Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance M 241 RAGAVENDRA NAGAR TNHB SEVELIMEDU KANCHIPURAM DISTRICT TAMIL NADU 631 502 | SEVELIMEDU | KANCHIPURAM | TAMIL NADU | 631502 | Admitted-Finance |
| 2 | Rejected-Technical | Rejected-Technical Technically Rejected |
| 3 | Rejected-Technical NO 12 14 3RD STREET ANNAI SATHYA NAGAR CHENNAI 600 118 | CHENNAI | CHENNAI | TAMIL NADU | 600118 | Rejected-Technical Technically Rejected |
| 4 | Rejected-Technical 88 30 RAMASAMY GARDEN ADYAR ARUNACHALAPURAM ADYAR CHENNAI TAMIL NADU 600020 | CHENNAI | TAMIL NADU | 600020 | Rejected-Technical Technically Rejected |
Tender Value
Refer Docs
EMD Value
₹26,400
Closing Date
10 Jan 2023, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Archaeologist
O/o The Superintending Archaeologist, Archaeological Survey of India, Chennai Circle
AMUK OF ARCHAEOLOGICAL GARDEN AT SHORE TEMPLE, MAMALLAPURAM, TAMIL NADU 2022-23
2023_ASI_732596_1
Divi/TAMI/Divi/10968974
Limited
Civil Works - Buildings
Works
60 days
As Per Tender Documents
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹26,400
Yes
12 Jan 2023
2 Jan 2023
11 Jan 2023
2 Jan 2023
10 Jan 2023
2 Jan 2023
Amount
Carefully removing of exiting damaged hedge plants (300 mtr X 2 sides of pathway = 600 m) including cost, conveyance of all materials, labour charges, loading and un loading charges etc., and also includes all charges and other applicable taxes all as directed by the department officials. (Quantity may be varied as per site conditions).
Preparation of beds for hedging by excavating 60 cm deep and trenching the excavated base to a further depth of 30 cm, refilling the excavated earth after breaking clods and mixing with manure in the ratio of 8:1 (8 parts of stacked volume of earth after reduction by 20%: one part of stacked volume of sludge or manure after reduction by 8%), flooding with water, filling with earth if necessary, watering and finally fine dressing, leveling etc. including stacking and disposal of materials declared unserviceable and surplus earth by spreading and leveling as directed, within a lead of 50 m, lift up to 1.5 m complete (cost of manure or extra earth to be paid for separately) (600mX1m X0.60 m = 360m) etc complete including cost, conveyance of all materials, labour charges, loading and un loading charges etc., and also includes all charges and other applicable taxes all as directed by the department officials. (Quantity may be varied as per site conditions).
Cost and supply of Good Earth free from stones, earth clods, stubbles, weeds or other objectionable / extraneous matter or debris. It shall contain no toxic material and should not be delivered in muddy condition. The pH value of the soil must be from 6.5 to 7.5, which should be ensured by the contractor by random testing of soil in any reputed laboratory and also includes GST, and other applicable taxes if any etc. complete all specifications are as directed by the department officials. (Quantity may be varied as per site conditions).
Cost and supply of Vermicompost including cost, conveyance of all materials, labour charges, loading and un loading charges etc., and also includes all charges and other applicable taxes all as directed by the department officials. (Quantity may be varied as per site conditions).
Cost and supply of hedge plans ( 300 mts X 10 plants (per one mtr) X 2 lines = 6000 plants X 2 sides of pathway = 12000 plants including cost, conveyance of all materials, labour charges, loading and un loading charges etc., and also includes all charges and other applicable taxes all as directed by the department officials. (Quantity may be varied as per site conditions).
Cost of planting new hedge plants including cost, conveyance of all materials, labour charges, loading and un loading charges etc., and also includes all charges and other applicable taxes all as directed by the department officials. (Quantity may be varied as per site conditions).
Weeding out of lawn by removal of all weeds and other wild growth with roots by forking including disposal of garden rubbish with all loads and lifts complete if top dressing required (inside lawn at shore temple – 2acre – 4047 sqm X 2 =8094 sqm including cost, conveyance of all materials, labour charges, loading and un loading charges etc., and also includes all charges and other applicable taxes all as directed by the department officials. (Quantity may be varied as per site conditions).
Cost and supply of flowering plants - Allamanda plant (1 ft ht healthy plant in 9” poly bag) (13 rectangle beds X 20 plants = 260) including cost, conveyance of all materials, labour charges, loading and un loading charges etc., and also includes all charges and other applicable taxes all as directed by the department officials. (Quantity may be varied as per site conditions).
Cost and supply of flowering plants - Ficus sp. Plants ( 4 ft ht healthy plant in 12” poly bag) for dot plants including cost, conveyance of all materials, labour charges, loading and un loading charges etc., and also includes all charges and other applicable taxes all as directed by the department officials. (Quantity may be varied as per site conditions).
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. ( back side of new toilet block) including cost, conveyance of all materials, labour charges, loading and un loading charges etc., and also includes all charges and other applicable taxes all as directed by the department officials. (Quantity may be varied as per site conditions).
Cost and supply of 9” earthen pots for potted plants including cost, conveyance of all materials, labour charges, loading and un loading charges etc., and also includes all charges and other applicable taxes all as directed by the department officials. (Quantity may be varied as per site conditions).
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .