear box oil for Eicher/ TATA Mobile complete all as specified and as directed by Engr-in-charge. Note for Item 21 to 63: labour cost for replacement is deemed to be included in the rate quoted for item No. 1.01 to 1.07 here-in-before.
Material and labour for repairs and servicing of self starter including replacement of worn out/ unserviceable parts complete all as specified and as directed by Engr-in-charge. Note: Spares required will be measured and paid separately under relevant item No. 64.01 to 64.03 of the schedule as supply only labour cost is deemed to be included in the above item 64.
Supply only Soleniod switch any type for self starter.
Supply only Carbon brush set any type with brush holder
Supply only Drive End Plunger
Supply only the following items are for incorporating in Item No. 1.09 to 1.15 here in before complete all as specified and as directed by Engr-in-charge. Note: labour cost for replacement is deemed to be included in the rate quoted for item No.01 here-in-before.
Gasket kit for Hero honda / motor cycle RE .
Chain set with chain for Hero honda / motor cycle RE
Clutch disc for Hero honda / motor cycle RE
Oil seal kit for Hero honda / motor cycle RE
Spark plug for Hero honda / Motor cycle RE
Timing push rod for Hero honda
Engine oil for Hero honda/ Motor cycle RE
Bty terminal for Hero honda/ Motor cycle RE
Bty Lead for all vehsfor Hero honda/ Motor cycle RE
Nut & Bolts of various size for Hero honda/ Motor cycle RE
Material and labour for dismantling and repairs to fuel injection feed pump of TATA Mobile including replacement of worn out spares like delivery valves, Nozzles, bearings, fly weight, packing kit, and copper washer kit and including reassembling and recalibration of pump complete all as specified and as directed by Engr-in-charge.
Material and labour for removing wheel complete of any vehicle with tyre and tube and taking out tube for repair and testing for leakage after repair including reassembling after repair complete all as specified and as directed by Engr-in-charge.
Material and labour for repairs to upholstry work for Two wheeler as per existing complete all as specified and as directed by Engr-in-charge.
Material and labour for disconnecting, removing radiator assembly from the Vehicle Eicher /Tata Mobile and descaling the radiator throughly with CTC solution/ any other chemical solvent agent, stopping of leakeage at place of copper cores and tubes by brazing including scapping and re-installing after repair including testing complete all as specified and as directed by Engr-in-charge.
Material and labour for replacement of work out spares like Bendex drive, carbon brush, solinoid coil, Armature including rewinding stator including necessary testing complete all as specified and as directed by Engr-in-charge.
Material and labour for dismantling unserviceable Element filter of Air Compressor and supply and fixing new Element filter and testing complete all as specified and as directed by Engr-in-charge.
Dismantling unserviceable Pully CI QG of Air Compressor and supply and fixing new Pully CI QG and testing complete all as specified and as directed by Engr-in-charge.
Dismantling unserviceable Body valve control of Air Compressor and supply and fixing new Body valve control and testing complete all as specified and as directed by Engr-in-charge.
Dismantling unserviceable Valve bypass thermal pin of Air Compressor and supply and fixing new Valve bypass thermal pin and testing complete all as specified and as directed by Engr-in-charge.
Servicing/ maintenance of Car washer plant model No LL 03 022as per manufacturer recommendation complete all as specified and as directed by Engr-in-charge.:- Required spares will be measured and paid seperatly for the following items Sl No. 76 to 84
Supply only Plunger Item code No -110319200 Make ELGI
Supply only Packing ring lipped Item code No - 110 460 250 Make : ELGI
Spring plate Item code No -110510510 Make : ELGI
Ring split Item code No - 110510500 make : ELGI
Locking piece Item code No - 110424050 Make : ELGI
Valve suction M/C Item code No - 110422992 Make : ELGI
Spring Valve suction M/c Item code No - 110423910 Make : ELGI
Valve Delivery Valve Item code No -110425052 Make : ELGI
Belt V A 58 Item code No -000905158 Make : ELGI
Material and labour for tyre rotation including wheel balancing for all vehicles as per manufacturer recommendation at company authorized shop including submission of report complete all as specified and as directed by Engr-in-charge.
Supply only Wiper Blade for TATA Mobile complete all as specified and as directed by Engr-in-charge. Note for Item 75: labour cost for replacement is deemed to be included in the rate quoted for item No. 1.04 to 1.07 here-in-before.
SIVA ENTERPRISES
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .