Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LQualified 19 FIRST FLOOR PALLIVASAL STREET PUDUCHERRY PONDICHERRY PUDUCHERRY 605005 | PONDICHERRY | PUDUCHERRY | 605005 | L1 | Qualified MSE, Category: General | |
| 2 | L2₹3.0 L+₹10,642 (3.66%)Qualified | L2 | Qualified MSE, Category: General | |
| 3 | L3₹3.0 L+₹12,736 (4.38%)Qualified UNIT NO 2201A 22ND FLOOR BRIGADE GATEWAY WORLD TRADE CENTRE RAJAJINAGAR EXTENSION MALLESHWARAM BANGALORE KARNATAKA 560055 UDYAM KR 03 0246934 29AAFCN4300E1ZT B R | BENGALURU URBAN | KARNATAKA | 560055 | L3 | Qualified MSE, Category: General |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
16 Aug 2025, 11:00 amClosed
Clutch plare assy
Release bearing
Exhaust brake system removing and full service and fitting
Ramp assy removing he vehcile and taken to machine shop
stripping
checking
cleaning all damaged seals
springs O ring change and ramp assy and testing and fitting the veh hoos operated
Transfer mounting bracket
Clutch plate assy
Pressure plate assy
The above mentioned old parts removing and afterr servicing fitting the vehcile
vehcile tesing mechanical charge
4X4 assy checking and fully removing full electric connection checking and mechanical fault removing and testing 4X4
Igniition switch
Windscreen
Relay 12 and 24V
Full electrical checking
damaged burning loom change and electrical system service
all light
wiper all testing
Labour for mechanical charge
Door lock RH and LH
Door mechanism RH and LH
Wind screen
The above parts removing and new fitting inccluding windscreen removing and fitting
Brake shoe lining with rivet
Brake drum skimming
Brake booster
Auxiliary gear box mounting bracket
Aixiliary gear box mounting bolt male and female
Rotary switch
All wheel drum and brake shoe assy removing and old parts removing and all parts after servicing fitting the vehicle and brake testing mechanical charges
Full electrical checking
all lighting system service damaged burning loom replaced and tested
Ramp assy removing the vehcile abd taken to machine shop
stripping
checking
cleaning all damaged seals
springs O rings change and ramp assy and testing and fitting the vehcile hood operated
Hood lifting pump removing and taken to machine shop stripping and checking parts seals and o rings damaged shaft damaged filling metal and finishing and pump assy and fitting vehvile hood
Transfer mounting bracket auxiliary gear box
Auxiliary gear box mounting male and nut and bolt
All electrical checking
service and burned and damaged looms change all plighting system testing
The above all parts removing the vehcile and after service fitting the vehcile testing mechanical charges
Ignition switch
Mounting bracket for transfer case
Male and female nut and bolt for transfer case
Clutch booster
Above parts removing and new parts fitting mechanical charge
Full electrical system checking and rectified of burning and damaged loom and sockets and relays
8177481
GEM/2025/B/6530672
Two Packet Bid
Release bearing
45 days
Bangalore
Total value wise evaluation
BOQ
5 documents required · 5 mandatory
Exempted
4 Aug 2025
4 Aug 2025
16 Aug 2025
RELEASE BEARING
Clutch plare assy
Release bearing
Exhaust brake system removing and full service and fitting
Ramp assy removing he vehcile and taken to machine shop
cleaning all damaged seals
springs O ring change and ramp assy and testing and fitting the veh hoos operated
Transfer mounting bracket
Clutch plate assy
Pressure plate assy
The above mentioned old parts removing and afterr servicing fitting the vehcile
vehcile tesing mechanical charge
4X4 assy checking and fully removing full electric connection checking and mechanical fault removing and testing 4X4
Igniition switch
Relay 12 and 24V
Full electrical checking
damaged burning loom change and electrical system service
wiper all testing
Labour for mechanical charge
Door lock RH and LH
Door mechanism RH and LH
The above parts removing and new fitting inccluding windscreen removing and fitting
Brake shoe lining with rivet
Brake drum skimming
Auxiliary gear box mounting bracket
Aixiliary gear box mounting bolt male and female
All wheel drum and brake shoe assy removing and old parts removing and all parts after servicing fitting the vehicle and brake testing mechanical charges
Full electrical checking
all lighting system service damaged burning loom replaced and tested
Ramp assy removing the vehcile abd taken to machine shop
cleaning all damaged seals
springs O rings change and ramp assy and testing and fitting the vehcile hood operated
Hood lifting pump removing and taken to machine shop stripping and checking parts seals and o rings damaged shaft damaged filling metal and finishing and pump assy and fitting vehvile hood
Transfer mounting bracket auxiliary gear box
Auxiliary gear box mounting male and nut and bolt
All electrical checking
service and burned and damaged looms change all plighting system testing
The above all parts removing the vehcile and after service fitting the vehcile testing mechanical charges
Ignition switch
Mounting bracket for transfer case
Male and female nut and bolt for transfer case
Above parts removing and new parts fitting mechanical charge
Full electrical system checking and rectified of burning and damaged loom and sockets and relays
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_8177481.pdf
GEM_BID
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
06_rfp_2025-08-04-11-17-13_c10b6d81346e62ce9e010bad745973dd.pdf
BOQ
boq_item_sample_file_2025-08-04-11-17-13_54dc756e2b3d60145b281a5012a7bb42.csv.pdf
BOQ
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .