Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 LAccepted-Finance MOHALLA GOPALPURA WARD NO 15 DHAMENA ROAD NEAR PRAKASH GARDEN GOPAL PURA SHAMSABAD AGRA UTTAR PRADESH 283125 | AGRA | UTTAR PRADESH | 283125 | L1 | Accepted-Finance DUE TO L1 | |
| 2 | L2₹2.6 L+₹1,581 (0.61%)Accepted-Finance | L2 | Accepted-Finance DUE TOL2 | |
| 3 | L3₹2.6 L+₹4,405 (1.70%)Accepted-Finance | L3 | Accepted-Finance DUE TO L3 |
Tender Value
₹2.6 L
EMD Value
₹13,000
Closing Date
19 Sept 2026, 1:00 pmClosed
eo npp shamsabad agra
npp shamsabad agra
ROOM PUMP HOUSE NIRMAN AP ROAD
2026_DOLBU_1182568_1
186/NPPS/2026-27
Open Tender
Civil Works
Percentage
60 days
NPP SHAMSABAD AGRA
Please refer Tender documents.
2 documents required · 2 mandatory
₹270
eo
₹13,000
30 Sept 2026
5 Sept 2026
19 Sept 2026
5 Sept 2026
19 Sept 2026
5 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil (loam, clay or sand) including lift upto1.50m and lead upto 30m and including filling watering and ramming of excacated earth into the trenchs or into the space between the building and the sides of foundation trenchs or into the plinth and removal and disposal of surplus earth as directed by the engineering In-charge upto distance of 30m from the foundation trenchs SOR 251 | 15.2 | cum | 150 | ₹2,280 |
| 2 | Providing and laying cement concrete in 1:5:10(1cement: 5 fine sand : 10 graded stone aggregate 40mm nominal size) and curing complete, including cost of form work in foundation and | 3.24 | cum | 5,325 | ₹17,253 |
| 3 | RR stone masonary 1:6 cement and coarse sand mortar in foundation and plinth including supply of all material labour
and T&P etc. required for proper completion of the work. SOR | 10.25 | cum | 5,200 | ₹53,300 |
| 4 | Cement Concrete flooring 1:2:4(1 cement : 2 Course sand : 4
graded stone of 20mm nominal size) laid in one layer finished | 1.67 | sqm | 6,600 | ₹11,022 |
| 5 | Class -150 (Non modular brick work in 1:4 cement and coarse sand mortar in SUPERSTRUCTURE including supply of all materials, labour and T&P etc. required for proper completion of the work .as per EIC PWD SOR CH.6 SL. NO.2 6.8,2&5 | 6.4 | sqm | 6,110 | ₹39,104 |
| 6 | 12mm cement plaster with cement mortar in proportion of 1:4 cement & coarse sand of single coat for interior plastering upto floor two level including internal rounded angles chamfers, and rounded angles not exceeding 80mm. In girth and finished even and smooth.as per EIC PWD SOR CH.13 SL. NO.1 | 126.54 | nos | 200 | ₹25,308 |
| 8 | Mild steel or iton work in heavy size such as trusses build, up gates record rack, roof work, gates etc. Brought to required from including drilling holes revitting or welding where necessary and also including supply of steel bolts, nuts, wastage etc and their fixing required for completion of the
work | 167 | nos | 90 | ₹15,030 |
| 9 | R.C.C work with cement approved course send and 2cm (3/4) gauge approved stone ballest in the proportion 1:1.5:3(one part of cement two part of course and threee part of 2cm stone grit) in lntels of doors and windows in excluding supply of reinforcement and its bending and including its fixing and bending the same of 24 BWGI binding wire and including necessary centring and shuttering etc and also including supply of all material labour and tools and plant etc required to proper completation of the work strand of the concrete in all
complete. | 2.08 | cum | 8,700 | ₹18,096 |
| 10 | reinforcement of reinforced concrete or reinforced brick work ( when not including in and all over rates) brought to required shape as necessary including bending for proper completion of the work and including a supply of Steel and its wastage band, hooks, bending wire and authorised overlapping shall be
measured up to floor two level | 240 | kg | 85 | ₹20,400 |
| 11 | S&Lof two coat oil bound approve brand and manufacture of
required shade in all complete SOR page 48 it. No. 24 | 126.54 | sqm | 50 | ₹6,327 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.63 MB
BOQ_2223678.xls
BOQ • 0.31 MB
corriundum19.pdf
PDF • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .