Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹23.7 LAdmitted-Finance | -40.00% | ₹23.7 L | L1 | Admitted-Finance |
| 2 | L2₹25.1 L+₹1.4 L (5.75%)Admitted-Finance | -36.55% | ₹25.1 L+₹1.4 L (5.75%) | L2 | Admitted-Finance |
| 3 | L3₹25.3 L+₹1.6 L (6.65%)Admitted-Finance | -36.01% | ₹25.3 L+₹1.6 L (6.65%) | L3 | Admitted-Finance |
| 4 | L4₹25.4 L+₹1.6 L (6.85%)Admitted-Finance | -35.89% | ₹25.4 L+₹1.6 L (6.85%) | L4 | Admitted-Finance |
| 5 | L5₹26.1 L+₹2.3 L (9.77%)Admitted-Finance | -34.14% | ₹26.1 L+₹2.3 L (9.77%) | L5 | Admitted-Finance |
Tender Value
₹39.6 L
EMD Value
₹79,120
Closing Date
30 Jul 2026, 4:00 pmClosed
Executive Engineer
R and B Division Karan Nagar Srinagar
Construction of Platform including Supply of Storage Water Tanks above HFL at Girls Hostel GMC Srinagar
2026_PWDJK_317498_1
etendering NIT 24 Karan Nagar Srinagar
Open Tender
Civil Works
Percentage
75 days
GMC
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,100
Executive Engineer
₹79,120
11 Aug 2026
23 Jul 2026
31 Jul 2026
23 Jul 2026
30 Jul 2026
23 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil: 50 meter beyond 1 m from cutting edge. | 28.55 | Cum | 673.3 | ₹19,222.72 |
| 2 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including disposal of excavated earth, lead upto 50 meter and lift upto 1.5m, as directed by Engineer-in-Charge. All kinds of soil: | 84.79 | Sqm | 91.75 | ₹7,779.48 |
| 3 | Providing & laying of stone soling hand packed in foundation and plinth including ramming, watering, compaction & lead lifts all carriages upto site of work complete. | 20.88 | Cum | 1,000 | ₹20,880 |
| 4Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: | |||||
| 4.01 | 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 10.89 | Cum | 5,202.9 | ₹56,659.58 |
| 4.02 | 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 15.45 | Cum | 6,591.25 | ₹1,01,834.81 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 16.49 | Cum | 7,788.4 | ₹1,28,430.72 |
| 6 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 11.42 | Cum | 218.4 | ₹2,494.13 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto and above plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more | 1,319.6 | Kg | 123.2 | ₹1,62,574.72 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns | 117.33 | Sqm | 286.35 | ₹33,597.45 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.54 MB
BOQ_1040998.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .