Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹91.5 Cr
EMD Value
₹1.8 Cr
Closing Date
28 Oct 2026, 3:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Superintending Engineer and Project Director PIU-I
Office of the Superintending Engineer and Project Director Project Implementation Unit - I,P.W. (Roads) Directorate, 3No. Commissariat Road Hastings Kolkata-700022.
Widening and Strengthening of Bankura Khatra Road (SH-2) from 11.20 Kmp to 45.00 Kmp under Bankura Sub-Division No-II under Bankura Division, P.W.D. in the district of Bankura.
2026_WBPWD_5075088_1
WBPWD/PW(R)/SEPD/PIU-I/NIT-27 OF 2026-2027
Open Tender
CIVIL WORKS
Percentage
650 days
Bankura, West Bengal
Please refer Tender documents.
5 documents required · 5 mandatory
₹1.8 Cr
Yes
Project Implementation Unit - I, P.W.(Roads) Direc
24 Sept 2026
24 Sept 2026
30 Oct 2026
25 Sept 2026
28 Oct 2026
2 Oct 2026
1 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0PART-A: ROAD WORK | |||||
| 1.01 | Clearing and Grubbing Road Land Remarks Complete Rate Labour, T&P, Machinery etc. Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. (Reference to MoRT&H's specification clause 201)
By Mechanical Means
In area of light jungle | 15.74 | Hectare | 49,712.71 | ₹7,82,279.2 |
| 1.02 | Dismantling of Structures
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres (Reference to MORT&H's specification clause 202)
By Manual Means
Lime Concrete, cement concrete grade M-10 and below | 18 | cum | 439.63 | ₹7,913.34 |
| 1.03 | Dismantling of Structures
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres (Reference to MORT&H's specification clause 202)
By Mechanical Means
Prestressed / reinforced cement concrete grade M-20 & above | 18 | cum | 863.79 | ₹15,548.22 |
| 1.04 | Dismantling of Structures
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres (Reference to MORT&H's specification clause 202)
Dismantling Brickwork
In cement mortar | 90 | cum | 354.56 | ₹31,910.4 |
| 1.05 | Cold Milling
Cold Milling of Bituminous Pavement surface upto the required depth by mechanical means using milling machine, without disturbing the under lying layers, to proper line and level, cleaning the surface properly after milling and removing the loose materials, stacking the milled materials for re-use, necessary guarding, barricading & lighting, including hire charges of machinery, cost of fuel and labour and other incidental charges all complete and as per direction of Engineer-in-Charge.
For depth upto 100mm | 1,81,500 | sqm | 41.25 | ₹74,86,875 |
| 1.06 | Construction of Embankment with Material obtained from Borrow pits
Construction of embankment with approved material obtained from borrow pits (from Govt. land) with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 & 300-1 .The size course material in the mix of earth ordinarily shall not be exceed 75mm.(Reference to MoRT&H's specification clause 305).
Using Govt. Land | 18,930.59 | cum | 165.1 | ₹31,25,440.41 |
| 1.07 | Construction of Embankment with Material obtained from Borrow pits
Construction of embankment with approved material obtained from borrow pits (land owned/arranged by the Agency with Royalty) with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 & 300-1 .The size course material in the mix of earth ordinarily shall not be exceed 75mm.(Reference to MoRT&H's specification clause 305). Cost of compensation for Earth material & its carriage from private land at 5km distance have been included in the rate.
[Note: Royalty as appicable will be deducted from Agency's bill if not produce Royalty clearance certificate from the competent authority.] | 12,620.39 | cum | 216.71 | ₹27,34,964.72 |
| 1.08 | Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with Disposal upto 1000 metres.
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m (Reference to MoRT&H's specification clause 301 in 5th Revision). | 91,556.21 | cum | 83.99 | ₹76,89,806.08 |
| 1.09 | Construction of Embankment with Material Deposited from Roadway Cutting
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2 & 300-1.The size course material in the mix of earth ordinarily shall not be exceed 75mm.(Reference to MoRT&H's specification clause 305).
[Note In case the earth cutting is done by dozer and pushed for filling in the embankment, the input of dozer in the cost of embankment i.e. ₹ 39.63/m3 (excluding overhead, Contractor profit & L.W. cess) shall be deducted from theEstimated Rate as the same is already provided in the cost of excavation. However, if the earth is dumped by tippers from roadway cutting, the input of dozer for spreading is required to be provided]. | 73,244.97 | cum | 103.67 | ₹75,93,306.04 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 21.38 MB
FORM2911ii_Supervision_Consultant.pdf
Tender Documents • 0.67 MB
BOQ_5164033.xls
BOQ • 0.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .