| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.8 LAccepted-Finance | L1 | Accepted-Finance Admitted | |
| 2 | L2₹14.8 L+₹4,440.28 (0.30%)Accepted-Finance | L2 | Accepted-Finance Admitted |
| Sl No | Description | Qty | Unit | 33IEJPS0944L1ZZ L2 | Murugan Contractor L1 |
|---|---|---|---|---|---|
| 1.001.Construction of Culvert across Barur Tank Supply Channel at LS4800m in Maruderi Village H/o.Maruderi. - Rs. 14.95 Lakhs | |||||
| 2.00 | 1. Earth work excavation for foundation in all class of soils except hard rock requiring blasting including cost and conveyance of all etc.,complete. | 47.13 | Cum | 264.31 ₹12,456.93 | 263.52 ₹12,419.7 Lowest |
| 3.00 | 2. Cement concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers . | 6.42 | Cum | 5,636.57 ₹36,186.78 | 5,619.69 ₹36,078.41 Lowest |
| 4.00 | 3. Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specification. | 56.79 | Cum | 7,028 ₹3,99,120.12 | 7,006.96 ₹3,97,925.26 Lowest |
| 5.004. Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel an | |||||
| 6.00 | BGL | 145.86 | Sqm | 548.6 ₹80,018.8 | 546.95 ₹79,778.13 Lowest |
| 7.00 | AGL | 66.99 | Sqm | 1,097.19 ₹73,500.76 | 1,093.91 ₹73,281.03 Lowest |
| 8.00 | 5. Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification. | 3.45 | Mt | 92,042.22 ₹3,17,545.66 | 91,766.64 ₹3,16,594.91 Lowest |
| 9.00 | 6. Rein forcement Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor | 35.26 | Cum | 9,527.99 ₹3,35,956.93 | 9,499.46 ₹3,34,950.96 Lowest |
| 10.00 | 7. Provision for writing Name board | 1 | HR | 501 ₹501 | 499.5 ₹499.5 Lowest |
Tender Value
₹14.9 L
EMD Value
₹15,000
Closing Date
25 Sept 2025, 3:00 pmClosed
BDO BP
BDO Office Kaveripattinam
Kgi Dt Kptm Block Pck No 2025 2026 KPTM 26 Culvert at Barur Channel Maruderi Pts MLACDS Bgr2025 26
2025_RDTN_606878_1
2056_2025_R7_Dt_02_08_2025
Open Tender
Civil Works
Item Rate
180 days
Kaveripattinam
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹15,000
Yes
BDO Office Kaveripattinam
11 Oct 2025
20 Sept 2025
25 Sept 2025
20 Sept 2025
25 Sept 2025
20 Sept 2025
23 Sept 2025
Amount
1.Construction of Culvert across Barur Tank Supply Channel at LS4800m in Maruderi Village H/o.Maruderi. - Rs. 14.95 Lakhs
1. Earth work excavation for foundation in all class of soils except hard rock requiring blasting including cost and conveyance of all etc.,complete.
2. Cement concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers .
3. Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specification.
4. Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel an
5. Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.
6. Rein forcement Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor
7. Provision for writing Name board
8. Provision for Photographics charges
9.Provision for Bitumen Pad
10.Provision for Weep Hole Pipe
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
33IEJPS0944L1ZZ (BID ID -1469787)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .