Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹16.2 CrAccepted-AOC | ₹16.2 Cr Quoted ₹13.7 Cr | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹14.3 CrRejected-AOC 142 | ₹14.3 Cr | L-2 | Rejected-AOC L-2 |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/S SHIV SHAKTI CONSTRUCTION L2 | ASHUTOSH KUMAR VERMA L1 |
|---|---|---|---|---|---|
| 1.00INSTRUMENTATION | |||||
| 1.01 | Supplying and Fixing of strong motion accelerograph with + full scale range (1g offset in vertical due to gravity) 64 GB SD Card stroage memory, installation kit (anchor, threaded rod, nut anchor setting tool.) with all cost of material, labour, T&P etc. complete with maintenance upto 1 year. | 1 | Nos | 1,00,000 ₹1,00,000 Lowest | 8,00,000 ₹8,00,000 |
| 1.02 | Supplying and Fixing of HP PC Core I3 8GB RAM 256 SSD/20 Inch LED/Win 11 with all cost of material, T&P etc. complete with maintenance upto 1 year. | 1 | Nos | 40,000 ₹40,000 Lowest | 50,000 ₹50,000 |
| 1.03 | Supplying of 8 seater flyer Boat with 40 hp 2 stroke tiller Yamaha engine with all cost of material, labour, T&P etc. complete with maintenance upto 1 year. | 1 | Nos | 7,00,000 ₹7,00,000 | 6,00,000 ₹6,00,000 Lowest |
| 1.04 | Supplying and Fixing of D.G. Set 10 kva-I Phase genset Company- Sunrise, Silent, Self start, Auto Stop Including Battery with all cost of material, labour, T&P etc. complete with maintenance upto 1 year. | 1 | Nos | 1,50,000 ₹1,50,000 Lowest | 2,00,000 ₹2,00,000 |
| 2.00UPSTREAM BOULDER PITCHING | |||||
| 2.01 | Dismantling of old pitching U/S Slope of Dam including stacking all labour t&p etc complete. | 9,545.81 | M3 | 82 ₹7,82,756.42 | 50 ₹4,77,290.5 Lowest |
| 2.02 | Supplying and Laying Filter material (coarse sand) below Boulder pitching in u/s slope of dam i/c cost of all material, labour T&P etc. | 7,781.91 | M3 | 2,325 ₹1,80,92,940.75 | 1,800 ₹1,40,07,438 Lowest |
| 2.03 | Supplying and Laying Filter material (Shingle Size 12-20mm) below Boulder pitching in u/s slope of dam i/c cost of all material, labour T&P etc. | 7,781.91 | M3 | 2,325 ₹1,80,92,940.75 | 1,800 ₹1,40,07,438 Lowest |
| 2.04 | Laying old boulder pitching 20 to 40 kg. boulder in u/s slope of dam i/c cost of labour and T&P etc. | 9,545.81 | M3 | 330 ₹31,50,117.3 | 300 ₹28,63,743 Lowest |
Tender Value
₹15.2 Cr
EMD Value
₹30.4 L
Closing Date
2 Apr 2026, 3:00 pmClosed
SUPERINTENDING ENGINEER
SE VTH CIRCLE IRRIGATION WORKS BAREILLY
Rehabilitation and Improvement of Baigul Dam under DRIP-II in District Udham Singh Nagar
2026_UPIDC_1115345_1
05/SE/2025-26
Open Tender
Civil Works
Item Rate
540 days
UDHAM SINGH NAGAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
Yes
₹30.4 L
Yes
BAREILLY
16 Jul 2026
21 Feb 2026
2 Apr 2026
21 Feb 2026
2 Apr 2026
21 Feb 2026
7 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1INSTRUMENTATION | |||||
| 1.01 | Supplying and Fixing of strong motion accelerograph with + full scale range (1g offset in vertical due to gravity) 64 GB SD Card stroage memory, installation kit (anchor, threaded rod, nut anchor setting tool.) with all cost of material, labour, T&P etc. complete with maintenance upto 1 year. | - | Nos | - | - |
| 1.02 | Supplying and Fixing of HP PC Core I3 8GB RAM 256 SSD/20 Inch LED/Win 11 with all cost of material, T&P etc. complete with maintenance upto 1 year. | - | Nos | - | - |
| 1.03 | Supplying of 8 seater flyer Boat with 40 hp 2 stroke tiller Yamaha engine with all cost of material, labour, T&P etc. complete with maintenance upto 1 year. | - | Nos | - | - |
| 1.04 | Supplying and Fixing of D.G. Set 10 kva-I Phase genset Company- Sunrise, Silent, Self start, Auto Stop Including Battery with all cost of material, labour, T&P etc. complete with maintenance upto 1 year. | - | Nos | - | - |
| 2UPSTREAM BOULDER PITCHING | |||||
| 2.01 | Dismantling of old pitching U/S Slope of Dam including stacking all labour t&p etc complete. | 1 | M3 | - | - |
| 2.02 | Supplying and Laying Filter material (coarse sand) below Boulder pitching in u/s slope of dam i/c cost of all material, labour T&P etc. | 1 | M3 | - | - |
| 2.03 | Supplying and Laying Filter material (Shingle Size 12-20mm) below Boulder pitching in u/s slope of dam i/c cost of all material, labour T&P etc. | 1 | M3 | - | - |
| 2.04 | Laying old boulder pitching 20 to 40 kg. boulder in u/s slope of dam i/c cost of labour and T&P etc. | 1 | M3 | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
BOQ_2069356.xls
BOQ • 0.37 MB
BIDDOCUMENTDRIP.pdf
Tender Documents • 4.64 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].