Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹28.6 LAccepted-Finance | 1 | Accepted-Finance Based on the BOQ | |
| 2 | 2₹29.9 L+₹1.3 L (4.66%)Accepted-Finance | 2 | Accepted-Finance Based on the BOQ |
Tender Value
Refer Docs
EMD Value
₹29,000
Closing Date
14 Jul 2022, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Project Director
Integrated Office Complex for Rural Development Department , 1st floor, DRDA, Theni
Renovation of 4 No.s of water bodies under AGAMT II scheme in K Myladumparai Block of Theni District for the year 2021-22
2022_RDTN_238456_1
2635/2021/AGAMT II Dt 28.06.2022
Open Tender
Civil Works - Others
Item Rate
180 days
Theni
As per tender document
3 documents required · 3 mandatory
₹0
₹29,000
1st floor, DRDA, Theni
1 Feb 2023
1 Jul 2022
14 Jul 2022
1 Jul 2022
14 Jul 2022
6 Jul 2022
6 Jul 2022
Amount
Earth Work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20B for foundation
Earth Work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20B for foundation a)0-0.30m
Centering and shuttering charges for Culvert side work including cost and conveyance of all labour charges
Cement concrete 1:3:6 mix using 40mm ISS metal fincluding cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc., completed for foundation.
Rough stone dry packing using rough stone,wedges, including cost and conveyance if all materials to site and all labour charges for mixing laying finishing and curing etc., completed.
Provision for name board
Clearing the light jungle and removed away from the site including all cutting charges and all labour charges as per standard specification.
Earth Work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20B for foundation
Earth Work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20B for foundation - a)0-0.30m
Cement concrete 1:4:8 mix using 40mm ISS metal fincluding cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc., completed for foundation.
Centering and shuttering charges for Culvert side work including cost and conveyance of all labour charges
Cement concrete 1:3:6 mix using 40mm ISS metal fincluding cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc., completed for foundation.
Rough stone dry packing using rough stone,wedges, including cost and conveyance if all materials to site and all labour charges for mixing laying finishing and curing etc., completed.
Provision for name board
Clearing the light jungle and removed away from the site including all cutting charges and all labour charges as per standard specification.
Earth Work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20B for foundation
Earth Work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20B for foundation a)0-0.30m
Cement concrete 1:4:8 mix using 40mm ISS metal fincluding cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc., completed for foundation.
Centering and shuttering charges for Culvert side work including cost and conveyance of all labour charges
Cement concrete 1:3:6 mix using 40mm ISS metal fincluding cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc., completed for foundation.
Rough stone dry packing using rough stone,wedges, including cost and conveyance if all materials to site and all labour charges for mixing laying finishing and curing etc., completed.
Provision for name board
Clearing the light jungle and removed away from the site including all cutting charges and all labour charges as per standard specification.
Earth Work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20B for foundation
Earth Work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20B for foundation a)0-0.30m
Cement concrete 1:4:8 mix using 40mm ISS metal fincluding cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc., completed for foundation.
Centering and shuttering charges for Culvert side work including cost and conveyance of all labour charges
Cement concrete 1:3:6 mix using 40mm ISS metal fincluding cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc., completed for foundation.
Rough stone dry packing using rough stone,wedges, including cost and conveyance if all materials to site and all labour charges for mixing laying finishing and curing etc., completed.
Provision for name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
P. Jayanthi
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .