| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.9 LAccepted-AOC | L1 | Accepted-AOC Lowest amount quoted | |
| 2 | L2₹37.6 L+₹6.7 L (21.6%)Rejected-Finance R O 24 GOKALPUR MAIN ROAD JABALPUR MP 482001 | JABALPUR | MADHYA PRADESH | 482001 | L2 | Rejected-Finance Highest amount quoted | |
| 3 | Rejected-Technical | - | Rejected-Technical Unenlisted Contractor and List of Work Load not received |
Tender Value
₹43 L
EMD Value
₹86,000
Closing Date
15 Oct 2024, 6:00 pmClosed
Lt Col P Aditya Deepak, GE
Garrison Engineer (East), Near COD Estate, Ranjhi, Jabalpur (MP)-482011
PROVN OF EPOXY FLOORING AT BLDG NO 191, 189 AND 07 OF 506 ABW UNDER GE (EAST) JABALPUR
2024_MES_675259_1
8690/E8
Open Tender
Civil Works
Item Rate
270 days
Garrison Engineer (East) Jabalpur
Class D Category a (i)
7 documents required · 7 mandatory
₹500
Garrison Engineer (East) Jabalpur
₹86,000
Yes
16 Dec 2024
19 Sept 2024
17 Oct 2024
19 Sept 2024
15 Oct 2024
28 Sept 2024
19 Sept 2024 - 25 Sept 2024
Amount
EPOXY FLOORING THICKNESS 5 MM 1. SUBSTRATE REQUIREMENTS : Concrete or screed substrate should be a minimum of 25 N/mm2 ,free from laitance ,dust and other contamination. the substrate should be surface dry and moisture shall be 5% and free from rising damp and ground water pressure. grinding and remove all the dust by vaccum Primer : Supply and apply of Epoxy primer HFP 130 /HFP 120 Over the Prepared surface and allow it to dry. Epoxy Under lay : - Providing and applying of Apcoflor LSC 3XI ,Providing and applying 4.00 mm thick over the primed substrate using ,Apcoflor LSC 3 XL of make Asian Paints, 3 component ,stain finish ,self smoothing ,Non tainting and non dusting ,Hard-wearing Abrasion resistant high chemical resistance grade available ,typical use in dry process areas subject to medium duty traffic include clean roos requirement, Apcoflor LSC 3 XI shall be laid at using notch tools followed by spike roll to release all entraped voids and the fully cured topping shall exhibits the typical properties as mentioned in the technical specification on the performance critiria and complete strictly following the coverage and methodology. Supply mixing and appling a Apcofloor SL Epoxy of Asian Paints is a self Paints ,is self smoothing epoxy resin floor finish applied at 1 mm thickness over the Epoxy underaly , Notch shall be used to spread the mixed Epoxy followed by the spike rolling to release the entraped air the cured topping shall attain the following properties ,complete as per the manufacturer instruction. Note : work shall be executed by company authorised Applicator
Polyureathane Resin floor system of MATT FINISH at 6 mm thick using APCOFLOOR PU CRETE 4K XL 1. SUBSTRATE REQUIREMENTS : Concrete or screed substrate should be a minimum of 25 N/mm2 ,free from laitance ,dust and other contamination. the substrate should be surface dry and free from rising damp and ground water pressure. SCRATCH COAT : The substrate must be sound concrete ,surface dry before the application of APCOFLOOR PU CRETE 4K XL at 2.00mm as scratch coat all anchor grooves to be filled with APCOFLOOR PU CRETE 4K XL and allowed for cur ing 13 hour finish as per the manufacturers methodology Anchoring Groves : The APCOFLOOR PU CRETE 4K XL shall be anchored at floor as panel 4.0 m c/c ,Groves must be formed at day joints periphery ,terminations ,all edges bay joints columns door ways, drains and regular centres across the floor joint (75 mm away fro EJ on either side) etc for size 1 times x thickness of the system at all depthx width ,all anchor grooves to be filled with APCOFLOOR PU CRETE 4K XL and allowed for curing 13 hours finish as per the manufacturers methodology TOPPING SYSTEM : - Supplying mixing and laying using APCOFLOOR PU CRETE 4K XL Polurethane resin floor system with smooth matt coloured finished at 4.0 mm thickness ,a chemical resistant ,antimicrobial and inhibits the growth of bacteria , fungi, moulds and milddew ,Non-tainting and non-dusting ,over the scratch coat of APCOLOOR PU CRETE 4K XL scratch coat ,the cured system shall exhibit the following properties Compressive strength (ASTM C 579) 38+/-5% MPa Flexural strength (ASTM C 580 ) 12+/-5% MPa Tensule strength (ASTM C 3074 ) 5.5+/-5% MPa PRODUCT CODE : 1B13 Abrasion Resistance (ASTM D 4060 ) 120 mg loss per 1000 cycles (1 kg load using CS 17 Wheels) Pull up Adhesion on concrete (ASTM D 4541) 1.5 Mpa ,concrete failure , Slip Resistance (Pendulum Test) : classifed moderate Shore D Hardness 24 hOURS (ASTM 240)80 surface Resistivity (ANSI/ESD 2020) 2.SX10 Ohms
Demolition of PCC in ground floors & pavings nexc 15 cm thickness (below or above ground level) (unreinforced)
Removal of existing Epoxy coating and oiling /greasing flooring adhered to concrete floors ,preparation of concrete floor surfaces including removal of adhesives,ingress in concrete,paint splashes,curing compounds,oil and grease,etc and rectifying undulations to smooth surface by light mechanical scrubbing,grinding or grit/captive blasting followed by vaccum cleaning to remove dust,removal of moisture content,repair the undulations if any as directed by Eng-in-charge.
M&L for Racking out of old existing sealent compound and back up road the existing Dummy joints by special tools like cutting blades /machines ,wideing by 2mm by using joint cutting blades of appropriate size ,straight and smooth edges .joint cleaned thoroughly with application of compressed air,joint shall be made dry ,vacuum cleaned and free of dirt oil ,vegetation and other debris .application of two coat of primer with thin brush by forward and backward at an interval of 30 min before pacing the backup rod and pouring the sealent ,thereafter filled with closed cell, medium density, cross linked polythlene foam back road of 8 mm dia for complete length of joint sealent meeting the requirement mentioned in BS-5212,BS-4254 and EN-141875-2003 with minimum movement Accommodation factor (MAF) +/-30% complete all as specified and directed.
M&L for Racking out of old existing sealent compound and back up road the existing Construction joints by special tools like cutting blades /machines ,wideing by 2mm by using joint cutting blades of appropriate size ,straight and smooth edges .joint cleaned thoroughly with application of compressed air,joint shall be made dry ,vacuum cleaned and free of dirt oil ,vegetation and other debris .application of two coat of primer with thin brush by forward and backward at an interval of 30 min before pacing the backup rod and pouring the sealent ,thereafter filled with closed cell, medium density, cross linked polythlene foam back road of 12 mm dia for complete length of joint sealent meeting the requirement mentioned in BS-5212,BS-4254 and EN-141875-2003 with minimum movement Accommodation factor (MAF) +/-30%complete all as specified and directed.
M&L for Racking out of old existing sealent compound and back up road the existing Expansion joints by special tools like cutting blades /machines ,wideing by 2mm by using joint cutting blades of appropriate size ,straight and smooth edges .joint cleaned thoroughly with application of compressed air,joint shall be made dry ,vacuum cleaned and free of dirt oil ,vegetation and other debris .application of two coat of primer with thin brush by forward and backward at an interval of 30 min before pacing the backup rod and pouring the sealent ,thereafter filled with closed cell, medium density, cross linked polythlene foam back road of 30 mm dia for complete length of joint sealent meeting the requirement mentioned in BS-5212,BS-4254 and EN-141875-2003 with minimum movement Accommodation factor (MAF) +/-30% complete all as specified and directed.
M&L for 150 mm thick of concrete Forming 12mm thick Expansion joints filled with pre-formed bituminous filler and top 30mm primed and sealed with sealing com pound, Grade ‘A complete all as specified and directed.
Forming Contraction (Dummy) joints 65mm deep x 10mm wide, filled with sealing compound complete all as specified and directed.
M&L for 100mm thick PCC type B-2, (1:2:4) using 20mm graded stone aggregate Finished even & smooth without using extra cement complete all as specified and directed.
M&L for Granolithic concrete 1:1:2 floor topping 30mm thick; laid over PCC subfloors etc. & finished to an even & fair surface complete all as specified and directed.
M&L for Wearproof topping as specified (incorporating an approved metallic floor hardner), laid on concrete floors & pavings, & finished even & smooth (except metallic hardner) Thickness of topping 20 mm thick complete all as specified and directed.
Supply only metalic floor hardener complete.
Schedule of credit amount of Rs. 188986.50 to be deducted during AOC.
m/s R K SETHI (BID ID -3132707)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .